Permit Number: BLD2023-01591
200 S. ANAHEIM BLVD. -
t
Issued: 08/02/2023
(714)765.5153
www.anahei m. neUbuil d ing
(714)765-4626
Quarter Section: 74
Site Address: 951 S CITRON ST, ANAHEIM, CA 92805
Legal Description: N TR 10954 BILK LOT 1 UN 5 TR 10954
LOT 1 UNIT 5 OF -
APN:93823005
Project Description: Repair: Replace damaged framing and
shear walls at units 951 and 953, 136 sq ft to replace damaged balcony
framing at unit 953, replace east side fire escape and stairs
Living Area: Number of Stones: 2 Valuation:
40.000.00
Garage Area:
Construction Types:
VA
Carport Area:
Occupancy Groups:
Balcony I Deck Area:
Fire Spdnklered:
No
Cool Roof:
Total Fees paid for Parmh:
2,614.20
People Associated with Project:
Permit Applicant Rod Bassett
Owner SAFEHAVEN LLC
360 E 1ST ST
Contractor BASSETT BUILDING
30914 LONG POINT DRIVE CANYON LAKE, CA
Engineer - Civil STEVEN C HELFRICH
30640 KRISTIN COURT REDLANDS, CA 92373
Architect/Engineer JON G STROMFOUIST
MISSION VIEJO, CA 92692
Type Electrical Fixtures Oty Type Plumbing Fixtures City Mechanical Fixtures City
The permit shall expire by limitation and become null and void if the building or work has not passed final inspection 365 days from the
date of permit issuance. A new permit is required to commence or continue work.
aPttEI&f �
City of Anaheim O4T 4.
Building Division ti y
u >
• �OVNDEp ts�1
Do not occupy this building until the final inspections have been made.
FINAL INSPECTIONS
DATE
INSPECTOR
All applicable items below must be signed before utilities are released
Final Gas Test
Electrical Final
Plumbing Final
Mechanical Final
Cross Connection Control (714) 765-0280
Engineering Final (714) 765-5126
INSPECTION I
DATE
I INSPECTOR
Fire Sprinkler (ONLY) (714) 765-5041
Do not pour concrete until the following applicable items have been signed
Fire Dept. Final (714) 765-5041
Plumbing (Ground/Underfloor Drain Waste)
Water Engineering (714) 765-4591
Electrical Ground Electrode/Ufer
Sub List/Bus. Lic. (714) 765-5194 (Allow 10 business days)
SetbacidForms/Trenches (Footings)
COA/Migation Measures
Do not install subfloor or pour Floor slab until the follwing app icable terrig ha a been
Building Final (714 765-5153)
Last Inspection -Final Only After Above Completed
Plumbing (Ground/Underfloor Water)
Underfloor Rough Gas
PARTIAL INSPECTIONS
Building Inspections
Mechanical (Groundwork)
Electrical (Underground Conduit)
Pre -slab (CompactionlMembrane Reinf.)
Floor (Joist/Girders)
Underfloor Insulation (Raised Foundation Only)
Floor Nailing (Raised Foundation Only)
2nd Floor (Floor Nailing)
Do not cover or conceal the work below until the following applicable items have
been sioned
1st Floor Shear
Firesprinkler (Rough) (Fire Dept.)
Mechanical Inspections
2nd Floor Shear
rrvs
Roof (Sheathing/Diaphragm/Frame)
Masonry (Reinf./Bond Beam/Pre-Grout)
Rough Plumbing (Top Out)
Rough Duct (Mechanical)
Rough Mechanical
Rough Electrical
Rough COA/Mitagation Measures
Plumbing Inspections
Framing (Only after Plbg.. Ele.. Mec. & Fire)
Insulation (Sound/Energy)
Do not tape or plaster until the following applicable items have been signed
Drywall
Drywall Penetrations (Ele, Mec & Plbg)
Interior Lath
Exterior Lath
Electrical Inspections
Electrical Service Meter -(Meter will be set within 2-3
business days after approval) Excludes New
Exterior Plaster (Brown Coat)
T-Bar (Struct., Ele., or Mec.)
Grease Interceptor
(no not hark1uh,nip�q �,oned aft)
Sewer
Water Engineering Backflow (Testable Only)
Water Service