Loading...
501 S SAN VICENTE LNPermit Types BLD ELE MEC PLM X Permit Number: BLD2025-00074 Issued: 01/07/2025 www.anaheim.net/bu ilding (714)765-4626 Quarter Section: 198 CITY OF ANAHEIM Site Address: 501 S SAN VICENTE LN ANAHEIM, CA 92807 Legal Description: N TR 14353 BLK LOT 4 UN HOLD APN: 35618131 BUILDING DIVISION 200 S. ANAHEIM BLVD. (714) 765. 5153 Project Description: Electrical: To install residential EV charger inside the garage Living Area: Garage Area: Carport Area: Balcony/ Deck Area: Cool Roof: Number of Stones: 0 Valuation: 0.00 Conseucton Types: N/A Occupancy Groups: Fire Spnnklemd: Total Fees paid for Permll: 177.00 People Associated with Project: Contractor RICHARD RIZZO ELECTRIC INC 13628 E WHITETHORN DR202007231153563970 SCOTTSDALE, AZ 92646 Permit Applicant Austen Coburn Owner HOLD PARCEL Type Electrical Fixtures Cry Type Plumbing Fixtures City Mechanical Fixtures Oily EV Charger 1 The permit shall expire by limitation and become null and void if the building or work has not passed final inspection 365 days from the date of permit issuance. A new permit Is required to commence or continue work. PHr,NEIM cqC Cityof Anaheim p� io Building Division _F i u > - �OVNOEO fah^ Do not occupy this building until the final inspections have been made. FINAL INSPECTIONS DATE INSPECTOR All applicable items below must be signed before utilities are released Final Gas Test Electrical Final IA 6✓ Sf Plumbing Final Mechanical Final Cross Connection Control (714) 765-4280 Engineering Final (714) 765-5126 INSPECTION I DATE I INSPECTOR Fire Sprinkler (ONLY) (714) 765.6041 Do not pour concrete until the following applicable items have been signed: Fire Dept. Final (714) 765-5041 Plumbing (Ground/Underfloor Drain Waste) Water Engineering (714) 765-4591 Electrical Ground ElectrodelUfer Sub List/Bus. Lic. (714) 765-5194 (Allow 10 business days) Setback/Forms/Trenches (Footings) COA/Migation Measures Do not install subfloor or pour Boor slab until the follwing applicable items have been Building Final (714 7655753) Last Inspectlon-Final Only After Above Completed Plumbing (Ground/Underfloor Water) Underfloor Rough Gas PARTIAL INSPECTIONS Building Inspections Mechanical (Groundwork) Electrical (Underground Conduit) Pre -slab (Compaction/Membrane Reinf.) Floor (Joist/Girders) Underfloor Insulation (Raised Foundation Only) Floor Nailing (Raised Foundation Only) 2nd Floor (Floor Nailing) Do not cover or conceal the work below until the following applicable items have been siane& 1st Floor Shear Firesprinkler(Rough) (Fire Dept.) Mechanical Inspections 2nd Floor Shear Roof (Sheathing/Diaphragm/Frame) Masonry (Reinf./Bond Beam/Pre-Grout) Rough Plumbing (Top Out) Rough Duct (Mechanical) Rough Mechanical Rough Electrical Rough COA/Mitagation Measures Plumbing Inspections Framing (Only after Plbg.. Ele., Mec. & Firei Insulation (Sound/Energy) Do not tape or plaster unfit the following applicable items h" Drywall Drywall Penetrations (Ele, Mec & Plbg) Interior Lath Exterior Lath Electrical Inspections Electrical Service Meter -(Meter will be set within 2-3 business days after approval) Excludes New nnngrijgtinn Exterior Plaster (Brown Coat) T-Bar (Struct., Ele., or Mec.) Grease Interceptor (no hnrjkf 11 unless ginned off) rot Sewer Water Engineering Backflow (Testable Only) Water Service