857 S PAGOSSA WAYPermit Types
BLD ELE MEC PLM CITY OF ANAHEIM
X aI IX
BUILDING DIVISION
Permit Number: BLD2024-05552 200 S. ANAHEIM BLVD.
Issued: 10/17/2024 (714) 765 - 5153 -
www.anaheim.net/building
(714)765-4626
Quarter Section: 226
Site Address: 857 S PAGOSSA WAY, ANAHEIM, CA 92808
Legal Description: N TR 14071 BLK LOT 4 UN 154 TRACT 14071, LOT 4 OF
APN: 93039518
Project Description: Residential Remodel: Replace shower with acrylic shower wall.
Living Area: Number of Stones: 0 Valuation: 0.00
Garage Area: Construction Types: NIA
Carport Area: Occupancy Groups:
Balcony I Deck Area: Fire Spnnklered.
Cool Roof: Total Fees paid for Permit: 225.00
People Associated with Project:
Contractor AMERICAN HOME REMODELING INC 4375 PRADO ROAD #108 CORONA, CA 92880
Owner GATBONTON, RUDOLFO 8 JULIE 857 S PAGOSSA WY
Type Electrical Fixtures Oty Type Plumbing Fixtures Oty Mechanical Fixtures Oty
Shower 1
The permit shall expire by limitation and become null and void If the building or work has not passed final inspection 365 days from the
date of permit issuance. A new permit is required to commence or continue work.
PNP,4EIM Oq`
Cityof Anaheim O4 iO
Building Division ' i
a
OVNDED tay^
Do not occupy this building until the final inspections have been made.
FINAL INSPECTIONS
DATF,
INSPECTOR
All applicable items below must be signed before utilities are released
Final Gas Test
Electrical Final
Plumbing Final
�Z m
7r,_{R7;
Mechanical Final
Cross Connection Control (714) 765-4280
Engineering Final (714) 765.6126
INSPECTION I
DATE I
INSPECTOR
Fire Sprinkler (ONLY) (714) 765-5041
Do not pour concrete until the following applicable items have been signed:
Fire Dept. Final (714) 765.5041
Plumbing (Ground/Underfloor Drain Waste)
Water Engineering (714) 765-4591
Electrical Ground ElectrodelUfer
Sub ListlBus. Lic. (714) 765-5194 (Allow 10 business days)
Setback/Forms/Trenches (Footings)
COAIMigation Measures
Do not install subfloor or pour floor slab until the follwing applicable items have been
sioned
Building Final (714 765.5153)
Last Inspection -Final Only After Above Completed
Plumbing (Ground/Underfloor Water)
Underfloor Rough Gas
PARTIAL INSPECTIONS
Building Inspections
Mechanical (Groundwork)
Electrical (Underground Conduit)
Pre -slab (Compaction/Membrane Reinf.)
Floor (Joist/Girders)
Underfloor Insulation (Raised Foundation Only)
Floor Nailing (Raised Foundation Only)
2nd Floor (Floor Nailing)
Do not cover or conceal the work below until the following applicable items have
been sianed
1st Floor Shear
Firesprinkler (Rough) (Fire Dept.)
Mechanical Inspections
2nd Floor Shear
Roof (SheathinglDiaphragmlFrame)
Masonry (Reinf.lBond Beam/Pre-Grout)
Rough Plumbing (Top Out)
Rough Duct (Mechanical)
Rough Mechanical
Rough Electrical
Rough COAIMitagation Measures
Plumbing Inspections
Framing (Only after Plbg., Ele., Mec. & Fire)
Insulation (Sound/Energy)
Do not tape or plaster until the following applicable items have been signed
Drywall
Drywall Penetrations (Ele, Mec & Plbg)
Interior lath
Exterior Lath
Electrical Inspections
Electrical Service Meter -(Meter will be set within 2-3
business days after approval) Excludes New
Construction
Exterior Plaster (Brown Coat)
T-Bar (Struct., Ele., or Mec.)
Grease Interceptor
(Do not backfill unless sinned off)
Sewer
Water Engineering Backflow (Testable Only)
Water Service