Permit Number: BLD2021.04581
Issued: 12/01/2021
www.anaheim.net/building
(714)7654626
Quarter Section: 71
Site Address: 901 N DICKEL ST, ANAHEIM, CA 92805
Legal Description: N TR 374 BILK B LOT 14
APN: 03423213
CITY OF ANAHEIM
BUILDING DIVISION
200 S. ANAHEIM BLVD.
(7141 765 - 5153
Project Description: (ADLI) Residential Addition: Convert 600 sq ft detached garage into an accessory dwelling unit with (2) bedrooms,
(1) bath and kitchen.
LMrg Area:
Garage Area:
Carport Area:
Balcony / Deck Area:
Cool Roof
600 Number of Stories.
1 Valuation:
Construction Types:
Occupancy Groups:
Fire Sprinklered:
Total Fen paid for Permk:
50.000.00
VB
No
4,007.30
People Associated with Project:
Contractor DE LA ROSA CONSTRUCTION
3627 E FIRST STREET200512221107227310 LOS ANGELES, CA 90063
Permit Applicant GERARDO DE LA ROSA
3627 E. First St LOS ANGELES, CA 90063 0000
Owner GARCIA JOSE J TR
901 N DICKEL ST
Type Electrical Fixtures City
Type
Plumbing Fixtures Oty
Mechanical Fixtures
Oly
Motors - Factory Wired Appliance, up to 1 1
Garbage Disposal
1
Gas System (outlets)
1
h.p.
Kitchen Sink
1
Heating Appliances, including vent
1
New or total rewire - 1 or 2 family 6D0
Heating/Cooling Coll
1
Sub Panel/Temp Pwr - Under 600 V, up to 1
Lavatory
1
Residential Registers
3
200 amps
Repair/Drainage Aberationi Piping 1
Ventilation Fan - <= 300 cfm on single duct
3
Sewer per 100 R.
1
Shower
1
Washing Machine Rough
Water Closet
Water Distribution
Water Heater
Water Main per 100 ft.
The permit shall expire by limitation and become null and void If the building or work has not passed final Inspection 365 days from the
dale of permit Issuance. A new permit Is required to commence or continue work.
P�PHEIM �q<
Cityof Anaheim D� i0
Building Division F i
'
�OVArDEO tA�^
Do not occupy this building until the final inspections have been made.
FINAL INSPECTIONS
DATE
INSPECTOR
All applicable items below must be signed before utilities are released
Final Gas Test
Electrical Final
Plumbing Final
Z 6
Mechanical Final
Qi
Cross Connection Control (714) 765-4280
Engineering Final (714) 765-5126
INSPECTION
I DATE
INSPECTOR
Fire Sprinkler (ONLY) (714) 765-5041
Do not pour concrete unln the following applicable iter^a i i, r ed.
Fire Dept. Final (714) 765-5041
Plumbing (Ground/Underfloor Drain Waste)
Water Engineering (714) 765-4591
Electrical Ground Electrode/Ufer
Sub List/Bus. Lic. (714) 765-5194 (Allow 10 business days)
Setback/Forms/Trenches (Footings)
I
JCOAIMigation Measures
Do not install subfloor or pour floor slab until the follwing applicable items have been
Building Final (714 765-6153)
Last Inspection -Final Only After Above Completed
�yl
Plumbing (Ground/Underfloor Water)
Underfloor Rough Gas
PARTIAL INSPECTIONS
Building Inspections
Mechanical (Groundwork)
Electrical (Underground Conduit)
Pre -slab (Compaction/Membrane Reinf.)
Floor (Joist/Girders)
Underfloor Insulation (Raised Foundation Only)
Floor Nailing (Raised Foundation Only)
2nd Floor (Floor Nailing)
Do not cover or conceal the work below until the following applicable items have
been signed
1st Floor Shear
Firesprinkler (Rough) (Fire Dept.)
Mechanical Inspections
Furor Shear OL1 f
(
--�
Roof (Sheathing/Diaphragm/Frame)
Masonry (Reinf./Bond Beam/Pre-Grout)
Rough Plumbing (Top Out)
Rough Duct (Mechanical)
Rough Mechanical
Rough Electrical
Rough COA/Mitagation Measures
Plumbing Inspections
Framing (Only after Plbg., Ele., Mec. & Fire)
Insulation (Sound/Energy)
-
Do not tape or plaster until the following applicable items have been signed
Drywall
Drywall Penetrations (Ele, Mec & Plbg)
Interior Lath
Exterior Lath
Electrical Inspections
rl/ �/ 4ctq '
VV��VV
Electrical Service Meter -(Meter will be set within 2-3
business days after approval) Excludes New
Construction
��
Exterior Plaster (Brown Coat)
T-Bar (Struct., Ele., or Mec.)
Grease Interceptor
Sewer
Water Engineering Backflow (Testable Only)
Water Service