710 E KATELLA AVE (2)Permit Types
BLD ELE MEC PLM
Permit Number: BLD2023-00658
Issued: 11/07/2023
www.anaheim.net/building
(714)765-4626
Quarter Section: 98
Site Address: 710 E KATELLA AVE, ANAHEIM, CA 92805
CITY OF ANAHEIM
BUILDING DIVISION
200 S. ANAHEIM BLVD.
(714) 765-5153
Legal Description: S TWP 4 RGE 10 SEC 26 SEC 26 T 4 R 10 POR NW1/4
APN: 08325045
Project Description: Demolition: 11,347 sq ft two story building with utilities to be capped and foundation to remain.
Living Area:
Garage Area:
Carport Area:
Balcony/Deck Area:
Cool Roof:
People Associated with Project:
Contractor
Permit Applicant
Owner
ESPLANADE BUILDERS INC
Matt Quane
Number of Stories:
CREF3 KATELLA OWNER LLC
2 Valuation:
Construction Types:
Occupancy Groups:
Fire Sprinklered:
Total Fees paid for Permit:
OF ANAHEIM CALIFOR
FOUNDED 1857
24430 HAWTHORNE BLVD SUITE 100201512151518505877 TORRANCE, CA 90505
5221 N OCONNOR BLVD 700
Type Electrical Fixtures
35,000.00
IV
1.371.41
Qty Typе Plumbing Fixtures Qty Mechanical Fixtures Qty
The permit shall expire by limitation and become null and void if the building or work has not passed final inspection 365 days from the
date of permit issuance. A new permit is required to commence or continue work.
City of Anaheim
Building Division CALIFORANAHEIM C
OF
FINAL INSPECTIONS DATE INSPECTOR
All applicable items below must be signed before utilities are released
Final Gas Test
FOUNDED 1857
Do not occupy this building until the final inspections have been made.
INSPECTION DATE INSPECTOR
Do not pour concrete until the following applicable items have been signed:
Plumbing (Ground/Underfloor Drain Waste)
Electrical Ground Electrode/Ufer
Setback/Forms/Trenches (Footings)
Do not install subfloor or pour floor slab until the follwing applicable items have
signed
Plumbing (Ground/Underfloor Water)
Underfloor Rough Gas
Mechanical (Groundwork)
Electrical (Underground Conduit)
Pre-slab (Compaction/Membrane Reinf.)
Floor (Joist/Girders)
Underfloor Insulation (Raised Foundation Only)
Floor Nailing (Raised Foundation Only)
2nd Floor (Floor Nailing)
been
Do not cover or conceal the work below until the following applicable items have
been sianed:
1st Floor Shear
Firesprinkler (Rough) (Fire Dept.)
2nd Floor Shear
Roof (Sheathing/Diaphragm/Frame)
Masonry (Reinf./Bond Beam/Pre-Grout)
Rough Plumbing (Top Out)
Rough Duct (Mechanical)
Rough Mechanical
Rough Electrical
Rough COA/Mitagation Measures
Framing (Only after Plbg., Ele., Mec. & Fire)
Insulation (Sound/Energy)
Do not tape or plaster until the following applicable items have been signed:
Drywall
Drywall Penetrations (Ele, Mec & Plbg)
Interior Lath
Exterior Lath
Electrical Service Meter-(Meter will be set within 2-3
business days after approval) Excludes New
Electrical Final
Plumbing Final
Mechanical Final
Cross Connection Control (714) 765-4280
Engineering Final (714) 765-5126
Fire Sprinkler (ONLY) (714) 765-5041
Fire Dept. Final (714) 765-5041
Water Engineering (714) 765-4591
Sub List/Bus. Lic. (714) 765-5194 (Allow 10 business days)
COA/Migation Measures
Building Final (714 765-5153)
Last Inspection-Final Only After Above Completed
PARTIAL INSPECTIONS
Building Inspections
Mechanical Inspections
Plumbing Inspections
Electrical Inspections
Construction
Exterior Plaster (Brown Coat)
T-Bar (Struct., Ele., or Mec.)
Grease Interceptor
(Do not backfill unless signed off
Sewer
Water Engineering Backflow (Testable Only)
Water Service