Loading...
507 N PLANTATION PL (8)Permit Types BLD ELE MEC PLM X X X X Permit Number: BLD2024-00832 Issued: 10/11/2024 www.anaheim.net/building (714)765-4626 Quarter Section: 122 CITY OF ANAHEIM BUILDING DIVISION 200 S. ANAHEIM BLVD. (714) 765 - 5153 Site Address: 507 N PLANTATION PL, ANAHEIM, CA 92806 Legal Description: N TR 3614 BILK LOT 60 APN: 26830224 Project Description: Residential Remodel: 98 sq. ft. to convert closet into bathroom number 3. Living Area: Number of Stones: 1 Valuation: 30,000.00 Garage Area: Construction Types: VB Carport Area: Occupancy Groups: Balcony I Deck Area: Fire Sprinklered: Cool Roof: Total Fees paid for parrot: 938.90 People Associated with Project: Contractor LT BUILDER INC 11131 FLOWER AVE FOUNTAIN VALLEY, CA Permit Applicant LAM TRAN 11131 FLOWER AVE FOUNTAIN VALLEY, CA 92708 Owner TU SON 507 N PLANTATION PL. Type Electrical Fixtures Oty Type Plumbing Fixtures Cry Mechanical Fixtures Oty Receptacle, switches, lights 6 Lavatory 2 Ventilation Fan - <= 300 cfm on�singie duct 1 Repair/Drainage AlterationfVent Piping 1 \� Shower 1 Water Closet Water Distribution The permit shall expire by limitation and become null and void if the building or work has not passed final inspection 365 days from the dale of permit Issuance. A new permit is required to commence or continue work. PNPHEIM �'` Cityof Anaheim OA iO Building Division i u ' OONDED v$y^ Do not occupy this building until the final inspections have been made. FINAL INSPECTIONS DATE INSPECTOR All applicable items below must be signed before utilities are released Final Gas Test Electrical Final Plumbing Final Mechanical Final Cross Connection Control (714) 765-4280 Engineering Final (714) 765-5126 INSPECTION I DATE I INSPECTOR Fire Sprinkler (ONLY) (714) 765.5041 Do not pour concrete until the following applicable items have been signed: Fire Dept. Final (714) 765-6041 Plumbing (GroundlUnder0oor Drain Waste) I It j LA j,)A . Water Engineering (714) 765-4691 Electrical Ground ElectrodelUfer Sub List/Bus. Lic. (714) 765-5194 (Allow 10 business days) Setback/Forms/Trenches (Footings) COAIMigation Measures Do not install subftoor or pour Floor slab until the follwing applicable items have beensianed Building Final (714 765-5153) Last Inspection -Final Only After Above Completed t Plumbing (Ground/Underfloor Water) Underfloor Rough Gas PARTIAL INSPECTIONS Building Inspections Mechanical (Groundwork) Electrical (Underground Conduit) Pre -slab (Compaction/Membrane Reinf.) Floor (JoistlGirders) Underfoor Insulation (Raised Foundation Only) Floor Nailing (Raised Foundation Only) 2nd Floor (Floor Nailing) Do not cover or conceal the work below until the following applicable items have been sianed let Floor Shear Firesprinkler (Rough) (Fire Dept.) Mechanical Inspections 2nd Floor Shear Roof (Sheathing/Diaphragm/Frame) Masonry (Reinf.lBond Beam/Pre-Grout) Rough Plumbing (Top Out) r Rough Duct (Mechanical) Rough Mechanical t •L Rough Electrical tit Rough COAIMitagation Measures Plumbing Inspections �--f Framing (Only after Plbg., Ele., Mec. & Fire) Insulation (Sound/Energy) Do not tape or plaster until the following applicable items have been signed: Drywall Drywall Penetrations (Ele, Mec & Plbg) Interior Lath (r Exterior Lath Electrical Inspections Electrical Service Meter -(Meter will be set within 2-3 business days after approval) Excludes New Exterior Plaster (Brown Coat) T-Bar (Struct., Ele., or Mee.) Grease Interceptor Sewer Water Engineering Back0ow (Testable Only) Water Service �V�