Permit Number: BLD2024-06048
Issued: 11115/2024
www.a nahei m. net/bu ilding
(714)765-0626
Quarter Section: 216
Site Address: 951 S JAY CIR, ANAHEIM, CA 92808
Legal Description: N TR 9466 BLK LOT 57
APN: 35638127
CITY OF ANAHEIM
BUILDING DIVISION
200 S. ANAHEIM BLVD.
(714) 765 - 5153
Project Description: Reroof: Remove existing material to install (25) squares of tile roofing over house and attached garage
Living Area: Number of Stones: 1 valuation:
Garage Area: Construction Types:
Carport Area: Occupancy Groups:
Balcony I Deck Area: Fire Sprinklered:
Cool Root: Total Fees paid for Permit:
35,000.00
NIA
No
626.55
People Associated with Project:
Contractor
HOYT ROOFS INC 1809 N ORANGETHORPE PARKABCDE11140254 ANAHEIM, CA 92801
Permit Applicant
Fernando Toredo
Owner
TELLINGHUISEN, RICHARD DEAN TR 951 S JAY CIR
Type Electrical Fixtures City Type Plumbing Fixtures Oty Mechanical Fixtures City
The permit shall expire by limitation and become null and void if the building or work has not passed final inspection 365 days from the
date of permit issuance. A new permit is required to commence or continue work.
P�rhlEtAt �q<
Cityof Anaheim OQ iO
Building Division _� i
u >
OLNDED taF^
Do not occupy this building until the final inspections have been made.
FINAL INSPECTIONS
DATE
INSPECTOR
All applicable items below must be signed before utilities are released
Final Gas Test
Electrical Final
Plumbing Final
Mechanical Final
Cross Connection Control (714) 765-4280
Engineering Final (714) 765-5126
INSPECTION
I DATE
I INSPECTOR
Fire Sprinkler (ONLY) (714) 765-5041
Do not pour concrete until the following applicable items have been signed:
Fire Dept. Final (714) 765-5041
Plumbing (GroundlUnderfloor Drain Waste)
Water Engineering (714) 765-4591
Electrical Ground ElectrodelUfer
Sub List/Bus. Lic. (714) 765-5194 (Allow 10 business days)
Setback/Forms/Trenches (Footings)
COA/Migation Measures
Do not install subfloor or pour floor slab until the follwing applicable items have been
sianed
Building Final (714 765-5163)
Last Inspection -Final Only After Above Completed
N
�v
Plumbing (Ground/Underfloor Water)
Underfloor Rough Gas
PARTIAL INSPECTIONS
Building Inspections
Mechanical (Groundwork)
Electrical (Underground Conduit)
Pre -slab (Compaction/Membrane Reinf.)
Floor (JoistlGirders)
Underfloor Insulation (Raised Foundation Only)
Floor Nailing (Raised Foundation Only)
2nd Floor (Floor Nailing)
Do not cover or conceal the work below until the following applicable items have
been sioned:
1st Floor Shear
Firesprinkler (Rough) (Fire Dept.)
Mechanical Inspections
2nd Floor Shear
Roof (Sheathing/Diaphragm/Frame)
Masonry (Reinf./Bond Beam/Pre-Grout)
Rough Plumbing (Top Out)
Rough Duct (Mechanical)
Rough Mechanical
Rough Electrical
Rough COA/Mitagation Measures
Plumbing Inspections
Framing (Only after Plbg., Ele.. Mec. & Fire)
Insulation (Sound/Energy)
Do not tape or plaster until the following applicable items have been signed:
Drywall
Drywall Penetrations (Ele, Mec & Plbg)
Interior Lath
Exterior Lath
Electrical Inspections
Electrical Service Meter -(Meter will be set within 2-3
business days after approval) Excludes New
Construction
Exterior Plaster (Brown Coat)
T-Bar (Struct., Ele., or Mec.)
Grease Interceptor
iDo not hankfill unless sinned off)
Sewer
Water Engineering Backflow (Testable Only)
Water Service
� 1
I
1 '
'n - J,
—a
I
` —1
1
_
I
N
m
b
_
o
J1
'
I
85
;
I
RIDGE '
(15'-6")
I
1
o'
I
i
-j- - -- -- - - T-----------
VAULTED
Root Framin¢ Plan
(E) ASSUMED ROOF WEIGHT: Concrete 7le(9.7)- 9.7 psf
NEW CLASS A ROOF: Eagle - Eagle Standard Weight (9.8psO [IAPMO ER 1900J
'See Plan for Strengthening Requirements
i
Plan Notes:
1. THE ROOF SLOPE IS 5:12(ONO).
2. ALL FRAMING INDICATED ON THIS PLAN IS EXISTING UNLESS NOTED OTHERWISE.
3. THE CONTRACTOR SHALL VERIFY THAT THE EXISTING FRAMING SIZE AND SPACING MATCHES THAT
SHOWN ON THE ROOF PLAN. SHOULD THERE BE A DISCREPANCY, THE CONTRACTOR SHALL NOTIFY THE
ENGINEER IMMEDIATELY SO THAT AN UPDATED REPORT CAN BE PROVIDED.
4. THE SPAN INDICATED IN PARENTHESIS IS THE MAXIMUM SPAN FOR THE FRAMING IN THE GIVEN BAY
SHOULD THE ACTUAL HORIZONTAL SPAN (NOT SLOPING SPAN) EXCEED THAT SHOWN, THE
CONTRACTOR SHALL NOTIFYTHE ENGINEER IMMEDIATELY SO THAT AN UPDATED REPORT CAN BE
PROVIDED.
5. WHERE THE EXISTING FRAMING COULD NOT BE VERIFIED IN THE FIELD DUE TO LIMITED ACCESS OR WAS
COVERED WITH FINISHES, IT IS NOTED WITH AN ASTERISK(-). IN THESE INSTANCES THE CONTRACTOR
SHALL VERIFY THE FRAMING AFTER THE EXISTING ROOF HAS BEEN REMOVED AND NOTIFYTHE
ENGINEER IF THE EXISTING FRAMING DOES NOT MEET OR EXCEED THAT WHICH 15 INDICATED IN THE
REPORT.
6. FRAMING SHOWN HAS NOT BEEN ANALYZED TO SUPPORT STORAGE LOAD5. WHERE STORED ITEMS
EXIST ABOVE THE EXISTING CEILING JOISTS. IT SHOULD EITHER BE REMOVED OR ELSE SPREAD OUT SO AS
NOTTO EXCEED MORE THAN 5 POUNDS PER SOUARE FOOT.
OCopyrlght 2024 Regal Structural Group
The following table provides a summary of the preceeding analysis and indicates which members (if any) require further field verification or strengthening. When strengthening is
required, refer to the Roof Plan (and associated details when applicable) in this report for specific Information about the strengthening measures required for this project. Any required
strengthning shall be completed prior to the Installation of any new roof loads. Refer to the Terms and Conditions section of this report for additional information about the means and
methods of construction.
ANALYSIS SUMMARY
Member ID
Is Field Verification by Contractor Required?
Is Strengthening Required?
j1
No
No
j2
No
No
B1
No
No
B2
No
No
63
No
No
64
No
No
B5
No
No
86
No
No
SEAL AND SIGNATURE
The preceding structural analysis has been performed by Regal Structural Group expressly for the project located at 951 Slay Cir in Anaheim, California.
The analysis and recommendations are based on the as -built conditions at the time of the structural survey noted in this report. Any alterations or modifications to the existing
roof structure after the survey date have not been taken into account. If any modifications have occurred, further investigation and analysis would be required prior to
Implementing any reroofing or strengthening.
Nick Murph, P. E. I M aging Principl
November 14,2024
DATE
�y0 ,AS ,-,,
1G Nys .
No 71600
Ev IM 125
'.. C,vl\ _"
SEAL
REGALRegal Structural Group
3B5]P Birth AB080m
STRUCTURAL GROUP p:949."1,4498
e: roofs@regalstructuralgroup.com
®Copyright 2024 Regal Structural Group
BUILDING DIVISION
CITY OF ANAHF 11v1
BUILDING DEPARTMENT
200 S. Anaheim Blvd., Suite 145
Anaheim, CA 92805
714 765-5153
w .anaheim.net/buiIding
SMOKE DETECTORS AND CARBON MONOXIDE SELF
' Final inspection approval will reauire this completed form to be on ;
2016 CALIFORNIA CODES
CODE CYCLE
01/01/2017
EEEECTTMDATE
CERTIFICATION
Permit Number: 134w 202Y" &66YK Date:
Project address:
Property Owner:
The undersigned does hereby certify that I am the p erty owner of the above referenced
property. I further certify that smoke alarms and carbon monoxide alarms are present and
functional in all the following locations. All boxes must be checked below
❑ Smoke Alarms and Carbon Monoxide Alarm: On the ceiling or wall outside of each separate
sleeping area in the immediate vicinity of bedroom/s or in each hallway outside of the rooms.
❑ Smoke Alarms: In each room used for sleeping purposes.
❑ Smoke Alarm and Carbon Monoxide Alarm: In each story, including any habitable basement;
(Note: in dwellings or dwelling units with split levels and without an intervening door between
the adjacent levels, a smoke alarm and a carbon monoxide detector installed on the upper level
shall suffice for the adjacent lower level provided that the lower level is less than one full story
below the upper level.)
All
Signature:
carbon monoxide detectors.
Date: //—/4, ZZ/
California Residential Code (CRV Section R314.6.2,CRC R315.2 states in part that existing dwellings be
"retrofitted with smoke detectors and carbon monoxide detectors when a building permit is issued for work on or
in a building that is valued at $1,000 or more." CRC Section R314.3, CRC R315.2 defines required locations as
indicted above.
NOTE: This certification is only used when normal access to the interior of the dwelling by the City of Anaheim
Inspector is not achieved during the course of project construction. It is normally used for exterior projects such
as re -roofing, re -siding, patio covers, solar photovoltaic installations, and similar exterior construction work.
200 S. Anaheim Blvd., Suite 145 Anaheim, California 92805 (714)765-5153 Phone (714)765-4607 Fax FEB 2018
w .anaheim.net/building B842
I
SMOKE/ CO ALARM REQUIRED LOCATIONS
Figure t
�7
Bedroom
Living Room
Basement
Family Room
Bed room
Dining
1
Living Room
Kitchen
Bedroom
Bedroom
Figure 2
4'
Acceptable J 4�
Here Never
Here �tr
Attic Top of Detector
Acceptable Here
Wall
Hall Bedroom Figure 4
Hall Kitchen
Figure 3
REQUIRED SMOKE ALARM LOCATION
lye/ REQUIRED CARBON MONOXIDE ALARM LOCATION
Garage