101 N MANCHESTER AVE (3)Permit Types
BLD ELE MEC PLM
X
Permit Number: BLD2024-06529
Issued: 12/16/2024
www.anaheim.net/building
(714)765.4626
Quarter Section: 63
CdkVigo] a_ kiF-MI:4IT,
BUILDING DIVISION
200 S. ANAHEIM BLVD.
(714) 765 -5153
Site Address: 101 N MANCHESTER AVE, Anaheim, CA 92802
Legal Description: A TR ANAHEIM EXT BLK LOT 34 ANAHEIM EXTENSION LOT
- - -
APN:25012211
Project Description: Residential Remodel: Changeout (3) windows REF:INV2024-00484
Living Area: Number of Stories:
1 Valuation: 16,000.00
Garage Area:
Construction Types: NIA
Carport Area:
Occupancy Groups:
Balcony I Deck Area:
Fire Sprinklered:
Cool Roof:
Total Foes paid for Permit: 177.00
People Associated with Project:
Permit Applicant Bahaeddin Hassan
Owner SUSTAINABILITY VENTURES LLC 3377 JUDILEE DR
Type Electrical Fixtures Qty Type Plumbing Fixtures Qty Mechanical Fixtures Qty
The permit shall expire by limitation and become null and void if the building or work has not passed final inspection 365 days from the
date of permit issuance. A new permit is required to commence or continue work.
PNPNEtM Oq`
Cityof Anaheim OF iO
Building Division fit i
u '
��(iA'DEp v8h^
Do not occupy this building until the final inspections have been made.
FINAL INSPECTIONS
DATE
INSPECTOR
All applicable items below must be signed before utilities are released
Final Gas Test
Electrical Final
Plumbing Final
Mechanical Final
Cross Connection Control (714) 765-4280
Engineering Final (714) 765-5126
INSPECTION I
DATE I
INSPECTOR
Fire Sprinkler (ONLY) (714) 765-5041
Do not pour concrete until the following applicable items have been signed.
Fire Dept. Final (714) 7664041
Plumbing (Ground/Underfloor Drain Waste)
Water Engineering (714) 765-4591
Electrical Ground ElectrodelUfer
Sub LISVBus. Lic. (714) 7655194 (Allow 10 business days)
Setback/Forms/Trenches (Footings)
COA/Migation Measures
Do not install subfloor or pour floor slab until the follwing applicable items have been
i
Building Final (714 765-5153)
Last Inspection -Final Only After Above Completed
_
tr
Plumbing (GroundlUnderfloor Water)
Underfloor Rough Gas
PARTIAL INSPECTIONS
Building Inspections
Mechanical (Groundwork)
Electrical (Underground Conduit)
Pre -slab (Compaction/Membrane Reinf.)
Floor (Joist/Girdem)
Underfloor Insulation (Raised Foundation Only)
Floor Nailing (Raised Foundation Only)
2nd Floor (Floor Nailing)
Do not cover or conceal the work below until the following applicable items have
been sianed
1st Floor Shear
Firesprinkler (Rough) (Fire Dept.)
Mechanical Inspections
2nd Floor Shear
Roof (Sheathing/Diaphragm/Frame)
Masonry (Reinf./Bond Beam/Pre-Grout)
Rough Plumbing (Top Out)
Rough Duct (Mechanical)
Rough Mechanical
Rough Electrical
Rough COA/Mitagation Measures
Plumbing Inspections
Framing (Only after Plbg., Ele., Mec & Fire)
Insulation (Sound/Energy)
Do not tape or plaster until the following applicable items have been signed.
Drywall
Drywall Penetrations (Ele, Mec & Plbg)
Interior Lath
Exterior Lath
Electrical Inspections
Electrical Service Meter -(Meter will be set within 23
business days after approval) Excludes New
Construction
Exterior Plaster (Brown Coat)
T-Bar (Struct., Ele., or Mec.)
Grease Interceptor
Sewer
Water Engineering Backflow (Testable Only)
Water Service