Loading...
509 N WEST STPermit Types BLD I ELE I MEC PLM X Permit Number: BLD2024-05783 Issued: 10/30/2024 www.ansheim.net/building (714)765-4626 Quarter Section: 62 CITY OF ANAHEIM BUILDING DIVISION 200 S. ANAHEIM BLVD. (714) 765 - 5153 Site Address: 509 N WEST ST, ANAHEIM, CA 92801 Legal Description: N TR 4248 BLK LOT 4 APN: 03449507 Project Description: Patio Cover: 256 S.F. covered patio. Living Area: Number of Stories: 2 Valuation: 5.000.00 Garage Area: Construction Types: VB Carport Area Occupancy Groups: Balcony I Deck Area: Fire Sprinklered: Cool Roof: Total Fees paid for Permit: 380.39 People Associated with Project: Permit Applicant Deltima Freeland Owner MONTALVO, ELIAS & MARIA S 509 N WEST ST Type Electrical Fixtures Qty Type Plumbing Fixtures Oty Mechanical Fixtures Qty The permit shall expire by limitation and become null and void if the building or work has not passed final Inspection 365 days from the date of permit issuance. A new permit is required to commence or continue work. PNf,NEIM C�< Cityof Anaheim pF iO Building Division Z � > ooNOEo ta`' Do not occupy this building until the final inspections have bw made. FINAL INSPECTIONS DATE INSPECTOR All applicable items below must be signed before utilities are released Final Gas Test Electrical Final Plumbing Final Mechanical Final Cross Connection Control (714) 765-4280 Engineering Final (714) 765-5126 INSPECTION DATE I INSPECTOR Fire Sprinkler (ONLY) (714) 765-5041 Do not pour concreie until the following applicable items have been signed Fire Dept. Final (714) 765-5041 Plumbing (Ground/Underfloor Drain Waste) Water Engineering (714) 765.4591 Electrical Ground Electrode/Ufer Sub List/Bus. Lic. (714) 765-5194 (Allow 10 business days) Setback/Forms/Trenches (Footings) / COA/Migation Measures Do not install subfloor or pour floor slab until the follwing ap tic ble items have been sianed Building Final (714 765.5153) Last Inspection -Final Only After Above Completed 1lbl'�,1� j1r(V w t Plumbing (Ground/Underfloor Water) Underfloor Rough Gas PARTIAL INSPECTIONS Building Inspections Mechanical (Groundwork) Electrical (Underground Conduit) Pre -slab (Compaction/Membrane Reinf.) Floor (Joist/Girdem) Underfloor Insulation (Raised Foundation Only) Floor Nailing (Raised Foundation Only) 2nd Floor (Floor Nailing) Do not cover or conceal the work below until the following applicable items have been d 1st Floor Shear Firesprinkler (Rough) (Fire Dept.) Mechanical Inspections 2nd Floor Shear Roof (Sheathing/Diaphragm/Frame) Masonry (Reinf./Bond Beam/Pre-Grout) Rough Plumbing (Top Out) Rough Duct (Mechanical) Rough Mechanical Rough Electrical Rough COA/Mitagation Measures Plumbing Inspections Framing Only after "bg Ele_, Mec- & Fire) Insulation (Sound/Energy) Do not tape or plaster until the following applicable items have been signed. Drywall Drywall Penetrations (Ele, Mee & Plbg) Interior Lath Exterior Lath Electrical Inspections Electrical Service Meter -(Meter will be set within 2-3 business days after approval) Excludes New Construct on Exterior Plaster (Brown Coat) T-Bar (Struct., Ele., or Mec.) Grease Interceptor (Do not backfill unless &roned off) Sewer Water Engineering Backflow, (Testable Only) Water Service