Loading...
211 N OLIVE STPermit Types BLD ELE MEC PLM X Permit Number: BL02024-05963 Issued: 11/12/2024 www.anaheim.net/building (714)765-4626 Quarter Section: 83 CITY OF ANAHEIM BUILDING DIVISION 200 S. ANAHEIM BLVD. (714) 766 - 5153 Site Address: 211 N OLIVE ST, ANAHEIM, CA 92805 Legal Description: A TR VINEYARD LOT-D-3 BLK A LOT 11 VINEYARD LOT-D- APN:25507424 Project Description: Reroof: To remove and install (27) squares of composition shingles over house and detached garage Living Area: Number of stores: 1 Valuation: Garage Area: Construction Types: Carport Area: Occupancy Groups: Balcony I Deck Area: Fire Sprinklered: Cool Roof: Total Fees paid for Permit: People Associated with Project: Contractor J - M ROOFING CO 7487 CONCORD AVENUE FONTANA, CA Permit Applicant JOEL MUNOZ, OWNER 7487 CONCORD AVE FONTANA, CA 92336 Owner KATAOKA, DAVID 211 N OLIVE ST Type Electrical Fixtures Qty Type Plumbing Fixtures Qty Mechanical Fixtures 18,500.00 VB 361A1 The permit shall expire by limitation and become null and void if the building or work has not passed final inspection 365 days from the date of permit issuance. A new permit Is required to commence or continue work. PaPHEItM tqC Cityof Anaheim O iO Building Division _ y � \• �D�NDED v Do not occupy this building until the final inspections have been made. FINAL INSPECTIONS DATE INSPECTOR All applicable items below must be signed before utilities are released Final Gas Test Electrical Final Plumbing Final Mechanical Final Cross Connection Control (714) 7654280 Engineering Final (714) 765-5126 INSPECTION I DATE I INSPECTOR Fire Sprinkler (ONLY) (714) 765-6041 Do not pour concrete until the following applicable items have been signed: Fire Dept. Final (714) 765-5041 Plumbing (Ground/Underfloor Drain Waste) Water Engineering (714) 7664691 Electrical Ground Electrode/Ufer Sub LisVBus. Lic. (714) 765-5194 (Allow 10 business days) Setback/Forms/Trenches (Footings) COA/Migation Measures Do not install subfloor or pour floor slab until the folWng applicable items have been sioned Building Final (714 7655153) Last Inspection -Final Only After Above Completed + It IZ6i'pl� '1 ,� �cxv Plumbing (Ground/Underfloor Water) Underfloor Rough Gas PARTIAL INSPECTIONS Building Inspections Mechanical (Groundwork) Electrical (Underground Conduit) Pre -slab (Compaction/Membrane Reinf.) Floor (JoisVGirders) Underfloor Insulation (Raised Foundation Only) Floor Nailing (Raised Foundation Only) 2nd Floor (Floor Nailing) Do not cover or conceal the work below until the fallowing applicable items have been sianed 1st Floor Shear Firesprinkler (Rough) (Fire Dept.) Mechanical Inspections 2nd Floor Shear Roof(Sheathing/Diaphragm/Frame) II �911r Masonry (Reinf./Bond Beam/Pre-Grout) Rough Plumbing (Top Out) Rough Duct (Mechanical) Rough Mechanical Rough Electrical Rough COA/Mitagation Measures. Plumbing Inspections Framing (Only after Plbg., Ele., Mec. & Fire) Insulation (Sound/Energy) Do not tape or plaster until the following applicable items have been signed. Drywall Drywall Penetrations (Ele, Mec & Plbg) Interior Lath Exterior Lath Electrical Inspections Electrical Service Meter -(Meter will be set within 2-3 business days after approval) Excludes New Construction Exterior Plaster (Brown Coat) T-Bar (Struct., Ele., or Mec.) Grease Interceptor (Do not backf 11 unless sioned off) Sewer Water Engineering Backflow (Testable Only) Water Service