840 S KENMORE STPermit Types
BLD ELE MEC PLM
X
Permit Number: BLD2024-05774
Issued: 10/30/2024
www.anaheim.net/building
(714)765-4626
Quarter Section: 21
CITY OF ANAHEIM
BUILDING DIVISION
200 S. ANAHEIM BLVD.
17141 765 - 5163
91
Site Address: 840 S KENMORE ST, ANAHEIM, CA 92804
Legal Description: N TR 1951 BLK LOT 151
APN: 12621527
Project Description: Reroof: Remove and install (25) squares of composition shingles over house and attached garage
Living Area: Number of Stones:
0 valuation: 9,000.00
Garage Area:
Construction Types: N/A
Carport Area:
Occupancy Groups:
Balcony / Deck Area:
Fire Spnnklered:
Cool Roof:
Total Fees paid for Permit: 360.17
People Associated with Project:
Contractor BUMBLE ROOFING OF LA LLC
6800 OWENSMOUTH AVENUE,SUITE 410 CANOGA PARK, CA
Permit Applicant JOHN COLINDRES
Owner CASTRO, JOSE LUIS& NORMA
840 S KENMORE ST
Type Electrical Fixtures Qty Type Plumbing Fixtures Oty Mechanical Fixtures
The permit shall expire by limitation and become null and void if the building or work has not passed final inspection 365 days from the
date of permit issuance. A new permit is required to commence or continue work.
P�PHEIM �dc
City of Anaheim OF 10
' Building Division F z
U >
�OONDED tsry^
Do not occupy this building until the final inspections have been made.
FINAL INSPECTIONS DATE
INSPECTOR
All applicable items below must be signed before utilities are released
Final Gas Test
Electrical Final
Plumbing Final
Mechanical Final
Cross Connection Control (714) 765.4280
Engineering Final (714) 765-5126
INSPECTION I
DATE I
INSPECTOR
Fire Sprinkler (ONLY) (714) 765-5041
Do not pour concrete until the following applicable items have been signed:
Fire Dept. Final (714) 765-5041
Plumbing (Ground/Underfloor Drain Waste)
Water Engineering (714) 765-4591
Electrical Ground Electrode/Ufer
Sub Llst/Bus. Lic. (714) 765.5194 (Allow 10 business days)
Setback/Forms/Trenches (Footings)
COA/Migation Measures
Do not install subiloor or pour Floor slab until the follwing applicable items have been
Building Final (714765.5153)
Last Inspection -Final Only After Above Completed
Plumbing (Ground/Underfloor Water)
Underfloor Rough Gas
PARTIAL INSPECTIONS
Building Inspections
Mechanical (Groundwork)
Electrical (Underground Conduit)
Pre -slab (Compaction/Membrane Reinf.)
Floor (Joist/Girders)
Underfloor Insulation (Raised Foundation Only)
Floor Nailing (Raised Foundation Only)
2nd Floor (Floor Nailing)
Do not cover or conceal the work below until the following applicable items have
been sioned.
1st Floor Shear
Firesprinkler (Rough) (Fire Dept.)
Mechanical Inspections
2nd Floor Shear
Roof(Sheathing/Diaphragm/Frame)
IUl31t'�
Masonry (Reinf./Bond Beam/Pre-Grout)
Rough Plumbing (Top Out)
Rough Duct (Mechanical)
Rough Mechanical
Rough Electrical
Rough COA/Mitagation Measures
Plumbing Inspections
Framing (Only after Plbg., Ele., Mac. 8 Fire)
Insulation (Sound/Energy)
Do not tape or plaster until the following applicable items have been signed.
Drywall
Drywall Penetrations (Ele, Mec & Plbg)
Interior Lath
Exterior Lath
Electrical Inspections
Electrical Service Meter -(Meter will be set within 2-3
business days after approval) Excludes New
Exterior Plaster (Brown Coat)
T-Bar (Struct., Ele., or Mec.)
Grease Interceptor
(Do not backfill unless stoned off)
Sewer
Water Engineering Backflow (Testable Only)
Water Service