290 S SOLOMON DRPermit Types
BLD
ELE
MEC
PLM
X
X
X
X
Permit Number: BLD2024.02730
Issued: 05/29/2024
www.anaheim.net/building
(714)765-4626
Quarter Section: 192
Site Address: 290 S SOLOMON DR, Anaheim, CA 92807
Legal Description: N TR 8679 BLK LOT 44
APN: 36319208
yIWAIS] W_11241_171�11�j1
BUILDING DIVISION
200 S. ANAHEIM BLVD.
(714) 765. 5153
Project Description: Residential Remodel: 2 bathroom remodels, remove and replace 2 showers and 1 bathtub with tile surround.
Plumbing, electrical, and mechanical fixtures
Living Area: Number of Stones: 0 Valuation:
Garage Area: Construction Types:
CarportArea: Occupancy Groups:
Balcony I Deck Area: Fire Spnnklered:
Cool Roof: Total Fees paid for ParmH:
40,000,00
VB
838.20
People Associated with Project:
Contractor IRAJ PARSA 24602 SELVA ROAD A DANA POINT, CA 92629
Permit Applicant Iraj Pam
Owner KENNEDY, JOHN A 8 BETTY J 290 S SOLOMON DR
Type Electrical Fixtures Oty Type Plumbing Fixtures City Mechanical Fixtures Oty
Receptacle, switches, lights 18 Bath Tub 1 Ventilation Fan - <= 300 cfm on single duct 3
Shower
E
The permit shall expire by limitation and become null and void If the building or work has not passed final inspection 365 days from the
date of permit issuance. A new permit is required to commence or continue work.
I'll C,
Cityof Anaheim OF P CEO
Building Division F i
- �OVNDEO tehn
Do not occupy this building until the final inspections have been made.
FINAL INSPECTIONS
DATE
INSPECTOR
All applicable items below must be signed before utilities are released
Final Gas Test
Electrical Final
1�jh
Plumbing Final
Li
/
Mechanical Final
3(
/
Cross Connection Control (714) 765.4280
Engineering Final (714) 765-5126
INSPECTION I
DATE
I INSPECTOR
Fire Sprinkler (ONLY) (714) 765-5041
Do not pour concrete until the following applicable items have been signed
Fire Dept. Final (714) 765.5041
Plumbing (Ground/Underfloor Drain Waste)
Water Engineering (714) 765.4591
Electrical Ground Electrode/i
Sub List/Bus. Lic. (714) 765-5194 (Allow 10 business days)
SetbacklFormslTrenches (Footings)
COAIMigation Measures
Do not install subfloor or pour floor slab until the follwing applicable items have been
sioned
Building Final (714 765.5153)
Last Inspection -Final Only After Above Completed
,
Plumbing (Ground/Underfloor Water)
Underfloor Rough Gas
PARTIAL INSPECTIONS
Build' n I`ns facctions (� �/ \ (1
zi IC. i �.5 Y—c� Li l�
Mechanical (Groundwork)
Electrical (Underground Conduit)
Pre -slab (CompactionlMembrane Reinf.)
Floor (Joist/Girders)
✓�
Underfloor Insulation (Raised Foundation Only)
Floor Nailing (Raised Foundation Only)
2nd Floor (Floor Nailing)
Do not cover or c:. _ .- :. ork below until the fol roplicable items have
been sicned
1st Floor Shear
Firesprinkler (Rough) (Fire Dept.)
Mechanical Inspections
2nd Floor Shear
Roof (Sheathing/Diaphragm/Frame)
Masonry (Reinf.IBond Beam/Pre-Grout)
Rough Plumbing (Top Out)
•i-
twr �Y -
Rough Duct (Mechanical)
Rough Mechanical
Z
Rough Electrical
19141
Rough COAIMitagation Measures
Plumbina Inspections
'JD
h
Framing (Only after Plbg_ Ele.. Mec. 8 Fire) (I Zi
2yVr
Insulation (Sound/Energy)6k
Ld A Kick
Do not tape or plaster until the following applicable items have been signed :
it
Drywall
Drywall Penetrations (Ele, Mec & Plbg)
Interior Lath
Exterior Lath
Electrical Inspections
Electrical Service Meter -(Meter w1l be set within 2.3
business days after approval) Excludes New
Construction
Exterior Plaster (Brown Coat)
T-Bar (Struct., Ele., or Mec.)
Grease Interceptor
(Do not bai unless
Sewer
Water Engineering Backflow (Testable Only)
Water Service