512-1101 W EMERALD PALM LNPermit
BLD ELE MEC PLM
r X X X X
Permit Number: BLD2023-04720
Issued: 06/26/2024
www.anaheim.net/building
(714)765-4626
Quarter Section: 60
CITY OF ANAHEIM
BUILDING DIVISION
200 S. ANAHEIM BLVD.
(714) 765 - 5153
Site Address: 512-1101 W EMERALD PALM LN, Anaheim, CA 92801
Legal Description: A TR MILES RANCHO BLK LOT 13 MILES RANCHO LOT 13 N
APN: 27107107
Project Description: New Residential Construction: 11,018 St. to construct (7) 3-story attached condos with 3,566 sf. of attached garages,
365 sq. ft. of covered porch, 999 sf. of decks and (9) awning. Install roof mounted solar system. Install (7) EV chargers. REF:
TRACT2022-00004 (Tract 19170)
Building Type 401
(1) 1,424 sf. 3bd/2.5blhs (Plan Type 2A)
(1) 1,406 sf. 3bd/2.5bth (Plan Type 2B)
(2) 1,420 sf. 3bd/3bths (Plan Type 3A)
(1) 1,693 sf. 4bd/4bths (Plan Type 4A)
(1) 1,693 sf. 4bd/4bths (Plan Type 4C)
(1) 1,962 sf. 4bd/3bths (Plan Type 5A)
LMng Area:
11018
Number of Stones:
3 Valuation: 6,600,000.00
Garage Area:
3566
Construction Types: VB
Carport Area:
Occupancy Groups: . R2, U1, R2, U1, R2, Ui, R2, Ut, R2, U1. R2
Balcony / Deck Area:
999
Fire Sprinklered:
Cool Roof:
Total Fees paid for Permh: 102,01051
People Associated with Project:
Contractor KB HOME COASTAL INC
10990 WILSHIRE BLVD SUITE 700,LEGAL DEPT LEGAL DEPT 199911160813085820 LOS
F
Permit Applicant Frank Chen
1 Technology Building I, Suite 801 Irvine, CA 92618
Owner RIFF DENNIS S TR D S
1085 N HARBOR BLVD
Type Electrical Fixtures
Oty
Type Plumbing Fixtures
Qty Mechanical Fixtures
Qty
EV Charger
7
Bath Tub
7 Condenser
7
Meter/Disc Sw - Under 600 V, over 500
1
Dishwasher
7 Healing Appliances, including vent
7
amps to 1000 amps
Garbage Disposal
Heating/Cooling Coil
7
7
MeterlDisc Sw -Under 600 V, up to 200
8
Residential Registers (ducts)
140
amps
Gas System (outlets)
7 Ventilation Fan - <= 300 cfm on single duct
34
Microinverter
70
Kitchen Sink
7
Motors - Factory Wired Appliance, up to 1
12
Lavatory
30
h.p.
New or total rewire - garage/carport
3566
Repair/Drainage Alteration Vent Piping
7
New or total rewire - multi -family
11037
Sewer per 100 ft.
1
Sub Panel/Temp Pwr- Under 600 V, up to
8
Shower
14.
200 amps
Washing Machine Rough
7
Water Closet
23
Water Distribution
7
Water Heater
7
Water Main per 100 ft.
1
The permit shall expire by limitation and become null and void if the building or work has not passed final inspection 365 days from the
date of permit issuance. A new permit Is required to commence or continue work.
yt,HE1M c
City of Anaheim r��0
Building Division Ih i
\V >
�DUNDED fA�^
Do not occupy this buildina until the final inspections have been made.
FINAL INSPECTIONS
DATE
INSPECTOR
All applicable items below must be signed before utilities are released
Final Gas Test
Electrical Final
Plumbing Final /
Mechanical Final
Cross Connection Control (714) 765-4280
Engineering Final (714) 765-5126
INSPECTION
I DATE I INSPECTOR
Fire Sprinkler (ONLY) (714) 765-6041
Do not pour concrete until the following applicable items have been signed:
Fire Dept. Final (714) 765-5041
Plumbing (Ground/Underfloor Drain Waste)
Water Engineering (714) 765-4591
Electrical Ground Electrode/Ufer
DJ I
Sub List/Bus. Lic. (714) 765-5194 (Allow 10 business days)
Setback/Forms/Trenches (Footings)
T
COA/Migation Measures
Do not install subfloor or pour floor slab until the follwing applicable items have been
sianed
Building Final (714 765-5153)
Last Inspection -Final Only After Above Completed
.J,
.67
Plumbing (Ground/Underfloor Water)
Underfloor Rough Gas
PARTIAL INSPECTIONS
Building Inspections } ; r�
7 3/ � J"� � / Fl—re P"z'
Mechanical (Groundwork)
Electrical (Underground Conduit)
Pre -slab (Compaction/Membrane ReinL)
r
Floor (Joist/Girders)
Underfloor Insulation (Raised Foundation Only)
j ,/—
Floor Nailing (Raised Foundation Only)
2nd Floor (Floor Nailing)
1114TW�.���(
/ -T kl .� .S �iJ
Do not cover or conceal the work below until the following applicable items have
been sianed
tat Floor Shear
Firesprinkler (Rough) (Fire Dept.)
Mechanical Ins 'ections
&' -10 Ov-l.�/i.0
2nd Floor Shear
01,
/
Roof(Sheathing/Diaphragm/Frame)
or{r//
/ zg.064of
Masonry (Reinf./Bond Beam/Pre-Grout)
7' r
Rough Plumbing (Top Out)
r', dP7/ f f�S of rl
Rough Duct (Mechanical)
Rough Mechanical
Rough Electrical
Rough COAIMitagation Measures
Plu;obi no Inspections
Framing (Only after Plbg., Ele.. Mec. & Fire)
Insulation (Sound/Energy)
Do not tape or plaster until the following applicable items have been signed:/a�'
Drywall
-
Drywall Penetrations (Ele, Mec & Pibg)
J / 4, y �'
Interior Lath
j q.-) ice.+✓ 112,SNat rc:
Exterior Lath p/j ONLY y / aY .I.$-G
Electrical Ins ections ^ (�P„r,�O,p,
cZ' t� `rG .V
9 /o1�
Electrical Service Meter -(Meter will be set within 2-3
business days after approval) Excludes Now
Construction
/� /
(,i
Exterior Plaster (Brown Coat)
o
t
N �, d .�c. g/6 /
T-Bar (Struct., Ele., or Mec.)
S% L/1 fl (2 SSG
Grease Interceptor
�Do not backfifl unless sinned off)
A*
Sewer
Water Engineering Backflow (Testable Only)
Water Service
7-1
JA
ELECTRIC, IN C.
Electrical Contractor
UC,r M3
November 4, 2024
City of Anaheim
Department of Building and Safety
RE: KB Home Coastal, Inc.
Palm Court 1
Tract # 19170 Ph:5
Lots: 8/14
Phase 5 — BLDG 2
Lot # 8
1089 N. Paradise Pahn Ln
Lot # 9
1091 N. Paradise Palm Ln.
Lot # 10
1093 N. Paradise Palm Ln.
Lot # 11
1095 N. Paradise Palm Ln.
Lot # 12
1097 N. Paradise Palm Ln.
Lot # 13
1099 N. Paradise Palm Ln.
Lot # 14
1101 N. Paradise Palm Ln.
To Whom It May Concern:
This letter certifies that we have torqued the electrical panel and circuit breaker lugs to
the recommended manufacturer's specification on the above -mentioned lots.
Sincerely,
Randy Berry
Vice President
`T' McGee Electric, Inc.
P.O. Box 1111 • Chino, CA 91708 • (909) 591-6461
2390 Reservoir St. • Pomona, CA 91766 • Fax (909) 590-2971
EXHIBIT D
City of Anaheim
Public Works — Engineering
Subdivision Section
200 S. Anaheim Blvd., Room 276
P.O. Box 3222
Anaheim, California 92803
SUBJECT: CIVIL ENGINEER'S CERTIFICATION FOR ROUGH
GRADING FOR BUILDING PADS — BLDG #S 1-3
REFERENCE:
Grading Plan Number: GRA 2022-03794
Job Address: 1075 N Harbor, Anaheim, CA
Map No. TTM 19170
Work Began: June, 2023
Work Completed: June, 2023
In accordance with the Anaheim Municipal code, Title 17, and the requirements of the
permit, I certify that the rough grading for building pad (s) for the above referenced
project was done in accordance with the approved grading plan and is in full compliance
with all codes.
This certification does not include approval of the placement and compaction of
earthwork within the purview of others.
By: Date 6/14/2023
Ryan J. Bitmer, Principal P.E. # 68167
Naive and Title
Company Name:
C&V Consulting, Inc.
•
HARBOR BLVD
wMa
W
2
r
C m
_
mq
fop
4 •- � � � YF t4 �, �i. it
STRUCTURAL OBSERVATION means the visual observation of the structural system, for general conformance to
the approved plans and specifications, at significant construction stages and at completion of the structural system.
Structural observation does not include or waive the responsibility for the inspections required by Section 108. 1701
or other sections of the code.
This report includes all construction work througt 16'" day of September
Report No.
2024 Page No. of
P¢;L_a AtltllgSA Slq:cfurl nlis�rver N na?rrd (SOFry
r.
1075-7085 N. Harbor Blvd, Anaheim CA 92801 Mark A. Vangaale
714-978-9780
Perrot W,
Stm ural Otrserce4or. Paeorrned by
Pminsxonai Lm 4i^y w or
I ' 00,1."u
BLDG2023-04720
VCA
C-58680
714-978-9780
OBSERVED STRUCTURAL ELEMENTS AND THEIR CONNECTIONS
FOUNDATION
WALL
FRAMES
FLOOR
ELEMENTS/CONNECTION
OBSERVAI [ON LOCATION
C Footing, Stem Walls. Piers
❑Concrete -❑Steel Moment Frame
[Concrete
Phase 5, Building #2 (type
400), Lots 8-14, Framing &
C Mat Foundation
CI Masonry uSteel Braced Frame
i.: steel Deck
shear connectors all levels.
Caisson, Piles, Grade Beams
xWood i-Concrete Moment
X Wood
Frame
LI Stepp'ry'Retain'g Foundation,
t- Others I Ci Masonry Wail Frame
I
C Others
j
Hillside Special Anchors
NOTED DEFICIENCIES with the proposed corresponding corrective actions with respect to general conformance
with the approved plans or in the bad path: (A final report by the structural observer which states that all observed
deficiencies havebeen resolved is required before acceptance of the work by thebuilding officials.)
No Observed Deficiencies
I DECLARE THATTHE FOLLOWING STATEMENTS ARE TRUETOTHE BESTOF MY KNOWLEDGE
1, IAM THE ENGINEER OR ARCHITECT RETAINED BY THE OWNER TO BE IN RESPONSIBLE
CHARGE FORTHE STRUCTURAL OBSERVATION IN ACCORDANCE WRHTHE REQUIREMENTS
OF THE CITY OF RIVERSIDE.
2 1, OR ANOTHER ENGINEER OR ARCHITECT WHO I HAVE DESIGNATED ABOVE AND IS
UNDER MY RESPONSIBLE CHARGE, HAS PERFORMED THE REQUIRED SITE VISITS AT
EACH SIGNIFICANT CONSTRUCTION STAGE TO VERIFY IFTHE STRUCTURE IS IN
GENERAL CONFORMANCE WITH APPROVED PLANS AND SPECIFICATIONS.
3 ALL NOTED DEFICIENCIES WHIC REMAIN TO BE CORRECTED HAVE BEEN INDICATED
ABOVE;
4. I RECOMMEND THAT ACC PT CE OF THE STRUCTURAL SYSTEMS BY THE CITY OF
Anaheim BE wi NT A L OBSERVED DEFICIENCIES ARE CORRECTED.
9/ 16/2024
SIGNATURE OF STAUCTUIPIAL oe ERVER DATE
5-4WP i7 STRJC.TUN, I O*F 1_ A;:
` EOTEC CAIL
OPTIMIZED SOIL ENGINEERING
Protect Memorandum
To: KB Home Date: May 13, 2024
9915 Mira Mesa Boulevard, Suite 100 Project No. 22025-02
San Diego, California 92131 Permit No.: GRA2022-03794
Attention: Mr. Jesse Kliest
Subject: Geotechnical Recertification of Building Pad 2, Palm Court I, 1075 North Harbor
Boulevard, Tentative Tract Map 19170, Anaheim, California
Reference: SA Geotechnical, Inc., 2023, Report of Geotechnical Observation and Testing During
Grading of Building Pads 1 through 3, Pahn Court 1, 1075 North Harbor Boulevard,
Tentative Tract Map 19170, City of Anaheim, California, Project No. 22025-02, Dated
June 20, 2023.
Per the request of the site superintendent (Jarred Gormly, Murow Development Consultants), SA
Geotechnical, Inc. (SA GEO) has prepared this project memorandum documenting our geotechnical
recertification of Building Pad 2 at the subject site. SA GEO previously reported the observation and
compaction testing during grading of the subject building pads (SA GEO, 2023).
Dennys Pointon of SA GEO was onsite to observe the building pad after completion of utility construction
adjacent to the pad. Based on our observation and probing, the compacted fill was found to be moist and
dense/firm. The subject building pad is considered suitable from a geotechnical viewpoint.
If you have any questions regarding this project memorandum, please contact our office.
Respectfully submitted,
SA GEOTECHNICAL, INC.
Reza Saberi, GE 3071
Principal Engineer
1000 North Coax I-lightcay Suite 10 . Laguna Bcach. Ca)It"ll'nla 92(,51 0 I949) 401-7„9 . SAgeolechnicaLc�nn
G(ET®ITIE�CHNICAL
June 20, 2023
Project No. 22025-02
Permit No.: GRA2022-03794
To: KB Home
9915 Mira Mesa Boulevard, Suite 100
San Diego, California 92131
Attention: Mr. Jesse Kleist
Subject: Report of Geotechnical Observation and Testing During Grading of Building Pads
1 through 3, Pahn Court I, 1075 North Harbor Boulevard, Tentative Tract Map
19170, City of Anaheim, California
References: SA Geotechnical, Inc., 2022, Geotechnical Due Diligence Review, Proposed 31-
Unit Residential Development, 1077 and 1085 North Harbor Boulevard and 523
West Victor Avenue, City of Anaheim, California, Project No.: 22025-01, Dated
April 15, 2022.
SA Geotechnical, Inc., 2023, Response to City of Anaheim Geotechnical Report
Review Sheet, Proposed 31-Unit Residential Development (Palm Court I), 1077
North Harbor Boulevard, Anaheim, California, Project No.: 22025-01, Dated
February 6, 2023.
INTRODUCTION
At your request, SA Geotechnical, Inc. (SA GEO) has provided geotechnical observation and
testing services during grading for the Palm Court I residential project located at 1077-1088 North
Harbor Boulevard, City of Anaheim, California. This report includes the results of our
geotechnical observation and testing during grading of Building Pads 1 through 3.
Grading generally consisted of remedial removals of the upper 5 feet of existing undocumented
fill and weathered/unsuitable alluvium, moisture -conditioning, and recompaction. Remedial
removals extended at least 5 feet beyond the building footprint.
Based on our observation and testing, grading of the subject site has been completed in substantial
compliance with our recommendations (SA GEO, 2022 and 2023), the project requirements, and
the requirements of the City of Anaheim.
ATTACHMENTS
Table 1— Summary of Maximum Density Tests — Rear of Text
Table 2 — Summary of Field Density Test Results — Rear of Text
Plate 1 — Geotechnical Map — Rear of Text
�IIIIII IJ, I��i iKl'.�lll `h��l`nil. ��•�pl'119;: ��C:IC,'Ll ❑L I' .� i=IV-�'�I-�.R-`-':..A�i.-i.� �..._.., ..VL.
22025-02
June 20, 2023
FIELD AND LABORATORY TESTING
Geotechnical observation and testing was conducted on a full-time basis by representatives of SA
GEO. Compacted soils were tested for relative compaction using ASTM Test Method D6938
(nuclear gauge). Maximum density and optimum moisture content of onsite soils were determined
by ASTM Test Method D1557. The maximum density test results are presented in Table 1. Field
density test results are presented in Table 2, Summary of Field Density Test Results. The
approximate test locations (including remedial removal bottoms) are depicted on the Geotechnical
Map (Plate 1). The precise grading plan, prepared by C&V Consulting, Inc. Civil Engineering,
was used as the base map to present the grading observed and tested by SA GEO representatives.
Two samples were collected upon the completion of grading for Building Pads 1 through 3 to
confirm the expansion potential and corrosivity of onsite soils. The results indicate "Very Low"
expansion potential (EI-0) and negligible soluble sulfate content, as anticipated and discussed in
the referenced reports.
SITE LOCATION AND DESCRIPTION
The subject site is located at 1075 North Harbor Boulevard in the city of Anaheim, California. The
site is bound to the south by West Victor Avenue, North Harbor Boulevard to the east, an existing
motel and mobile home park to the north, and existing single family residential and an apartment
community to the west. The site was previously occupied by a strip mall structure, automotive
service building, medical building, and at -grade parking lots. Demolition of the prior
improvements and structures was completed prior to the subject precise grading.
GRADING
Following demolition of the existing buildings and prior to grading, the site was cleared of
deleterious materials (including vegetation, pavement, concrete, metal, plastic, trees, wood,
organics, existing utility pipelines, etc.) and disposed of offsite.
Grading was performed by Elite Earthworks & Engineering between May 24 through June 2, 2023,
under the geotechnical observation and testing of SA GEO. The remedial removals consisted of
removal and recompaction of existing undocumented fill and weathered/unsuitable alluvium.
Removals within the building pads were performed to a minimum of 5 feet below original grade
and extended a minimum of 5 feet beyond the limits of the proposed building pads, in order to
provide a uniform fill blanket below the buildings.
Excavated onsite soils and approved import soils were used as fill materials. Prior to placement of
fill, the removal bottoms were observed, mapped, and probed to confirm competent native
materials were exposed. The removal bottoms were also scarified, moisture -conditioned, and
recompacted prior to placement of fill. Fill materials were placed in approximately 8-inch-thick
loose lifts, moisture -conditioned, and compacted using heavy, rubber -tired earth -moving.
Observation and testing during fill placement were performed to verify that a minimum relative
compaction of 90 percent, with adequate moisture content, was achieved.
230620 KB P.I. Cnun 1122W 5-021 Bid., 1-3 KcrymA. .
S/�A
22025-02
June 20, 2023
CONCLUSION AND RECOMMENDATIONS
Based on our observation and testing, we conclude that the work performed is geotechnically
acceptable and in substantial compliance with our recommendations (SA GEO, 2022 and 2023).
The building pads (for Buildings I through 3) are considered suitable for the intended use. The
geotechnical recommendations provided in the referenced reports remain valid and should be
implemented during future design, precise grading and construction of the proposed development.
The geotechnical consultant should perform geotechnical observation and testing during the
following phases of grading and construction:
• Upon completion of any foundation excavations prior to placement of reinforcement or
pouring of concrete;
• During slab- and flatwork-subgrade preparation, prior to placement of concrete;
• During placement of backfill for utility trenches and retaining walls (if any); and
• When any unusual soil conditions are encountered during construction subsequent to the
issuance of this report.
LIMITATIONS
The means and methods used by SA GEO for the observation and testing reported herein are based
on local geotechnical standards of practice, care, and requirements of governing agencies. No
warranty or guarantee, expressed or implied, is given. The conclusions of this report are based on
limited site observations by this office during grading and are not intended to imply control of
construction practices or of nature. Adherence to project plans, specifications, and the
requirements of the City of Anaheim is the duty of those performing the work. This report or its
contents should not be used or relied upon for other projects or purposes, or by other parties without
the acknowledgement of SA GEO and the consultation of a geotechnical professional.
D%20 KU V.I. Cuun 1(220n4)2) OW I-) C.m .lion RcOnrt.Gux
SX,
22025-02
June 20, 2023
We appreciate the opportunity to provide our services. If you have any questions or comments,
please contact this office.
Respectfully submitted,
SA GEOTECHNICAL, INC.
Reza Saberi, GE 3071
Principal Engineer
Distribution: (1) Addressee (E-Mail)
(1) Tyler Faulkner, Murow Development Consultants (E-Mail)
El
230620 KR P.I. Co,m 1122035-021516 IJ C..Wlion RCPon.dacx
CONSULTING, INC.
CIVIL ENGINEERING
LAND PLANNING & SURVEYING
July 8, 2024
City of Anaheim
Building and Safety Division
200 S Anaheim Boulevard
Anaheim, CA 92805
Attention: City Grading Inspector
Subject: Civil Engineers / Surveyor's Form Certification
Reference: Tract No. 19170 — Building # 2
Project: Grading Permit Number GRA 2022-03794
Job Address 1075 N. Harbor, Anaheim, Ca
Owner KB Home Coastal
Work Began Auoust 2023 Work Completed July 2024
Please be advised the building foundation forms are in substantial conformance with the precise grading
plans as to horizontal and vertical location. The building setbacks were measured in relation to the
property lines and were found to be in substantial conformance with the approved precise grading plans
for this property.
Date: 7/8/2024
Signature
Ryan J. Bittner R.C.E. # 68167
Company Name/ Address: C & V Consulting, Inc. QQOFESS
9830 Irvine Center Drive Quo e
Irvine, CA 92618 ti �Pa
(949)916-3800 W
No. 68167
, Clvn_
830 Irvine Center Drive, Irvine, California 92618
T.949.916.3800
WWW.CVC-INC.NET
CEMLAB
November 20, 2024
City of Anaheim
Building Division
200 S Anaheim Boulevard
Anaheim, CA 92805
LABORATORY FINAL VERIFIED REPORT
Address: Tract 19170, Palm Court 1, Building 1-6
Permit Numbers: #BLD2023-04705, BLD2023-04704, BLD2023-04717, BLD2023-04707,
BLD2023-04720, BLD2023-04718
This is to certify that all the material testing and inspections performed by our laboratory.
(Compressive Strength Tests of concrete samples, Concrete Placement Inspections, Rebar Placement
Inspections, Shear -wall Inspections and Epoxy Inspections) during the course of construction of Single -
Family attached Condos at Tract 19170, Buildings 1-6, in the City of Anaheim confirms that the construction
of mentioned structures at this site were done in accordance with the approved City of Anaheim engineered
plans, and specifications.
This laboratory is certified by AMRL, CCRL, DSA, and the City of Los Angeles Material Control Section,
and meets the requirements of Section 4-335 and 4-335.1 of Part 1, Title 24, CCR of 2019 California Building
Code, ASTM E329, C 1077, and D3740 to conduct the tests and inspections program.
It is my professional opinion that all tests and inspections required by the City of Anaheim approved plans,
documents, and specifications were performed in accordance with the requirements of California Building
Code and ASTM Standards C39, C109, C144, C1142, C140, C476, C1019, and E447.
Report Reviewed By:
C 50028
EXp, 6/30/2027
Soheil Anthony Binaei, Principal Engineer, RCE50028
CCRL, AMRL / AASHTO, DSA Certified Laboratory
Structural
Mr. Terry Alford
City of Anaheim
Building Division
200 S Anaheim Boulevard
I" Floor, Suite 145
Anaheim, CA 92805
RE: KB Palm Court I
Building #2
Permit #: BLD2023-04720
Structural Observation
Dear Mr. Alford:
November 20, 2024
This letter is to confirm that VCA Structural has been engaged to provide Structural Observation for
above referenced building in accordance with 2019 CBC sections 1702 and 1704.6.
Per the previous correspondence, the site visits have been made at representative areas and all reported
deficiencies have been resolved to the best of our knowledge.
Please note that the site visits do not constitute an approval of the work nor do they relieve the
contractor in any way from complying with the project requirements.
Very truly yours,
VCA STRUCTURAL
1 �
Mark A VanGaale, P.E.
Principal
T: (7141 9M9780 1 F: (714) 978-9788 1 www.vcastructural.com 11845 W. Orangewood Ave., Ste. 200 1 Orange, CA
CONSULTING, INC.
CIVIL ENGINEERING
LAND PLANNING & SURVEYING
July 8, 2024
City of Anaheim
Building and Safety Division
200 S Anaheim Boulevard
Anaheim, CA 92805
Attention: City Grading Inspector
Subject: Civil Engineer's / Surveyor's Form Certification
Reference: Tract No. 19170 — Building # 2
Project: Grading Permit Number GRA 2022-03794
Job Address 1075 N. Harbor, Anaheim, Ca
Owner KB Home Coastal
Work Began August 2023 Work Completed July 2024
Please be advised the building foundation forms are in substantial conformance with the precise grading
plans as to horizontal and vertical location. The building setbacks were measured in relation to the
property lines and were found to be in substantial conformance with the approved precise grading plans
for this property.
Signature
Ryan J. Bittner
Date: 7/8/2024
R.C.E.# 68167
Company Name/ Address: C & V Consulting, Inc.
9830 Irvine Center Drive
Irvine, CA 92618
(949)916-3800
9830 Irvine Center Drive, Irvine, California 92618
T.949.916.3800
WWW.CVC-INC.NET
STRUCTURAL OBSERVATION REPORT FORM
STRUCTURAL OBSERVATION means the visual observation of the structural system, for general conformance to
the approved plans and specifications, at significant construction stages and at completion of the structural system.
Structural observation does not include or waive the responsibility for the inspections required by Section 108, 1701
or other sections of the code -
This report includes all construction work througt
Report No. _
9`" day of July 2024 Page No. of
PrtlIMt Addma )
Phone No nl 50A
1075-7085 N. Harbor Blvd. Anaheim CA 92801 Mark A. Vangaale
714-978-9780
Permiiw
struclurai Obsenratm Ped'11110 try
PhonP.No c�Ut,••ive.
BLDG2023-04720
VCA
C-58680
714-978-9780
OBSERVED STRUCTURAL ELEMENTS AND THEIR CONNECTIONS
FOUNDATION
WALL
FRAMES
FLOOR
El EMENTS/CONNECIION
OBSERVATION LOCATION
® Foofing, Stem Walls. Piers
❑Concrete ::Steel Moment Frame
❑Concrete
Phase 5, Building #2 (type
400), Lots 8-14, Foundation
❑ Mat Foundation
❑Masonry C'. Stool Braced Frame
::I steel Deck
hardware placement &
❑ Caisson, Piles, Grade Beams
❑Wood [-Concrete Moment
❑ Wood
associated rebars.
Frame
Stepp'glRetain'g Foundation,
L Others.
t- Masonry Wall Frame
L Others
Hillside Special Anchors
NOTED DEFICIENCIES with the proposed corresponding corrective actions with respect to general conformance
with the approved plans or In the bad path: (A final report by the structural observer which states that all observed
deficiencies have been resolvedis required before acceptance of the workby the building officials. )
No Observed Deficiencies
I DECLARE THAT THE FOLLOWING STATEMENTS ARE TRUE TO THE BEST OF MY KNOWLEDGE
1. IAM THE ENGINEER OR ARCHITECT RETAINED BY THE OWNER TO BE IN RESPONSIBLE
CHARGE FOR THE STRUCTURAL OBSERVATION IN ACCORDANCE WITH THE REQUIREMENTS
OF THE CITY OF RIVERSIDE,
2 L OR ANOTHER ENGINEER OR ARCHITECT WHO I HAVE DESIGNATED ABOVE AND IS
UNDER MY RESPONSIBLE CHARGE, HAS PERFORMED THE REQUIRED SITE VISITS AT
EACH SIGNIFICANT CONSTRUCTION STAGE TO VERIFY IFTHE STRUCTURE IS IN
GENERAL CONFORMANCE WITH APPROVED PLANS AND SPECIFICATIONS:
3 ALL NOTED DEFICIENCIES WHIC REMAIN TO BE CORRECTED HAVE BEEN NDICATED
ABOVE;
4, 1 RECOMMEND THAT ACC PT CE OF THE STRUCTURAL SYSTEMS BY THE CITY OF
Anaheim BENIWIT NT ALL OBSERVED DEFICIENCIES ARE CORRECTED.
/ 7/09/2024
SIGNATURE OF ST4UCTURAL 0E ERVER DATE
Per CBC 2019 Sec 1702 & W04.6
5-AMP Or STRU-Ti -PAL 055ErtvLn
GEOTECHNICAL
zx� OPTIMIZED SOIL ENGINEERING
Field Memorandum
Client/Project Name: KB Home/Palm Court I
Project Address: 1077, 1085 N Harbor Boulevard, Anaheim
Permit No.: BLD2023-04720
Subject: Observation of Footing Excavations and Slab Suberade for Building 2
Date: July 9, 2024
Project: 22025-02
Dennys Pointon of SA Geotechnical, Inc. (SA GEO) was onsite July 1, 2024, to observe and document the
footing excavations and slab subgrade for Building 2 at the subject site. The footing excavations exposed
undisturbed compacted artificial fill (silty sand) that was placed under the observation and testing of SA
GEO during recent site grading. The fill was found to be moist and medium dense.
The subject footing excavations and slab subgrade are considered geotechnically acceptable for placement
of steel and concrete. Any standing water, loose material and/or debris should be removed from the footing
excavation prior to placement of concrete.
Our services do not include verification of line and grade for the subject footings, which is the responsibility
of others.
Respectfully submitted,
SA GEOTECHNICAL, INC.
Anthony Zepeda, CEG 2681
Project Geologist
CEO No. 2MI
OF CAUF/O(x
15520 Rockfield Boulevard Suite E100 • Irvine, C'ahfomia 92618 • (949)-403-7229 • SAgeotechnicalxom
GOf'TOT S COIL ENC C�
Final Soil Certification/Release
September 18, 2024
Project No. 22025-02
Permit Nos.: BLD2023-04704
BLD2023-04705
BLD2023-04707
BLD2023-04717
BLD2023-04718
To: KB Home BLD2023-04720
9915 Mira Mesa Boulevard, Suite 100
San Diego, California 92131
Attention: Mr. Jesse Kleist
Subject: Geotechnical Certification of Building Pads 1 through 6, Palm Court 1, 1075 North Harbor
Boulevard, Tentative Tract Map 19170, City of Anaheim, California
In accordance with your request, SA Geotechnical, Inc. (SA GEO) has prepared this final grade soil letter
documenting our geotechnical certification and release for Building Pads 1 through 6 at the subject site.
SA GEO provided full time observation and testing during rough grading and post -grading/
construction including:
• Precise grading;
• Infrastructure improvement trench backfill;
• Storm drain/area drain trench backfill;
• Utility connections to the subject buildings;
• Retaining wall backfill;
• Subgrade preparation; and
• Asphalt concrete paving.
Rough grading of the building pads generally consisted of remedial removals of the upper 3 to 5 feet (to
remove undocumented fill and weathered/unsuitable alluvium), moisture -conditioning, and placement of
soil as compacted fill. Remedial removals extended at least 5 feet beyond the building pads. Additional
details and compaction test results are provided in the referenced report (SA GEO, 2023).
Based on our observation and testing, grading of the subject building pads and associated improvements at
the site has been completed in substantial compliance with our recommendations, the project requirements,
and the requirements of the City of Anaheim. At the completion of the overall project SA GEO will issue
a report providing compaction test results for the post-grading/construction items listed above.
I i520 Rock1wId 13oulcvat & Suitc F. 100. 1rFiuc (.-;dif mim W) l e • 104y1 10;.7-'29 • ';A,., o ,, lin :•.d.cnni
22025-02
September 18, 2024
If you have any questions regarding this letter, please contact our office.
Respectfully submitted,
SA GEOTECHNICAL, INC.
Reza Saberi, GE 3071
Principal Engineer
Distribution: (1) Addressee (E-mail)
(1) Juan Garcia, KB Home (E-mail)
Attachment: References
Anthony peda, CEG 2681
Project Geologist
INNo�