777 W KATELLA AVE (126)Permit Types
BLD ELE MEC PLM
X
Permit Number: BLD2024-06572
Issued: 12127/2024
www.anaheim.net/building
(714)765-4626
Quarter Section: 76
CITY OF ANAHEIM
BUILDING DIVISION
200 S. ANAHEIM BLVD.
(714) 765 - 5153
Site Address: 777 W KATELLA AVE 430, Anaheim, CA 92802
Legal Description: S TWP 4 RGE 10 SEC 22 T4 R10 SEC 22 POR OF W 1/2
APN:08219027 sh.
Project Description: DCA - Little Mermaid - Lunar New Year'25 - Miscellaneous: Install pre-fab pergola and truss arch. (01/08125 thru
02/18/25)
Living Area: Number of Stones: 0 Valuation: 25,000.00
Garage Area: Construction Types: WA
Carport Area: Occupancy Groups:
Balcony Deck Area: Fire Sprinklered:
Cool Roof: Total Fees paid for permit: 990.00
People Associated with Project:
Owner WALT DISNEY PARKS AND RESORTS US INC PO BOX 313
Engineer KENNETH E AGEE 3452 E FOOTHILL 626-432-5850200101171447134090 PASADENA, CA 91107
Type Electrical Fixtures Oty Type Plumbing Fixtures pry Mechanical Fixtures City
The permit shall expire by limitation and become null and void if the building or work has not passed final inspection 365 days from the
date of permit issuance. A new permit is required to commence or continue work.
/'a /t P�I,NEIM rqt
Cityof Anaheim O� io
Building Division i
V >
�p�Noep 8h,
Do not occupy this building until the final inspections have been made.
FINAL INSPECTIONS
DATE
INSPECTOR
All applicable Items below must be signed before utilities are released
Final Gas Test
Electrical Final
Plumbing Final
Mechanical Final
Cross Connection Control (714) 765-41280
Engineering Final (714) 76 -5126
INSPECTION
I DATE
JINSPECTOR
Fire Sprinkler (ONLY) (714) 766.5041
Do not pour concrete unfit the following applicable Hems have been signed:
Fire Dept Final (714) 765-6041
Plumbing (Ground/Underfloor Drain Waste)
Water Engineering (714) 765-4591
Electrical Ground Electrode/Ufer
Sub List/Bus. Lic. (714) 765-5194 (Allow 10 business days)
Setback/Forms/Trenches (Footings)
COAIMigation Measures
Do not install subfloor or pour floor slab until the follmng applicable Hems have been
sioned
Building Final (714 765.5163)
Last Inspection -Final Only After Abate Completed
Plumbing (Ground/Underfloor Water)
Underfloor Rough Gas
PARTIAL INSPECTIONS
Building Inspections
Mechanical (Groundwork)
Electrical (Underground Conduit)
Pre -slab (Compaction/Membrane Reinf.)
Floor (Joist/Girders)
Underfloor Insulation (Raised Foundation Only)
Floor Nailing (Raised Foundation Only)
2nd Floor (Floor Nailing)
Do not cover or conoaal the work below until the following applicable Hems have
been sioned
Iat Floor Shear
Firesprinkler (Rough) (Fire Dept.)
Mechanical Inspections
2nd Floor Shear
Roof (Sheathing/Diaphragm/Frame)
Masonry (Reinf./Bond Beam/Pre-Grout)
Rough Plumbing (Top Out)
Rough Duct (Mechanical)
Rough Mechanical
Rough Electrical
Rough COA/Mitagation Measures
Plumbing Inspections
Framing (Only after Plbg., Ele., Mac. 8 Fire)
Insulation (Sound/Energy)
Do not tape or plaster until the following applicable Hems have been signed:
Drywall
Drywall Penetrations (Ele, Mec & Plbg)
Interior Lath
Exterior Lath
Electrical Inspections
Electrical Service Meter -(Meter will be set within 2-3
business days after approval) Excludes New
Exterior Plaster (Brown Coat)
T-Bar (Struct., Ele., or Mec.)
Grease Interceptor
(Do not backfill -oned off)
unless
Sewer
Water Engineering Backflow (Testable Only)
Water Service
' W H E E L E R & G R A Y, I N C
CONSULTING ENGINEERS
Field Observation Report
SGN2024-00150
DATE: January 15, 2025
SUBJECT: Lunar New Year Signage 2025
Disneyland Resort
1616 S. Disneyland Drive
Anaheim, CA 92802
FROM: Ken Agee
REMARKS:
Phone #: (626) 893-4672
A structural observation was on performed on January 15, 2025 at the project site in order
to review the installation of the temporary sign overlay at the Disneyland Resort installed for
the Lunar New Year 2025 event. Here are the comments in regards to the construction:
1. The installation is constructed and installed in accordance with the approved design
drawings.
H HARBOR BLVD., SUITE 1010 • ANAHEIM • CALIFORNIA • 92805 • (714) 937-9100
aqW H E E L E R & G R A Y, I N C
CONSULTING ENGINEERS
Field Observation Report
BLD2024-06572
DATE: January 15, 2025
SUBJECT: Lunar New Year Temporary Structures 2025
Disneyland Resort
777 W. Katella Avenue
Anaheim, CA 92802
FROM: Ken Agee Phone #: (626) 893-4672
REMARKS:
A structural observation was on performed on January 15, 2025 at the project site in order
to review the installation of the temporary structures at the Disneyland Resort installed for
the Lunar New Year 2025 event. Here are the comments in regards to the construction:
1. The installation is constructed and installed in accordance with the approved design
drawings which includes one pergola and one arch structure.
300 SOUTH HARBOR BLVD., SUITE 1010 • ANAHEIM • CALIFORNIA • 92805 • (714) 937-9100