Loading...
290 S SOLOMON DRPermit Types BLD ELE MEC PLM X X X X Permit Number: BLD2024.02730 Issued: 05/29/2024 www.anaheim.net/building (714)765-4626 Quarter Section: 192 Site Address: 290 S SOLOMON DR, Anaheim, CA 92807 Legal Description: N TR 8679 BLK LOT 44 APN: 36319208 yIWAIS] W_11241_171�11�j1 BUILDING DIVISION 200 S. ANAHEIM BLVD. (714) 765. 5153 Project Description: Residential Remodel: 2 bathroom remodels, remove and replace 2 showers and 1 bathtub with tile surround. Plumbing, electrical, and mechanical fixtures Living Area: Number of Stones: 0 Valuation: Garage Area: Construction Types: CarportArea: Occupancy Groups: Balcony I Deck Area: Fire Spnnklered: Cool Roof: Total Fees paid for ParmH: 40,000,00 VB 838.20 People Associated with Project: Contractor IRAJ PARSA 24602 SELVA ROAD A DANA POINT, CA 92629 Permit Applicant Iraj Pam Owner KENNEDY, JOHN A 8 BETTY J 290 S SOLOMON DR Type Electrical Fixtures Oty Type Plumbing Fixtures City Mechanical Fixtures Oty Receptacle, switches, lights 18 Bath Tub 1 Ventilation Fan - <= 300 cfm on single duct 3 Shower E The permit shall expire by limitation and become null and void If the building or work has not passed final inspection 365 days from the date of permit issuance. A new permit is required to commence or continue work. I'll C, Cityof Anaheim OF P CEO Building Division F i - �OVNDEO tehn Do not occupy this building until the final inspections have been made. FINAL INSPECTIONS DATE INSPECTOR All applicable items below must be signed before utilities are released Final Gas Test Electrical Final 1�jh Plumbing Final Li / Mechanical Final 3( / Cross Connection Control (714) 765.4280 Engineering Final (714) 765-5126 INSPECTION I DATE I INSPECTOR Fire Sprinkler (ONLY) (714) 765-5041 Do not pour concrete until the following applicable items have been signed Fire Dept. Final (714) 765.5041 Plumbing (Ground/Underfloor Drain Waste) Water Engineering (714) 765.4591 Electrical Ground Electrode/i Sub List/Bus. Lic. (714) 765-5194 (Allow 10 business days) SetbacklFormslTrenches (Footings) COAIMigation Measures Do not install subfloor or pour floor slab until the follwing applicable items have been sioned Building Final (714 765.5153) Last Inspection -Final Only After Above Completed , Plumbing (Ground/Underfloor Water) Underfloor Rough Gas PARTIAL INSPECTIONS Build' n I`ns facctions (� �/ \ (1 zi IC. i �.5 Y—c� Li l� Mechanical (Groundwork) Electrical (Underground Conduit) Pre -slab (CompactionlMembrane Reinf.) Floor (Joist/Girders) ✓� Underfloor Insulation (Raised Foundation Only) Floor Nailing (Raised Foundation Only) 2nd Floor (Floor Nailing) Do not cover or c:. _ .- :. ork below until the fol roplicable items have been sicned 1st Floor Shear Firesprinkler (Rough) (Fire Dept.) Mechanical Inspections 2nd Floor Shear Roof (Sheathing/Diaphragm/Frame) Masonry (Reinf.IBond Beam/Pre-Grout) Rough Plumbing (Top Out) •i- twr �Y - Rough Duct (Mechanical) Rough Mechanical Z Rough Electrical 19141 Rough COAIMitagation Measures Plumbina Inspections 'JD h Framing (Only after Plbg_ Ele.. Mec. 8 Fire) (I Zi 2yVr Insulation (Sound/Energy)6k Ld A Kick Do not tape or plaster until the following applicable items have been signed : it Drywall Drywall Penetrations (Ele, Mec & Plbg) Interior Lath Exterior Lath Electrical Inspections Electrical Service Meter -(Meter w1l be set within 2.3 business days after approval) Excludes New Construction Exterior Plaster (Brown Coat) T-Bar (Struct., Ele., or Mec.) Grease Interceptor (Do not bai unless Sewer Water Engineering Backflow (Testable Only) Water Service