Loading...
801 N LOARA ST 82-93Permit Types BLD ELE MEC PLM X Permit Number: BLD2024-06651 Issued: 12/23/2024 wvvw.anatheim.net/building (714)765-4626 Quarter Section: 52 CITY OF ANAHEIM BUILDING DIVISION 200 S. ANAHEIM BLVD. f7141 765 -5153 Site Address: 801 N LOARA ST 82-93, ANAHEIM, CA 92801 Legal Description: S TWP 4 RGE 10 SEC 9 SEC 9 T 4 R 10 NE1/4 SW114 NW APN: 03430057 Project Description: Reroof: Remove and install (80) so of built up capsheet (Units 82-92) Living Area: Garage Area: Carport Area: Balcony I Deck Area: Cool Roof: Number of Stones: i Valuation: 57,000.00 Construction Types: NIA Occupancy Groups: Fire Sprinklered: Total Fees paid for Pernik: 491.96 People Associated with Project: Contractor WEST COAST ROOFING 21600 ELTON LANE201510021133324962 NUEVO, CA 22567 Permit Applicant michael eugeneswenson Owner PORTOFINO COVE L P 2727 LBJ FREEWAY 806 Type Electrical Fixtures Qty Type Plumbing Fixtures Qty Mechanical Fixtures Qty The permit shall expire by limitation and become null and void if the building or work has not passed final inspection 365 days from the date of permit issuance. A new permit is required to commence or continue work. r HEIM Cityof Anaheim of Pin C�C' o Building Division ~2 �• - VNDED \b Do not occupy this building until the final inspections have been made. FINAL INSPECTIONS DATE INSPECTOR All applicable items below must be signed before utilities are released Final Gas Test Electrical Final Plumbing Final Mechanical Final Cross Connection Control (714) 765-4280 Engineering Final (714) 765-5126 INSPECTION I DATE INSPECTOR Fire Sprinkler (ONLY) (714) 765-5041 Do not pour concrete until the following applicable items have been signed. Fire Dept. Final (714) 765-5041 Plumbing (Ground/Underfloor Drain Waste) Water Engineering (714) 765-4591 Electrical Ground Electrode/Ufer Sub LisVBus. Lic. (714) 765-5194 (Allow 10 business days) Setback/Forms/Trenches (Footings) COA/Migation Measures/ Do not install subfloor or pour floor slab until the follwing applicable items have been n Building Final (714 765-5153) oo-Finsl Orgy After Above Copleted Last Inapecbm Plumbing (Ground/Underfloor Water) Underfloor Rough Gas PARTIAL INSPECTIONS Building Inspections Mechanical (Groundwork) Electrical (Underground Conduit) Pre -slab (Compaction/Membrane Reinf.) Floor (Joist/Girders) Underfloor Insulation (Raised Foundation Only) Floor Nailing (Raised Foundation Only) 2nd Floor (Floor Nailing) Do not cover or conceal the work mow until the following applicable items have been s" n 1st Floor Shear Firesprinkler (Rough) (Fire Dept.) Mechanical Inspections 2nd Floor Shear Roof (Sheathing/Diaphragm/Frame) Masonry (Reinf./Bond Beam/Pre-Grout) Rough Plumbing (Top Out) Rough Duct (Mechanical) Rough Mechanical Rough Electrical Rough COA/Mitagation Measures Plumbing Inspections Framing (Only after Plbg., Ele-, Mec. 8 Fire) Insulation (Sound/Energy) Do not tape or plaster until the following applicable items have been signed: Drywall Drywall Penetrations (Ele, Mac & Plbg) Interior Lath Exterior Lath Electrical Inspections Electrical Service Meter -(Meter will be set within 2-3 business days after approval) Excludes New Construction Exterior Plaster (Brown Coat) T-Bar (Struct., Ele., or Mec.) Grease Interceptor Sewer Water Engineering Backflow (Testable Only) Water Service