Loading...
824 S DUNE ST (12)Permit Types BLD ELE MEG PLM CITY OF ANAHEIM X AGO BUILDING DIVISION Permit Number: BLD2024.03576 200 S. ANAHEIM BLVD. Issued: 07/15/2024 (7141765 - 5153 www.anaheim.net/building (714)765-4626 Quarter Section: 124 Site Address: 824 S DUNE ST, Anaheim, CA 92806 Legal Description: N TR 4057 BLK LOT 1 APN: 25332501 Project Description: Patio Cover: 288 sq ft covered porch Living Area: Number of Stories: 1 Valuation 12,500.00 Garage Area: Construction Types: N/A Carport Area: Ocmpancy Groups: Balcony / Deck Area: Fire Spnnklered: No Cool Roof: Total Fees paid for permit: 551,63 People Associated with Project: Permit Applicant Jose Morales Owner MORALES, JOSE & ELIDETH AVELINA 824 S DUNE ST Type Electrical Fixtures Oty Type Plumbing Fixtures Oty Mechanical Fixtures Oty The permit shalt expire by limitation and become null and void if the building or work has not passed final inspection 365 days from the date of permit issuance. A new permit Is required to commence or continue work. PNpN EIM1t t-'` Cityof Anaheim OF io Building DIVISIOn 2 ' OVNpED veh^ Do not occupy this building until the final inspections have been made. FINAL INSPECTIONS DATE INSPECTOR All applicable items below must be signed before utilities are released Final Gas Test Electrical Final Plumbing Final Mechanical Final Cross Connection Control (714) 765-4280 Engineering Final (714) 765-5126 INSPECTION I DATE INSPECTOR Fire Sprinkler (ONLY) (714) 765-5041 Do not pour concrete until the following applicable items have been signed: Fire Dept. Final (714) 765-5041 Plumbing (Ground/Underfloor Drain Waste) Water Engineering (714) 765-4591 Electrical Ground Electrode Sub LisVBus. Lic. (714) 765-5194 (Allow 10 business days) SetbacklFormslTrenche ootings) IZ21T9 COAIMigation Measures p Do not install subfloor or po floor slab ntil the follwing a1icable items ha been ned Building Final (714 765-6153) Last Inspection -Final Only After Above Completed \/Ly f11 Plumbing(GroundlUndernoor Water) Underfloor Rough Gas PARTIAL INSPECTIONS Building Inspections Mechanical (Groundwork) Electrical (Underground Conduit) Pre -slab (Compaction/Membrane Feint.) Floor (Joist/Girders) Underfloor Insulation (Raised Foundation Only) Floor Nailing (Raised Foundation Only) 2nd Floor (Floor Nailing) Do not cover or conceal the work below until the following applicable items have 1st Floor Shear Firesprinkler (Rough) (Fire Dept.) Mechanical Inspections 2nd Floor Shear Roof (Sheathing/Diaphragm/Frame) Iy Masonry (Reinf.IBond Beam/Pre-Grout) Rough Plumbing (Top Out) Rough Duct (Mechanical) Rough Mechanical Rough Electrical Rough COAIMitagation Measures Plumbing Inspections Framing (Only after Plbg., Ele., Meg & Fire) Insulation (SoundlEnergy) Do not tape or plaster until the following applicable items have been signed, Drywall Drywall Penetrations (Ele, Mec & Plbg) Interior Lath Exterior Lath Electrical Inspections Electrical Service Meter -(Meter will be set within 2-3 business days after approval) Excludes New Exterior Plaster (Brown Coat) T-Bar (Struct., Ele., or Mec.) Grease Interceptor Sewer Water Engineering Backflow (Testable Only) Water Service