903 S CREEKVIEW LN (7)Permit Types
BLD EL_
MEC PLM
X
Permit Number: BLD2022-02607
Issued: 08/02/2022
www.anaheim.net/building
(714)765-4626
Quarter Section: 209
CITY OF ANAHEIM
BUILDING DIVISION
200 S. ANAHEIM BLVD.
(714) 765 - 5153
Site Address: 903 S CREEKVIEW LN, ANAHEIM, CA 92808
Legal Description: N TR 12687 BLK LOT 48
APN: 35654233
Project Description: Residential Remodel: Replace existing sliding door and window with new folding door.
Living Area: Number of Stones:
2 Valuation: 5,00000
Ganage Area:
Construction Types: VB
Carport Area:
Occupancy Gmups:
Balcony I Deck Area:
Fire Spdnklered:
Cod Roof:
Total Fees paid for Permit: 597,65
People Associated with Project:
Contractor HOME MASTER INTERNATIONAL
2232 VINEYARD AVENUE201910161236112670 ONTARIO, CA 91761
Permit Applicant Amir Ghabrous
Owner MONTENEGRO DEBORA J TR D
903 S CREEKVIEW LN
Type Electrical Fixtures Oty Type Plumbing Fixtures Qty Mechanical Fixtures Cry
The permit shall expire by limitation and become null and void it the building or work has not passed final Inspection 365 days from the
date of permit Issuance. A new permit Is required to commence or continue work
��PHEIM C�`
City of Anaheim D4 iO
Building Division 2
U >
�ovNDED tmh^
Do not occupy this building until the final inspections have been made.
FINAL INSPECTIONS
DATE
INSPECTOR
All applicable items below must be 6t"
e
Final Gas Test
`
Electrical Final
Plumbing Final
Mechanical Final
r
Cross Connection Control (714) V_:
Engineering Final (714) 765-5126
INSPECTION
I DATE
I INSPECTOR
Fire Sprinkler (ONLY) (714) 765-5041
Do not pour concrete until the following applicablehems have been signed.
Fire Dept. Final (714) 765-5041
Plumbing (Ground/Underfloor Drain Waste)
Water Engineering (714) 765-4591
Electrical Ground Electrode/Ufer
Sub List/Bus. Lic. (714) 765-5194 (Allow 10 business days)
Setback/Forms/Trenches (Footings)
COA/Migation Measures
Do not install subfloor or pour floor slab until the follwing applicable items have been
Building Final (714 765.51153)
Last Inspection -Final Only After Above Completed
Plumbing (Ground/Underfloor Water)
Underfloor Rough Gas
PARTIAL INSPECTIONS
Building Inspections
Mechanical (Groundwork)
Electrical (Underground Conduit)
Pre -slab (Compaction/Membrane Reinf.)
Floor (Joist/Girders)
Underfloor Insulation (Raised Foundation Only)
Floor Nailing (Raised Foundation Only)
2nd Floor (Floor Nailing)
Do not cover or conceal the work below until the following applicable items have
1st Floor Shear
Firesprinkler (Rough) (Fire Dept.)
Mechanical Inspections
2nd Floor Shear
Roof (Sheathing/Diaphragm/Frame)
Masonry (Reinf./Bond Beam/Pre-Grout)
Rough Plumbing (Top Out)
Rough Duct (Mechanical)
Rough Mechanical
Rough Electrical
Rough COA/Mitagation Measures
Plumbing Inspections
Framing (Only after Plbg., Ele., Mec. & Fire)
Insulation (Sound/Energy)
Do not tape or plaster until the following applicable items have been signed.
Drywall
Drywall Penetrations (Ele, Mec & Plbg)
Interior Lath
Exterior Lath
Electrical Inspections
Electrical Service Meter -(Meter will be set within 2-3
business days after approval) Excludes New
Exterior Plaster (Brown Coat)
T-Bar (Struct., Ele., or Mec.)
Grease Interceptor
Sewer
Water Engineering Backflow (Testable Only)
Water Service