715 S CROWN POINTE DR (2)Permit Types
BLD
ELE
MEC
1 PLM
x
x
x
x
Permit Number: BLD2023.06829
Issued: 01/17/2024
www.anaheim.net/bu ilding
(714)765-4626
Quarter Section: 187
CITY OF ANAHEIM
BUILDING DIVISION
200 S. ANAHEIM BLVD.
(714) 765 - 5153
Site Address: 715 S CROWN POINTE DR, ANAHEIM, CA 92807
Legal Description: N TR 12658 BLK LOT 1 UN 6 TR 12658 LOT 1 UNIT 6 OF
APN: 93844064
Project Description: Residential Remodel: infill walkway between dining and kitchen and remove dropped soffit and remodel kitchen with
updated fixtures.
Living Area: Number of Stories: 1 Valuation:
Garage Area: Construction Types:
Carport Area: Occupancy Groups:
Balcony I Deck Area: Fire Sprinklered:
Cool Reef: Total Fees paid for Permit:
People Associated with Project:
Contractor SEA POINTE CONSTRUCTION AND DEVELOPM 576 WALD STREET200205061336325990 IRVINE, CA 92618
Owner MAGINNES, CRYSTAL MARIE & PAUL JAMES 715 S CROWN POINT DR 1-6
58,000.00
VB
1,017.54
Type Electrical Fixtures Qty Type Plumbing Fixtures Oty Mechanical Fixtures 04
Receptacle, switches, lights 16 Dishwasher 1 Ventilation Fan - <= 300 cfm on single duct 1
Garbage Disposal
Kitchen Sink
The permit shall expire by limitation and become null and void if the building or work has not passed final inspection 365 days from the
date of permit issuance. A new permit is required to commence or continue work.
PapHEIM ��`
Cityof Anaheim D4 i0
Building Division F i
�ovNDED tah^
Do not occupy this building until the final inspections have been made.
FINAL INSPECTIONS
DATE
INSPECTOR
All applicable items below must be signed before utilities are released
Final Gas Test
Electrical Final
7 LS
Plumbing Final
1/777
TO
Mechanical Final
117
-
Cross Connection Control (714) 765-4280
Engineering Final (714) 765-5126
INSPECTION I
DATE I
INSPECTOR
Fire Sprinkler (ONLY) (714) 765-5041
Do not pour concrete until the following applicable items have been signed:
Fire Dept. Final (714) 765-6041
Plumbing (Ground/Underfloor Drain Waste)
Water Engineering (714) 765-4591
Electrical Ground Electrode/Ufer
Sub List/Bus. Lic. (714) 765-5194 (Allow 10 business days)
Setback/Forms/Trenches (Footings)
COA/Migation Measures
Do not install subfloor or pour Floor slab until the follwing applicable items have beensioned
Building Final (714 765-5153)
Last Inspection -Final Only After Above Completed
1)/74
1 "mil
Plumbing (Ground/Underfloor Water)
Underfloor Rough Gas
PARTIAL INSPECTIONS
Building Inspections
Mechanical (Groundwork)
Electrical (Underground Conduit)
Pre -slab (Compaction/Membrane Reinf.)
Floor (Joist/Girders)
Underfloor Insulation (Raised Foundation Only)
Floor Nailing (Raised Foundation Only)
2nd Floor (Floor Nailing)
Do not cover or conceal the work below until the following applicable items have
been sioned
list Floor Shear
Firesprinkler (Rough) (Fire Dept.)
Mechanical Inspections
2nd Floor Shear
Roof (Sheathing/Diaphragm/Frame)
Masonry (Reinf./Bond Beam/Pre-Grout)
Rough Plumbing (Top Out)
I�
Rough Duct (Mechanical)
Rough Mechanical
j/vl yr{
,\
Rough Electrical
Rough COA/Mitagation Measures
Plumbing Inspections
Framing (Only after P%g_ Ele_ Mec. & Fire)
k/74711
Insulation (Sound/Energy)
Do not tape or plaster until the following applicable items have been signed:
Drywall
7/1 yM
Drywall Penetrations (Ele, Mec 8. Plbg)
Interior Lath
Exterior Lath
Electrical Inspections
Electrical Service Meter -(Meter will be set within 2-3
business days after approval) Excludes New
Exterior Plaster (Brown Coat)
T-Bar (Struct., Ele., or Mec.)
Grease Interceptor
,Dr, not rackf,fl,mlP,;qqrrmPd off)
Sewer
Water Engineering Backflow (Testable Only)
Water Service