426 W ALBERTA ST (5)PIN _WW"'aaa
Permit Types
BLD ELE MEC PLM
X
Permit Number: BLD2024.00258
Issued: 01/16/2024
www.anaheim.net/building
(714)765-4626
Quarter Section: 72
CITY OF ANAHEIM
BUILDING DIVISION
200 S. ANAHEIM BLVD.
(714) 765. 5153
Site Address: 426 W ALBERTA ST, ANAHEIM, CA 92805
Legal Description: N TR 1097 BLK LOT 14
APN: 03426119
Project Description: Reroof: Remove existing to install (37) sq composition shingles over entire house and attached garage
Living Area:
Number of Stories:
1 Valuation: 23,500.00
Garage Area:
Construction Types: v8
Carport Area:
Occupancy Groups:
Balcony I Deck Area
Fire Spnnklered:
Cool Roof:
Total Fees paid for Perri 375.06
People Associated with
Project:
Contractor
ALL SERVICE ROOFING
11602 ANABEL AVE202011251212524980 GARDEN GROVE, CA 92708
Permit Applicant
frank Vazquez
Owner
TRAN, PHU LONG
426 W ALBERTA ST
Type Electrical Fixtures Oty Type Plumbing Fixtures Oty Mechanical Fixtures Oty
The permit shall expire by limitation and become null and void If the building or work has not passed final inspection 365 days from the
dale of permit issuance. A new permit is required to commence or continue work.
Pip 4EIM Cd`
Cityof Anaheim o4 �o
Building Division 2
OVArDEV
Do not occupy this building until the final inspections have been made.
FINAL INSPECTIONS
DATE
INSPECTOR
All applicable items below must be signed before utilities are released
Final Gas Test
Electrical Final
Plumbing Final
Mechanical Final
Cross Connection Control (714) 765-4280
Engineering Final (714) 765-5126
INSPECTION I
DATE I
INSPECTOR
Fire Sprinkler (ONLY) (714) 765-6041
Do not pour concrete until the following applicable items have been signed:
Fire Dept. Final (714) 765-5041
Plumbing (Ground/Underfloor Drain Waste)
Water Engineering (714) 765-4591
Electrical Ground Electrode/Ufer
Sub List/Bus. Lic. (714) 765-5194 (Allow 10 business days)
Setback/Forms/Trenches (Footings)
COA/Migation Measures
Lo not install subfloor or pour Floor slab until the follwing applicable items have been
sioned.
Building Final (714 765-5153)
Last Inspection -Final Only After Above Completed
,` i
Plumbing (Ground/Underfloor Water)
Underfloor Rough Gas
PARTIAL INSPECTIONS
Building Inspections
Mechanical (Groundwork)
Electrical (Underground Conduit)
Pre -slab (Compaction/Membrane Reinf.)
Floor (Joist/Girders)
Underfloor Insulation (Raised Foundation Only)
Floor Nailing (Raised Foundation Only)
2nd Floor (Floor Nailing)
Do not cover or conceal the work below until the following applicable items have
been sioned
1st Floor Shear
Firesprinkler (Rough) (Fire Dept.)
Mechanical Inspections
2nd Floor Shear
Roof (Sheathing/Diaphragm/Frame)
if
Masonry (Reinf./Bond BeamlPre-Grout)
Rough Plumbing (Top Out)
Rough Duct (Mechanical)
Rough Mechanical
Rough Electrical
Rough COA/Mitagation Measures
Plumbing Inspections
Framing (Only after Plbg_ Fie, Mec. & Fire)
Insulation (Sound/Energy)
Do not tape or plaster until the following applicable items have been signed
Drywall
Drywall Penetrations (Ele, Mac & Plbg)
Interior Lath
Exterior Lath
Electrical Inspections
Electrical Service Meter -(Meter will be set within 2-3
business days after approval) Excludes New
Exterior Plaster (Brown Coat)
T-Bar (Struct., Ele., or Mec.)
Grease Interceptor
Sewer
Water Engineering Backflow (Testable Only)
Water Service