Loading...
951 S JAY CIR (2)r Permit Types BLD 1 EL E MEC PLM X' Permit Number: BLD2024-06048 Issued: 11115/2024 www.a nahei m. net/bu ilding (714)765-0626 Quarter Section: 216 Site Address: 951 S JAY CIR, ANAHEIM, CA 92808 Legal Description: N TR 9466 BLK LOT 57 APN: 35638127 CITY OF ANAHEIM BUILDING DIVISION 200 S. ANAHEIM BLVD. (714) 765 - 5153 Project Description: Reroof: Remove existing material to install (25) squares of tile roofing over house and attached garage Living Area: Number of Stones: 1 valuation: Garage Area: Construction Types: Carport Area: Occupancy Groups: Balcony I Deck Area: Fire Sprinklered: Cool Root: Total Fees paid for Permit: 35,000.00 NIA No 626.55 People Associated with Project: Contractor HOYT ROOFS INC 1809 N ORANGETHORPE PARKABCDE11140254 ANAHEIM, CA 92801 Permit Applicant Fernando Toredo Owner TELLINGHUISEN, RICHARD DEAN TR 951 S JAY CIR Type Electrical Fixtures City Type Plumbing Fixtures Oty Mechanical Fixtures City The permit shall expire by limitation and become null and void if the building or work has not passed final inspection 365 days from the date of permit issuance. A new permit is required to commence or continue work. P�rhlEtAt �q< Cityof Anaheim OQ iO Building Division _� i u > OLNDED taF^ Do not occupy this building until the final inspections have been made. FINAL INSPECTIONS DATE INSPECTOR All applicable items below must be signed before utilities are released Final Gas Test Electrical Final Plumbing Final Mechanical Final Cross Connection Control (714) 765-4280 Engineering Final (714) 765-5126 INSPECTION I DATE I INSPECTOR Fire Sprinkler (ONLY) (714) 765-5041 Do not pour concrete until the following applicable items have been signed: Fire Dept. Final (714) 765-5041 Plumbing (GroundlUnderfloor Drain Waste) Water Engineering (714) 765-4591 Electrical Ground ElectrodelUfer Sub List/Bus. Lic. (714) 765-5194 (Allow 10 business days) Setback/Forms/Trenches (Footings) COA/Migation Measures Do not install subfloor or pour floor slab until the follwing applicable items have been sianed Building Final (714 765-5163) Last Inspection -Final Only After Above Completed N �v Plumbing (Ground/Underfloor Water) Underfloor Rough Gas PARTIAL INSPECTIONS Building Inspections Mechanical (Groundwork) Electrical (Underground Conduit) Pre -slab (Compaction/Membrane Reinf.) Floor (JoistlGirders) Underfloor Insulation (Raised Foundation Only) Floor Nailing (Raised Foundation Only) 2nd Floor (Floor Nailing) Do not cover or conceal the work below until the following applicable items have been sioned: 1st Floor Shear Firesprinkler (Rough) (Fire Dept.) Mechanical Inspections 2nd Floor Shear Roof (Sheathing/Diaphragm/Frame) Masonry (Reinf./Bond Beam/Pre-Grout) Rough Plumbing (Top Out) Rough Duct (Mechanical) Rough Mechanical Rough Electrical Rough COA/Mitagation Measures Plumbing Inspections Framing (Only after Plbg., Ele.. Mec. & Fire) Insulation (Sound/Energy) Do not tape or plaster until the following applicable items have been signed: Drywall Drywall Penetrations (Ele, Mec & Plbg) Interior Lath Exterior Lath Electrical Inspections Electrical Service Meter -(Meter will be set within 2-3 business days after approval) Excludes New Construction Exterior Plaster (Brown Coat) T-Bar (Struct., Ele., or Mec.) Grease Interceptor iDo not hankfill unless sinned off) Sewer Water Engineering Backflow (Testable Only) Water Service � 1 I 1 ' 'n - J, —a I ` —1 1 _ I N m b _ o J1 ' I 85 ; I RIDGE ' (15'-6") I 1 o' I i -j- - -- -- - - T----------- VAULTED Root Framin¢ Plan (E) ASSUMED ROOF WEIGHT: Concrete 7le(9.7)- 9.7 psf NEW CLASS A ROOF: Eagle - Eagle Standard Weight (9.8psO [IAPMO ER 1900J 'See Plan for Strengthening Requirements i Plan Notes: 1. THE ROOF SLOPE IS 5:12(ONO). 2. ALL FRAMING INDICATED ON THIS PLAN IS EXISTING UNLESS NOTED OTHERWISE. 3. THE CONTRACTOR SHALL VERIFY THAT THE EXISTING FRAMING SIZE AND SPACING MATCHES THAT SHOWN ON THE ROOF PLAN. SHOULD THERE BE A DISCREPANCY, THE CONTRACTOR SHALL NOTIFY THE ENGINEER IMMEDIATELY SO THAT AN UPDATED REPORT CAN BE PROVIDED. 4. THE SPAN INDICATED IN PARENTHESIS IS THE MAXIMUM SPAN FOR THE FRAMING IN THE GIVEN BAY SHOULD THE ACTUAL HORIZONTAL SPAN (NOT SLOPING SPAN) EXCEED THAT SHOWN, THE CONTRACTOR SHALL NOTIFYTHE ENGINEER IMMEDIATELY SO THAT AN UPDATED REPORT CAN BE PROVIDED. 5. WHERE THE EXISTING FRAMING COULD NOT BE VERIFIED IN THE FIELD DUE TO LIMITED ACCESS OR WAS COVERED WITH FINISHES, IT IS NOTED WITH AN ASTERISK(-). IN THESE INSTANCES THE CONTRACTOR SHALL VERIFY THE FRAMING AFTER THE EXISTING ROOF HAS BEEN REMOVED AND NOTIFYTHE ENGINEER IF THE EXISTING FRAMING DOES NOT MEET OR EXCEED THAT WHICH 15 INDICATED IN THE REPORT. 6. FRAMING SHOWN HAS NOT BEEN ANALYZED TO SUPPORT STORAGE LOAD5. WHERE STORED ITEMS EXIST ABOVE THE EXISTING CEILING JOISTS. IT SHOULD EITHER BE REMOVED OR ELSE SPREAD OUT SO AS NOTTO EXCEED MORE THAN 5 POUNDS PER SOUARE FOOT. OCopyrlght 2024 Regal Structural Group The following table provides a summary of the preceeding analysis and indicates which members (if any) require further field verification or strengthening. When strengthening is required, refer to the Roof Plan (and associated details when applicable) in this report for specific Information about the strengthening measures required for this project. Any required strengthning shall be completed prior to the Installation of any new roof loads. Refer to the Terms and Conditions section of this report for additional information about the means and methods of construction. ANALYSIS SUMMARY Member ID Is Field Verification by Contractor Required? Is Strengthening Required? j1 No No j2 No No B1 No No B2 No No 63 No No 64 No No B5 No No 86 No No SEAL AND SIGNATURE The preceding structural analysis has been performed by Regal Structural Group expressly for the project located at 951 Slay Cir in Anaheim, California. The analysis and recommendations are based on the as -built conditions at the time of the structural survey noted in this report. Any alterations or modifications to the existing roof structure after the survey date have not been taken into account. If any modifications have occurred, further investigation and analysis would be required prior to Implementing any reroofing or strengthening. Nick Murph, P. E. I M aging Principl November 14,2024 DATE �y0 ,AS ,-,, 1G Nys . No 71600 Ev IM 125 '.. C,vl\ _" SEAL REGALRegal Structural Group 3B5]P Birth AB080m STRUCTURAL GROUP p:949."1,4498 e: roofs@regalstructuralgroup.com ®Copyright 2024 Regal Structural Group BUILDING DIVISION CITY OF ANAHF 11v1 BUILDING DEPARTMENT 200 S. Anaheim Blvd., Suite 145 Anaheim, CA 92805 714 765-5153 w .anaheim.net/buiIding SMOKE DETECTORS AND CARBON MONOXIDE SELF ' Final inspection approval will reauire this completed form to be on ; 2016 CALIFORNIA CODES CODE CYCLE 01/01/2017 EEEECTTMDATE CERTIFICATION Permit Number: 134w 202Y" &66YK Date: Project address: Property Owner: The undersigned does hereby certify that I am the p erty owner of the above referenced property. I further certify that smoke alarms and carbon monoxide alarms are present and functional in all the following locations. All boxes must be checked below ❑ Smoke Alarms and Carbon Monoxide Alarm: On the ceiling or wall outside of each separate sleeping area in the immediate vicinity of bedroom/s or in each hallway outside of the rooms. ❑ Smoke Alarms: In each room used for sleeping purposes. ❑ Smoke Alarm and Carbon Monoxide Alarm: In each story, including any habitable basement; (Note: in dwellings or dwelling units with split levels and without an intervening door between the adjacent levels, a smoke alarm and a carbon monoxide detector installed on the upper level shall suffice for the adjacent lower level provided that the lower level is less than one full story below the upper level.) All Signature: carbon monoxide detectors. Date: //—/4, ZZ/ California Residential Code (CRV Section R314.6.2,CRC R315.2 states in part that existing dwellings be "retrofitted with smoke detectors and carbon monoxide detectors when a building permit is issued for work on or in a building that is valued at $1,000 or more." CRC Section R314.3, CRC R315.2 defines required locations as indicted above. NOTE: This certification is only used when normal access to the interior of the dwelling by the City of Anaheim Inspector is not achieved during the course of project construction. It is normally used for exterior projects such as re -roofing, re -siding, patio covers, solar photovoltaic installations, and similar exterior construction work. 200 S. Anaheim Blvd., Suite 145 Anaheim, California 92805 (714)765-5153 Phone (714)765-4607 Fax FEB 2018 w .anaheim.net/building B842 I SMOKE/ CO ALARM REQUIRED LOCATIONS Figure t �7 Bedroom Living Room Basement Family Room Bed room Dining 1 Living Room Kitchen Bedroom Bedroom Figure 2 4' Acceptable J 4� Here Never Here �tr Attic Top of Detector Acceptable Here Wall Hall Bedroom Figure 4 Hall Kitchen Figure 3 REQUIRED SMOKE ALARM LOCATION lye/ REQUIRED CARBON MONOXIDE ALARM LOCATION Garage