Loading...
747 N MAVIS ST (2)Permit Types BLD ELE MEC PLM X Permit Number: BLD2010-00739 Issued: 03/04/2010 www.anaheim.net/building (714)765-4626 Quarter Section82 CITY OF ANAHEIM BUILDING DIVISION 200 S. ANAHEIM BLVD. (714)765. 5153 Site Address: 747 N MAVIS ST, ANAHEIM, CA 92805 Legal Description: TR 3051 LOT 1 AND LOTS 2 TO 11 INC APN: 03520412 Project Description: Residential Remodel: Remove and replace 18 windows for apartment complex. Living Area: Number of Stones: Valuation: 2.400.00 Garage Area: Construction Types: VB Carport Area: Occupancy Groups: Balcony I Deck Area: Fire Spnnklered: No Cool Roof: Total Fees paid for Permit: 249.23 People Associated with Project: Contractor AASH CONSTRUCTION INC 11862 BALBOA BLVD201003031131435120 GRANADA HILLS, CA 91344 Permit Applicant ADAM HAMOUI Owner PS INVESTMENTS I 3619 WESLIN AVENUE SHERMAN OAKS, CA 91423 Type Electrical Fixtures Cry Type Plumbing Fixtures Oty Mechanical Fixtures Cry The permit shall expire by limitation and become null and void if the building or work has not passed final inspection 365 days from the date of permit issuance. A new permit is required to commence or continue work. HPHEIM C� Cityof Anaheim DF P `'O Building Division _f i > • �DVNDEO yak^ Do not occupy this building until the final inspections have been made. FINAL INSPECTIONS DATE INSPECTOR All applicable items below must be signed before utilities are released Final Gas Test Electrical Final Plumbing Final Mechanical Final Cross Connection Control (714) 765.4280 Engineering Final (714) 765-5126 INSPECTION I DATE I INSPECTOR Fire Sprinkler (ONLY) (714) 765.5041 Do not pour concrete until the following applicable items have been signed: Fire Dept. Final (714) 7665041 Plumbing (Ground/Underfloor Drain Waste) Water Engineering (714) 765-4591 Electrical Ground ElectrodelUfer Sub LIstlBus. Lic. (714) 765-5194 (Allow 10 business days) Setback/Forms/Trenches (Footings) JCOAJMigation Measures Do not install subfloor or pour floor slab until the follwng applicable items have been stoned Building Final (714 765.5153) Last Inspection -Final Only After Above Completed / Plumbing (GroundlUnderFloor Water) Underfloor Rough Gas PARTIAL INSPECTIONS Building Inspections Mechanical (Groundwork) Electrical (Underground Conduit) Preslab (Compaction/Membrane Reinf.) Floor (JoisVGirders) Underfloor Insulation (Raised Foundation Only) Floor Nailing (Raised Foundation Only) 2nd Floor (Floor Nailing) Do not cover or conceal the work below until the following applicable items have been sioned 1st Floor Shear Firesprinkler (Rough) (Fire Dept.) Mechanical Inspections 2nd Floor Shear Roof (Sheathing/Diaphragm/Frame) Masonry (Reinf./Bond Beam/Pre-Grout) Rough Plumbing (Top Out) Rough Duct (Mechanical) Rough Mechanical Rough Electrical Rough COA/Mitagation Measures Plumbing Inspections Framing (Only after Plbg., Ele.. Mec. 8 Fire) 2 (� Insulation (Sound/Energy) Do not tape or plaster until the following applicable items have been signed: Drywall Drywall Penetrations (Ele, Mec & Plbg) Interior Lath Exterior Lath Electrical Inspections Electrical Service Meter -(Meter will be set within 2-3 business days after approval) Excludes New Construct on Exterior Plaster (Brown Coat) T-Bar (Struct., Ele., or Mec.) Grease Interceptor hackfill -enert off) (no not unless Sewer Water Engineering Backflow (Testable Only) Water Service