Loading...
715 S CROWN POINTE DR (2)Permit Types BLD ELE MEC 1 PLM x x x x Permit Number: BLD2023.06829 Issued: 01/17/2024 www.anaheim.net/bu ilding (714)765-4626 Quarter Section: 187 CITY OF ANAHEIM BUILDING DIVISION 200 S. ANAHEIM BLVD. (714) 765 - 5153 Site Address: 715 S CROWN POINTE DR, ANAHEIM, CA 92807 Legal Description: N TR 12658 BLK LOT 1 UN 6 TR 12658 LOT 1 UNIT 6 OF APN: 93844064 Project Description: Residential Remodel: infill walkway between dining and kitchen and remove dropped soffit and remodel kitchen with updated fixtures. Living Area: Number of Stories: 1 Valuation: Garage Area: Construction Types: Carport Area: Occupancy Groups: Balcony I Deck Area: Fire Sprinklered: Cool Reef: Total Fees paid for Permit: People Associated with Project: Contractor SEA POINTE CONSTRUCTION AND DEVELOPM 576 WALD STREET200205061336325990 IRVINE, CA 92618 Owner MAGINNES, CRYSTAL MARIE & PAUL JAMES 715 S CROWN POINT DR 1-6 58,000.00 VB 1,017.54 Type Electrical Fixtures Qty Type Plumbing Fixtures Oty Mechanical Fixtures 04 Receptacle, switches, lights 16 Dishwasher 1 Ventilation Fan - <= 300 cfm on single duct 1 Garbage Disposal Kitchen Sink The permit shall expire by limitation and become null and void if the building or work has not passed final inspection 365 days from the date of permit issuance. A new permit is required to commence or continue work. PapHEIM ��` Cityof Anaheim D4 i0 Building Division F i �ovNDED tah^ Do not occupy this building until the final inspections have been made. FINAL INSPECTIONS DATE INSPECTOR All applicable items below must be signed before utilities are released Final Gas Test Electrical Final 7 LS Plumbing Final 1/777 TO Mechanical Final 117 - Cross Connection Control (714) 765-4280 Engineering Final (714) 765-5126 INSPECTION I DATE I INSPECTOR Fire Sprinkler (ONLY) (714) 765-5041 Do not pour concrete until the following applicable items have been signed: Fire Dept. Final (714) 765-6041 Plumbing (Ground/Underfloor Drain Waste) Water Engineering (714) 765-4591 Electrical Ground Electrode/Ufer Sub List/Bus. Lic. (714) 765-5194 (Allow 10 business days) Setback/Forms/Trenches (Footings) COA/Migation Measures Do not install subfloor or pour Floor slab until the follwing applicable items have beensioned Building Final (714 765-5153) Last Inspection -Final Only After Above Completed 1)/74 1 "mil Plumbing (Ground/Underfloor Water) Underfloor Rough Gas PARTIAL INSPECTIONS Building Inspections Mechanical (Groundwork) Electrical (Underground Conduit) Pre -slab (Compaction/Membrane Reinf.) Floor (Joist/Girders) Underfloor Insulation (Raised Foundation Only) Floor Nailing (Raised Foundation Only) 2nd Floor (Floor Nailing) Do not cover or conceal the work below until the following applicable items have been sioned list Floor Shear Firesprinkler (Rough) (Fire Dept.) Mechanical Inspections 2nd Floor Shear Roof (Sheathing/Diaphragm/Frame) Masonry (Reinf./Bond Beam/Pre-Grout) Rough Plumbing (Top Out) I� Rough Duct (Mechanical) Rough Mechanical j/vl yr{ ,\ Rough Electrical Rough COA/Mitagation Measures Plumbing Inspections Framing (Only after P%g_ Ele_ Mec. & Fire) k/74711 Insulation (Sound/Energy) Do not tape or plaster until the following applicable items have been signed: Drywall 7/1 yM Drywall Penetrations (Ele, Mec 8. Plbg) Interior Lath Exterior Lath Electrical Inspections Electrical Service Meter -(Meter will be set within 2-3 business days after approval) Excludes New Exterior Plaster (Brown Coat) T-Bar (Struct., Ele., or Mec.) Grease Interceptor ,Dr, not rackf,fl,mlP,;qqrrmPd off) Sewer Water Engineering Backflow (Testable Only) Water Service