Loading...
391 S SUNKIST STPermit Types BLD ELF MEC PLM X Permit Number: BLD2025-00232 Issued: 01/15/2025 www. a n a h ei m. n e t/b u i I d i n g (714)765-4626 Quarter -Section 113 CITY OF ANAHEIM BUILDING DIVISION 200 S. ANAHEIM BLVD. (7141 765 - 5153 Site Address: 391 S SUNKIST ST 3ANAHEIM, CA 92806 Legal Description: P BK 150 PG 48 PAR 1 P.M. 160-48 PAR. 1 AND POR OF APN: 08373118 Project Description: Residential EV Charger Living Area. Garage Area. Carport Area: Balcony / Deck Area: Cool Roof. Number of Stories: 1 Valuation: 0.00 Construction Types: WA Occupancy Groups: Fve Sprinklered. Total Fees paid for Permit: 177.00 People Associated with Project: Contractor LIGHTING &AMP: MORE LLC DBA LIGHTING & 426 E ROSEWOOD ST RIALTO, CA Permit Applicant Hector EHernandez Owner KB HOME COASTAL INC 36310 INLAND VALLEY DR #300 Type Electrical Fixtures Qly Type Plumbing Fixtures Qty Mechanical Fixtures City EV Charger 1 The permit shall expire by limitation and become null and void if the building or work has not passed final inspection 365 days from the date of permit issuance. A new permit is required to commence or continue work. -PNEIM ., �PCN� —VHS. City of Anaheim o !o Building Division >: �--- QED . Do not occupy this building until the final inspections have been made. FINAL INSPECTIONS DATE INSPECTOR All applicable items below must be signed before utilities are released Final Gas Test Electrical Final Plumbing Final Mechanical Final Cross Connection Control (714) 765.4280 Engineering Final (714) 765-5126 INSPECTION I DATE I INSPECTOR Fire Sprinkler (ONLY) (714) 765-5041 Do not pour concrete until the following applicable items have been signed Fire Dept. Final (714) 765-5041 Plumbing (Ground/Underfloor Drain Waste) Water Engineering (714) 765-4591 Electrical Ground Electrode/Ufer Sub List/Bus. Lic. (714) 765-5194 (Allow 10 business days) Setback/Forms/Trenches (Footings) COA/Migation Measures Do not install subfloci or pour floor slab until the follwing applicable items have been signed. Building Final (714 765-5153) Last Inspection -Final Only After Above Completed Plumbing (Ground/Underfloor Water) Underfloor Rough Gas PARTIAL INSPECTIONS Building Inspections Mechanical (Groundwork) Electrical (Underground Conduit) Pre -slab (Compaction/Membrane Reinli Floor (JoisVGirders) Underfloor Insulation (Raised Foundation Only) Floor Nailing (Raised Foundation Only) 2nd Floor (Floor Nailing) Do not cover or cenr:eal the work below until the following applicable items have noon ioned list Floor Shear Firesprinkler (Rough) (Fire Dept.) Mechanical Inspections 2nd Floor Shear Roof (Sheathing/Diaphragm/Frame) Masonry (Reinf./Bond Beam/Pre-Grout) Rough Plumbing (Top Out) Rough Duct (Mechanical) Rough Mechanical Rough Electrical Rough COArMitagation Measures Plumbing Inspections Framing Only after Fibg. Ele_ Mec. & Fire) Insulation (Sound/Energy) Do not tape or plaster until the folic,ng applicable items have been signed. Drywall Drywall Penetrations (Ele, Mec & Plbg) Interior Lath Exterior Lath Electrical Inspections Electrical Service Motor -(Meter will be set within 2-3 business Jays after approvah Excludes New rrinctriintinn Exterior Plaster (Brown Coat) T-Bar (Struct., Ele., or Mec.) Grease Interceptor fQr, nut hankfill unless signed off) Sewer Water Engineering Backflow (Testable Only) Water Service