125 W SOUTH ST 201-209 (2)Permit Types
BLD ELE MEC PLM
X
Permit Number: BLD2024-03721
Issued: 07/19/2024
www.anaheim.net/building
(714)765-4626
Quarter Section: 84
CITY OF ANAHEIM
Site Address: 125 W SOUTH ST 201-209, Anaheim, CA 92805
Legal Description: N TR 11256 BLK LOT 1 UN HOLD
APN: 25109208
BUILDING DIVISION
200 S. ANAHEIM BLVD.
(714) 765 -5153
Project Description: Reroof: Remove and install (40) squares of TPO over building UNITS 201-209
a
1ei�as? ,
Living Area: Number of Stones:
0 Valuation: 36,475.00
Garage Area:
Construction Types: NA
CarportArea:
Occupancy Groups:
Balcony / Deck Area:
Fire Spnnkiered.
Cool Roof:
Total Fees paid for Permit; 363.21
People Associated with Project:
Contractor ROOFING STANDARDS INC
930 LAWRENCE STABCDE11155192 PLACENTIA, CA 92870
Permit Applicant Isaac Santana
Owner HOLD PARCEL
Type Electrical Fixtures City Type Plumbing Fixtures Qty Mechanical Fixtures
The permit shall expire by limitation and become null and void if the building or work has not passed final inspection 365 days from the
date of permit issuance. A new permit is required to commence or continue work.
PNft1 El M C�<
Cityof Anaheim O4 iO
Building Division F z
u >
"o DED te`'^�
Do not occupy this building until the final inspections have been made.
FINAL INSPECTIONS
DATE
INSPECTOR
All applicable items below must be signed before utilities are released
Final Gas Test
Electrical Final
Plumbing Final
Mechanical Final
Cross Connection Control (714) 765-4280
Engineering Final (714) 765-5126
INSPECTION
I DATE
I INSPECTOR
Fire Sprinkler (ONLY) (714) 765-5041
Do not pour concrete until the following applicable items have been sianed
Fire Dept. Final (714) 765-5041
Plumbing (Ground/Underfloor Drain Waste)
Water Engineering (714) 765-4591
Electrical Ground Electrode/Ufer
Sub List/Bus. Lic. (714) 765-5194 (Allow 10 business days)
Setback/Forms/Trenches (Footings)
COA/Migation Measures
Do not install subfloor or pour floor slab until the follwing applicable items have been
si ne :
Building Final (714 765-5153)
Last Inspection -Final Only After Above Completed
Plumbing(Ground/Underfloor Water)
Underfloor Rough Gas
PARTIAL INSPECTIONS
Building Inspections
Mechanical (Groundwork)
Electrical (Underground Conduit)
Pre -slab (CompactionlMembrane Reinf.)
Floor (Joist/Girders)
Underfloor Insulation (Raised Foundation Only)
Floor Nailing (Raised Foundation Only)
2nd Floor (Floor Nailing)
Do not cover or conceal the work below until the following applicable items have
been sianed
1st Floor Shear
Firesprinkler (Rough) (Fire Dept.)
Mechanical Inspections
2nd Floor Shear
Roof(Sheathing/Diaphragm/Frame)
Masonry (Reinf./Bond BeamlPre-Grout)
Rough Plumbing (Top Out)
Rough Duct (Mechanical)
Rough Mechanical
Rough Electrical
Rough COA/Mitagation Measures
Plumbing Inspections
Framing (Only after Plbg.. Ele.. Meg & Fire)
Insulation (Sound/Energy)
Do not tape or plaster until the fallowing applicable items have been signed'.
Drywall
Drywall Penetrations (Ele, Mac & Plbg)
Interior Lath
Exterior Lath
Electrical Inspections
Electrical Service Meter -(Meter will be set within 2-3
business days after approval) Excludes New
Construction
Exterior Plaster (Brown Coat)
T-Bar (Struct., Ele., or Mec.)
Grease Interceptor
` Do not backf,Jl unless sioned off)
Sewer
Water Engineering Backflow (Testable Only)
Water Service