Loading...
951 S CITRON ST (4)Permit Types CITY OF ANAHEIM BLD ELE ME c PLM X BUILDING DIVISION Permit Number: BLD2023-01591 200 S. ANAHEIM BLVD. - t Issued: 08/02/2023 (714)765.5153 www.anahei m. neUbuil d ing (714)765-4626 Quarter Section: 74 Site Address: 951 S CITRON ST, ANAHEIM, CA 92805 Legal Description: N TR 10954 BILK LOT 1 UN 5 TR 10954 LOT 1 UNIT 5 OF - APN:93823005 Project Description: Repair: Replace damaged framing and shear walls at units 951 and 953, 136 sq ft to replace damaged balcony framing at unit 953, replace east side fire escape and stairs Living Area: Number of Stones: 2 Valuation: 40.000.00 Garage Area: Construction Types: VA Carport Area: Occupancy Groups: Balcony I Deck Area: Fire Spdnklered: No Cool Roof: Total Fees paid for Parmh: 2,614.20 People Associated with Project: Permit Applicant Rod Bassett Owner SAFEHAVEN LLC 360 E 1ST ST Contractor BASSETT BUILDING 30914 LONG POINT DRIVE CANYON LAKE, CA Engineer - Civil STEVEN C HELFRICH 30640 KRISTIN COURT REDLANDS, CA 92373 Architect/Engineer JON G STROMFOUIST MISSION VIEJO, CA 92692 Type Electrical Fixtures Oty Type Plumbing Fixtures City Mechanical Fixtures City The permit shall expire by limitation and become null and void if the building or work has not passed final inspection 365 days from the date of permit issuance. A new permit is required to commence or continue work. aPttEI&f � City of Anaheim O4T 4. Building Division ti y u > • �OVNDEp ts�1 Do not occupy this building until the final inspections have been made. FINAL INSPECTIONS DATE INSPECTOR All applicable items below must be signed before utilities are released Final Gas Test Electrical Final Plumbing Final Mechanical Final Cross Connection Control (714) 765-0280 Engineering Final (714) 765-5126 INSPECTION I DATE I INSPECTOR Fire Sprinkler (ONLY) (714) 765-5041 Do not pour concrete until the following applicable items have been signed Fire Dept. Final (714) 765-5041 Plumbing (Ground/Underfloor Drain Waste) Water Engineering (714) 765-4591 Electrical Ground Electrode/Ufer Sub List/Bus. Lic. (714) 765-5194 (Allow 10 business days) SetbacidForms/Trenches (Footings) COA/Migation Measures Do not install subfloor or pour Floor slab until the follwing app icable terrig ha a been Building Final (714 765-5153) Last Inspection -Final Only After Above Completed Plumbing (Ground/Underfloor Water) Underfloor Rough Gas PARTIAL INSPECTIONS Building Inspections Mechanical (Groundwork) Electrical (Underground Conduit) Pre -slab (CompactionlMembrane Reinf.) Floor (Joist/Girders) Underfloor Insulation (Raised Foundation Only) Floor Nailing (Raised Foundation Only) 2nd Floor (Floor Nailing) Do not cover or conceal the work below until the following applicable items have been sioned 1st Floor Shear Firesprinkler (Rough) (Fire Dept.) Mechanical Inspections 2nd Floor Shear rrvs Roof (Sheathing/Diaphragm/Frame) Masonry (Reinf./Bond Beam/Pre-Grout) Rough Plumbing (Top Out) Rough Duct (Mechanical) Rough Mechanical Rough Electrical Rough COA/Mitagation Measures Plumbing Inspections Framing (Only after Plbg.. Ele.. Mec. & Fire) Insulation (Sound/Energy) Do not tape or plaster until the following applicable items have been signed Drywall Drywall Penetrations (Ele, Mec & Plbg) Interior Lath Exterior Lath Electrical Inspections Electrical Service Meter -(Meter will be set within 2-3 business days after approval) Excludes New Exterior Plaster (Brown Coat) T-Bar (Struct., Ele., or Mec.) Grease Interceptor (no not hark1uh,nip�q �,oned aft) Sewer Water Engineering Backflow (Testable Only) Water Service