Loading...
543 W HAMPSHIRE AVEPermit Types BLD ELE MEC PLM X Permit Number: BLD2024-00825 Issued: 02116/2024 www.anaheim.net/building (714)765-4626 Quarter Section: 74 CITY OF ANAHEIM BUILDING DIVISION 200 S. ANAHEIM BLVD. (714) 765 -5153 Site Address: 543 W HAMPSHIRE AVE, Anaheim, CA 92805 Legal Description: N TR 1142 BILK LOT 19 APN: 25112134 Project Description: Residential Remodel: Remove and install (20) Windows Living Area: Number of Stories: 0 Valuation: 8,500,00 Garage Area: Construction Types: VB Carport Area: Occupancy Groups: Balcony / Deck Area: Fire Sprinklered: Cool Roof: Total Fees paid for Permit: 416.38 People Associated with Project: Permit Applicant Tom Tieu Owner Jennie Oanh Tieu Lee Howard Tr H Lee J O T 3925 Rio Hondo Ave Type Electrical Fixtures Qty Type Plumbing Fixtures Qty Mechanical Fixtures Qty The permit shall expire by limitation and become null and void If the building or work has not passed final Inspection 365 days from the date of permit Issuance. A new permit is required to commence or continue work. PNPHEIM off( Cityof Anaheim 04 iO Building Division F i • �DVNDEV fay^ Do not occupy this building until the final inspections have been made. FINAL INSPECTIONS DATE INSPECTOR All applicable items below must be signed before utilities are released Final Gas Test Electrical Final Plumbing Final Mechanical Final Cross Connection Control (714) 765-4280 Engineering Final (714) 765-5126 INSPECTION I DATE I INSPECTOR Fire Sprinkler (ONLY) (714) 765-5041 Do not pour concrele until the following applicable items have been signed. Fire Dept. Final (714) 765-5041 Plumbing (Ground/Underfloor Drain Waste) Water Engineering (714) 765-4591 Electrical Ground Electrode/Ufer Sub List/Bus. Lic. (714) 765-5194 (Allow 10 business days) Setback/Forms/Trenches (Footings) COA/Migation Measures Do not install subfloor or pour floor slab until the follwing applicable items have beensio ned Building Final (714 765-5153) Last Inspection -Final Only After Above Completed t Z Plumbing (Ground/Underfloor Water) Underfloor Rough Gas PARTIAL INSPECTIONS Building Inspections Mechanical (Groundwork) Electrical (Underground Conduit) Pre -slab (Compaction/Membrane Reinf.) Floor (Joist/Girders) Underfloor Insulation (Raised Foundation Only) Floor Nailing (Raised Foundation Only) 2nd Floor (Floor Nailing) Do not cover or conceal the work below until the following applicable items have been sinned 1st Floor Shear Firesprinkler (Rough) (Fire Dept.) Mechanical Inspections 2nd Floor Shear Roof (Sheathing/Diaphragm/Frame) Masonry (Reinf./Bond Beam/Pre-Grout) Rough Plumbing (Top Out) Rough Duct (Mechanical) Rough Mechanical Rough Electrical Rough COA/Mitagation Measures Plumbing Inspections Framing (Only after Plbg Ele Mec & Fire) Insulation (Sound/Energy) Do not tape or plaster until the following applicable items have been signeo Drywall Drywall Penetrations (Ele, Mec & Ping) Interior Lath Exterior Lath Electrical Inspections Electrical Service Meter -(Meter will be set within 2-3 business days after approval) Excludes New Exterior Plaster (Brown Coat) T-Bar (Struct., Ele., or Mec.) Grease Interceptor Sewer Water Engineering Backflow (Testable Only) Water Service