500 S ILLINOIS ST (3)Permit Types
BID
ELE
MEC
PLM
X
X
X
X
Permit Number: BLD2022-05570
Issued: 01/08/2024
www.anaheim.neUbu ilding
(714)765-4626
Quarter Section: 63
CITY OF ANAHEIM
BUILDING DIVISION
200 S. ANAHEIM BLVD.
f714) 765 - 5153
Site Address: 500 S ILLINOIS ST, ANAHEIM, CA 92805
Legal Description: N TR 335 BLK B LOT 1 TR 335 LOT 1 BLK B N 48.16 FT
APN: 03613231
Project Description: Residential Remodel: 120 sq ft to remodel kitchen and (2) bathrooms, new electrical throughout residence, replace
(10) windows, install (3) mini split systems. Work done prior to obtaining a permit REF: INV2022-00359, BLD2022-05572
Living Area: Number of Stofiesr i Valuation:
Garage Area', Construction Types:
CarportArea: Occupancy Groups:
Balcony I Deck Area: Fire Spnnkiered:
Cool Roof: Total Feu paid for Permit:
10,000.00
VB
No
2.253.78
People Associated with Project:
Permit Applicant Afroz Lokhandwala
Owner SOUTHLAND REALTY LLC 500 S ILLINOIS ST
Engineer- Civil WAOAS A KHAN 2095 E BALL RD ANAHEIM, CA 92806
Type Electrical Fixtures Oty Type Plumbing Fixtures Oty Mechanical Fixtures Oty
Receptacle, switches, lights 28 Bar Sink 1 Mini Split (room unit) 3
Sub Panel/Temp Pwr- Under 600 V, up to 1 Dishwasher 1
200 amps
Garbage Disposal 1
Kitchen Sink 1
Lavatory 2
Shower 2
Water Closet 2
The permit shall expire by limitation and become null and void if the building or work has not passed final Inspection 365 days from the
date of permit issuance. A new permit is required to commence or continue work.
aPHEIM _
Cityof Anaheim 04 P `'O
Building Division i
C >
UoVA'DED vsq^
Do not occupy this building until the final inspections have been made.
FINAL INSPECTIONS I
DATE I
INSPECTOR
All applicable items below must be signed before utilities are released
Final Gas Test
/
Electrical Final
276
Plumbing Final
Mechanical Final
4
Cross Connection Control (714) 765-4280
Engineering Final (714) 765-5126
INSPECTION I
DATE I
INSPECTOR
Fire Sprinkler (ONLY) (714) 765.5041
Do not pour concrete until the following applicable items have been signed:
Fire Dept. Final (714) 765-5041
Plumbing (Ground/Underfloor Drain Waste)
Water Engineering (714) 765-4591
Electrical Ground Electrode/Ufer
Sub List/Bus. Lic. (714) 765-5194 (Allow 10 business days)
Setback/FormsfTrenches (Footings)
COA/Migation Measures
Do not install subfloor or pour floor slab until the follwing applicable items have been
sian
Building Final (714 765-5153)
Last Inspection -Final Only After Above Completed
Plumbing (Ground/Underfloor Water)
Underfloor Rough Gas
PARTIAL INSPECTIONS
Building Inspections
Mechanical (Groundwork)
Electrical (Underground Conduit)
Pre -slab (Compaction/Membrane Reinf.)
Floor (Joist/Girdem)
Underfloor Insulation (Raised Foundation Only)
Floor Nailing (Raised Foundation Only)
2nd Floor (Floor Nailing)
Do not cover or conceal the work below until the following applicable items have
been signed
1st Floor Shear
Firesprinkler (Rough) (Fire Dept.)
Mechanical Inspections
2nd Floor Shear
Roof (Sheathing/Diaphragm/Frame)
Masonry (Reinf./Bond Beam/Pre-Grout)
Rough Plumbing (Top Out)
Rough Duct (Mechanical)
,t
Rough Mechanical
Rough Electrical
G
Rough COA/Mitagation Measures
Plumbing Inspections
Framing (Only after Plbg_ Ele_ Mec. 8 Fire)
Insulation (Sound/Energy)
Do not tape or plaster until the following applicable items have been signed:
Drywall
Drywall Penetrations (Ele, Mec & Plbg)
Interior Lath
Exterior Lath
Electrical Inspections
Electrical Service Meter -(Meter will be set within 2-3
business days after approval) Excludes New
Exterior Plaster (Brown Coat)
T-Bar (Struct., Ele., or Mec.)
Grease Interceptor
Sewer
Water Engineering Backflow (Testable Only)
Water Service