509 N WEST STPermit Types
BLD I ELE I MEC PLM
X
Permit Number: BLD2024-05783
Issued: 10/30/2024
www.ansheim.net/building
(714)765-4626
Quarter Section: 62
CITY OF ANAHEIM
BUILDING DIVISION
200 S. ANAHEIM BLVD.
(714) 765 - 5153
Site Address: 509 N WEST ST, ANAHEIM, CA 92801
Legal Description: N TR 4248 BLK LOT 4
APN: 03449507
Project Description: Patio Cover: 256 S.F. covered patio.
Living Area: Number of Stories:
2 Valuation: 5.000.00
Garage Area:
Construction Types: VB
Carport Area
Occupancy Groups:
Balcony I Deck Area:
Fire Sprinklered:
Cool Roof:
Total Fees paid for Permit: 380.39
People Associated with Project:
Permit Applicant Deltima Freeland
Owner MONTALVO, ELIAS & MARIA S 509 N WEST ST
Type Electrical Fixtures Qty Type Plumbing Fixtures Oty Mechanical Fixtures Qty
The permit shall expire by limitation and become null and void if the building or work has not passed final Inspection 365 days from the
date of permit issuance. A new permit is required to commence or continue work.
PNf,NEIM C�<
Cityof Anaheim pF iO
Building Division Z
� >
ooNOEo ta`'
Do not occupy this building until the final inspections have bw made.
FINAL INSPECTIONS
DATE
INSPECTOR
All applicable items below must be signed before utilities are released
Final Gas Test
Electrical Final
Plumbing Final
Mechanical Final
Cross Connection Control (714) 765-4280
Engineering Final (714) 765-5126
INSPECTION
DATE
I INSPECTOR
Fire Sprinkler (ONLY) (714) 765-5041
Do not pour concreie until the following applicable items have been signed
Fire Dept. Final (714) 765-5041
Plumbing (Ground/Underfloor Drain Waste)
Water Engineering (714) 765.4591
Electrical Ground Electrode/Ufer
Sub List/Bus. Lic. (714) 765-5194 (Allow 10 business days)
Setback/Forms/Trenches (Footings)
/
COA/Migation Measures
Do not install subfloor or pour floor slab until the follwing ap tic ble items have been
sianed
Building Final (714 765.5153)
Last Inspection -Final Only After Above Completed
1lbl'�,1�
j1r(V
w t
Plumbing (Ground/Underfloor Water)
Underfloor Rough Gas
PARTIAL INSPECTIONS
Building Inspections
Mechanical (Groundwork)
Electrical (Underground Conduit)
Pre -slab (Compaction/Membrane Reinf.)
Floor (Joist/Girdem)
Underfloor Insulation (Raised Foundation Only)
Floor Nailing (Raised Foundation Only)
2nd Floor (Floor Nailing)
Do not cover or conceal the work below until the following applicable items have
been d
1st Floor Shear
Firesprinkler (Rough) (Fire Dept.)
Mechanical Inspections
2nd Floor Shear
Roof (Sheathing/Diaphragm/Frame)
Masonry (Reinf./Bond Beam/Pre-Grout)
Rough Plumbing (Top Out)
Rough Duct (Mechanical)
Rough Mechanical
Rough Electrical
Rough COA/Mitagation Measures
Plumbing Inspections
Framing Only after "bg Ele_, Mec- & Fire)
Insulation (Sound/Energy)
Do not tape or plaster until the following applicable items have been signed.
Drywall
Drywall Penetrations (Ele, Mee & Plbg)
Interior Lath
Exterior Lath
Electrical Inspections
Electrical Service Meter -(Meter will be set within 2-3
business days after approval) Excludes New
Construct on
Exterior Plaster (Brown Coat)
T-Bar (Struct., Ele., or Mec.)
Grease Interceptor
(Do not backfill unless &roned off)
Sewer
Water Engineering Backflow, (Testable Only)
Water Service