Loading...
837 S MARIAN WAY 839Permit Types - . ELE MEC FILM x x Permit Number: OLD2024-05281 Issued: 10/03/2024 www.anaheim.net/bu ilding (714)7654626 Quarter Section: 2 CITY OF ANAHEIM BUILDING DIVISION 200 S. ANAHEIM BLVD. (714) 765 -5153 Site Address: 837 S MARIAN WAY, Unit# 839, Anaheim, CA 92804 Legal Description: N TR 5529 BLK LOT 1 APN: 13424407 y PHEIAt (.. e Project Description: Plumbing to Replace (2) tank to (2) tankless water heater outside with eiechic fixture upgrades both Units 837 and 839. Living Area: Number of Stories: 0 Valuation: Garage Area: Construction Types: Carport Area: Occupancy Groups: Balcony I Deck Area: Fire Sprinklered: Cool Roof: Total Fees paid for Permit: 0.00 NIA 306.00 People Associated with Project: Contractor SYNERGY COMPANIES 5141 MAPLEWOOD CIR OCEANSIDE, CA 94545 Permit Applicant Donnis Baker Owner NGO, JENNIE TUYET 504 SE 210TH ST Type Electrical Fixtures Qty Type Plumbing Fixtures City Mechanical Fixtures oty Receptacle, switches, lights 2 Gas System (outlets) 1 Water Heater 2 The permit shall expire by limitation and become null and void if the building or work has not passed final inspection 365 days from the date of permit issuance. A new permit is required to commence or continue work. y P�f,HEIM o�C City of Anaheim OF i0 Building DIVISIOn F i u > • �OVNDED � Do not occupy this building until the final inspections have been made. FINAL INSPECTIONS DATE INSPECTC All applicable items below must be signed before utilities are released Final Gas Test Electrical Final i L 2 y Plumbing Final Mechanical Final Cross Connection Control (714) 765.4280 Engineering Final (714) 765-5126 INSPECTION I DATE I INSPECTOR Fire Sprinkler (ONLY) (714) 765-5041 Do not pour concrete until the following applicable items have been signed. Fire Dept. Final (714) 7655041 Plumbing (Ground/Underfloor Drain Waste) Water Engineering (714) 765-4591 Electrical Ground Electrode/Ufer Sub List/Bus. Lic. (714) 765.5194 (Allow 10 business days) Setback/Forms/Trenches (Footings) COA/Migation Measures Do not install subfloor or pour Floor slab until the follwing applicable items have been signed : Building Final (714 765-5163) last Inspection -Final Only After Above Completed Plumbing (Ground/Underfloor Water) Underfloor Rough Gas PARTIAL INSPECTIONS Building Inspections Mechanical (Groundwork) Electrical (Underground Conduit) Pre -slab (Compaction/Membrane Reinf.) Floor (Joist/Girders) Underfloor Insulation (Raised Foundation Only) Floor Nailing (Raised Foundation Only) 2nd Floor (Floor Nailing) Do not cover or conceal the work below until the following applicable items have been sianed list Floor Shear Firesprinkler (Rough) (Fire Dept.) Mechanical Inspections 2nd Floor Shear Roof (Sheathing/Diaphragm/Frame) Masonry (Reinf./Bond BeamlPre-Grout) Rough Plumbing (Top Out) Rough Duct (Mechanical) Rough Mechanical Rough Electrical Rough COA/Mitagation Measures Plumbing Inspections Framing (Only after Plbg., Ele., Mee & Fire) Insulation (Sound/Energy) Do not tape or plaster until the following applicable items have been signed. Drywall Drywall Penetrations (Ele, Mec & Plbg) Interior Lath Exterior Lath Electrical Inspections Electrical Service Meter -(Meter will be set within 2-3 business days after approval) Excludes New Exterior Plaster (Brown Coat) T-Bar (Struct., Ele., or Mec.) Grease Interceptor Sewer Water Engineering Backflow (Testable Only) Water Service