520 N CITRON ST B (2)Av
Permit Types
BLD
ELE
MEC
PLM
X
X
X
X
Permit Number: BLD2023-05034
Issued: 01/30/2024
www.anaheim.net/bu i Iding
(714)765-4626
Quarter Section: 62
Site Address: 520 N CITRON ST B, ANAHEIM, CA 92805
CITY OF ANAHEIM
BUILDING DIVISION
200 S. ANAHEIM BLVD.
(714)765. 5153
��nti hJ nl c t
• SSA
r ,
Legal Description: N TR 2237 BLK LOT 67 ' --
APN: 03420107 .,.
Project Description: (ADU) Residential Addition: Convert 367 sq. ft. attached garage with 273 sq. ft. addition into new accessory dwelling
unit with 200 amp dual meter. (2BD/1 BA). REF BLD2024-00328
Living Area:
640 Number of Stones:
1 Valuation: 80,000.00
Garage Area:
Construction Types: VA
Carport Area:
Occupancy Groups:
Balcony I Deck Area:
Fire Sprinklered:
Cool Roof:
Total Fees paid for Permit: 4,223.77
People Associated with
Project:
Permit Applicant
Raul Ramirez
Owner
GONZALEZ, DESIREE A
520 N CITRON ST
Contractor
CASANOVA RENOVATION
1407 N BATAVIA ST STE 108201903271351244030 ORANGE, CA 92867
Engineer
CONWAY COOKE
18726 S Western Ave ste 208199912171424155160 Gardena, CA 90248
Type Electrical Fixtures
Meter/Disc Sw - Under 600 V, up to 200
amps
New or total rewire - 1 or 2 family
Qty Type Plumbing Fixtures
2 Garbage Disposal
640 Gas System (outlets)
Kitchen Sink
Lavatory
Repair/Drainage Alteration/Vent Piping
Sewerperl00ft.
Shower
Washing Machine Rough
Water Closet
Water Distribution
Water Heater
Water Main per 100 ft.
y Mechanical Fixtures
1 Mini Split (Exterior condenser)
1 Mini Split (room unit)
1 Ventilation Fan - <= 300 cm on single duct
1
i
i
1
1
1
1
1
1
1
2
3
The permit shall expire by limitation and become null and void if the building or work has not passed final Inspection 365 days from the
date of permit Issuance. A new permit is required to commence or continue work.
0
PNI,HEIM 4.dC
City of Anaheim 04 iO
Building Division i
>
• �OVNDEO vah1
Do not occupy this building until the final inspections have been made.
FINAL INSPECTIONS
DATE
I INSPECTOR
All applicable items below must be signed before utilities are released
Final Gas Test
Electrical Final
�"
kiti
Plumbing Final
Mechanical Final
Cross Connection Control (714) 765.4280
Engineering Final (714) 765.5126
INSPECTION
I
Fire Sprinkler (ONLY) (714) 765-5041
Do not pour concrete until the following applicable iteFire
Dept. Final (714) 765.5041
Plumbing (GroundlUnderfloor Drain Waste)Water
Engineering (714) 765.4591
Electrical Ground Electrode/UferSub
Kbeensigned
List/Bus. Lic. (714) 765.5194 (Allow 10 business days)
Setback/Forms/Trenches (Footings)COA/Migation
Measures
Do notinsl_m _.or or pour floor slab until the follvdng a
signed
Building Final (714 765.5153)
Last Inspection -Final Only After Above Completed
Jv/�
Plumbing(Ground/Underfloor Water)
Underfloor Rough Gas
PARTIAL INSPECTIONS
Building Inspections
Mechanical (Groundwork)
Electrical (Underground Conduit)
Pre -slab (Compaction/Membrane Reinf.)
Floor (Joist/Girders)
Underfloor Insulation (Raised Foundation Only)
Floor Nailing (Raised Foundation Only)
2nd Floor (Floor Nailing)
Do not cover or conceal the work below until the following applicable items have
been signed
1st Floor Shear
6'
Firesprinkler (Rough) (Fire Dept.)
Mechanical Inspections
2nd Floor Shear
Roof (Sheathing/Diaphragm/Frame)
Masonry (Reinf./Bond Beam/Pre-Grout)
Rough Plumbing (Top Out)
DG
Rough Duct (Mechanical)
Rough Mechanical
Rough Electrical
Rough COA/Mitagation Measures
Plumbing Inspections
Framing (Only after Plbg., Ele., Mec. & Fire)
PG
Insulation (Sound/Energy)
Do not tape or plaster until the Following applicable item=_ have been signed:
Drywall
L
Drywall Penetrations (Ele, Mec & Plbg)
Interior Lath
Exterior Lath
7
Electrical Inspections
Electrical Service Meter -(Meter will be set wnhm 2-3
business days after approval) Excludes New
Construction
Exterior Plaster (Brown Coat)
T-Bar (Struct., Ele., or Mec.)
Grease Interceptor
Sewer
Water Engineering Backflow (Testable Only)
Water Service