Loading...
777 W KATELLA AVE 430 (4)Permit Types BLD EL X MEC PLE M Permit Number: OLD2024.00055 Issued: 02/29/2024 CITY OF ANAHEIM BUILDING DIVISION 200 S. ANAHEIM BLVD. (714) 765 - 5153 www.anaheim. neVbuilding (714)765-4626 Quarter Section: 76 Site Address: 777 W KATELLA AVE 430, Anaheim, CA 92802 Legal Description: S TWP 4 RGE 10 SEC 22 T4 R10 SEC 22 POR OF W 112 APN: 08219027 Project Description: DCA - Little MermaidBLOG #430 - Tenant Improvement: Remodel exterior queue. Install new 6'10" shade umbrella with footing. Electrical for new exterior equipment. Living Area: Number of Stories: 0 Valuation: 525.000.00 Garage Area: Construction Types: N/A Carport Area: Occupancy Groups; Balcony / Deck Area: Fire Sprinklered: Cool Roof Total Fees paid for Permit: 1,995.00 People Associated with Project Permit Applicant David Estrada 700 W Ball Rd Anaheim, CA 92868 Owner WALT DISNEY PARKS AND RESORTS US INC PO BOX 313 Architect Dana Charles Aiken PO BOX 134 Silverado, CA 92676 Engineer KENNETH E AGEE 3452 E FOOTHILL 626-432-5850200101171447134090 PASADENA, CA 91107 Architect MICHAEL K SULLIVAN 180 E MAIN STREET201507061008142440 TUSTIN, CA92780 Engineer - Electrical RYAN RUSTIN 2361 ROSECRANS AVE STE 368 EL SEGUNDO, CA 90245 Type Electrical Fixtures Qty Type Plumbing Fixtures Qty Mechanical Fixtures Cry The permit shall expire by limitation and become null and void if the building or work has not passed final inspection 365 days from the date of permit issuance. A new permit Is required to commence or continue work. �Py1EtAt Cq Cityof Anaheim D� P CEO Building Division F z • �DVNDED t8�1 Do not occupy this building until the final inspections have been made. FINAL INSPECTIONS DATE INSPECTOR All applicable items below must be signed before utilities are released Final Gas Test Electrical Final Plumbing Final Mechanical Final Cross Connection Control (714) 765-4280 Engineering Final (714) 765-5126 INSPECTION I DATE I INSPECTOR Fire Sprinkler (ONLY) (714) 765-5041 Do not pour concrete until the following applicable items have been signed: Fire Dept. Final (714) 765-5041 Plumbing (Ground/Underfloor Drain Waste) Water Engineering 1714) 765-4591 Electrical Ground Electrode/Ufer Sub List/Bus. Lic. (714) 765-5194 (Allow 10 business days) Setback/Forms/Trenches (Footings) COA/Migation Measures Do not install sub0oor or pour Floor slab until the tollwing applicable items ve been sioned Building Final (714765-5153);a/ Last Inspection -Final Only After Above Completed 1 zq Plumbing (Ground/Underfloor Water) Underfloor Rough Gas PARTIAL INSPECTIONS uilding Inspections Mechanical (Groundwork) Electrical (Underground Conduit) Pre -slab (Compaction/Membrane Reinf.) •% x Floor (JoisUGirders) Underfloor Insulation (Raised Foundation Only) Floor Nailing (Raised Foundation Only) 2nd Floor (Floor Nailing) Do not cover or conceal the work below until the following applicable items have been gioned 1st Floor Shear Firesprinkler (Rough) (Fire Dept.) Mechanical Inspections 2nd Floor Shear Roof (Sheathing/Diaphragm/Frame) Masonry (Reinf./Bond Beam/Pre-Grout) Rough Plumbing (Top Out) Rough Duct (Mechanical) Rough Mechanical Rough Electrical Rough COA/Mitagation Measures Plumbing Inspections Framing (Only after Flog Ele.. Mec. 8 Fire) Insulation (Sound/Energy) Do not tape or plaster until the following applicable items have been signed Drywall Drywall Penetrations (Ele, Mec & Plbg) Interior Lath Exterior Lath Electrical Inspections Electrical Service Meter -(Meter will be set within 2-3 business days after approval) Excludes New Exterior Plaster (Brown Coat) T-Bar (Struct., Ele., or Mec.) Grease Interceptor Sewer Water Engineering Backflow (Testable Only) Water Service