Loading...
140 S EL DORADO LN (9)Pemtit Types BLD ELE MEC PLM X X I X Permit Number: BLD2024-00739 Issued: 09/11/2024 www.anaheim.net/building (714)765-4626 Quarter Section: 168 CITY OF ANAHEIM BUILDING DIVISION 200 S. ANAHEIM BLVD. (714) 765. 5153 Site Address: 140 S EL DORADO LN, ANAHEIM, CA 92807 Legal Description: P BK 44 PG 10 PAR 4 APN: 36122116 jW �htl l fn 1� Project Description: Residential Remodel: Construct 190 sq. ft. patio cover, stairs leading to sod area with fire pit, and outdoor BBQ Living Area: Garage Area: Carport Area: Balcony / Deck Area: Cool Roof: Number of Stones: People Associated with Protect: Permit Applicant Roberto De Leon Owner OLIVA, MARTIN TR 140 S EL DORADO LN i Valuation: Construction Types: Occupancy Groups: Fire Sprinklered: Total Fees paid for Permit: 120,000.00 VB 2,041.51 Type Electrical Fixtures Qty Type Plumbing Fixtures Qty Mechanical Fixtures City Receptacle, switches, lights 5 Gas System (outlets) 2 The permit shall expire by limitation and become null and void if the building or work has not passed final Inspection 365 days from the date of permit issuance. A new permit is required to commence or continue work. PHEIM Cityof Anaheim o FN 1� 0 Building Division V ; \ g�NDEo ts�^ Do not occupy this building until the final inspections have been made. FINAL INSPECTIONS DATE INSPECTOR All applicable items below must be signed before utilities are released Final Gas Test Electrical Final Plumbing Final Mechanical Final Cross Connection Control (714) 765.4280 Engineering Final (714) 7655126 INSPECTION I DATE I INSPECTOR Fire Sprinkler (ONLY) (714) 7655041 Do not pour concrete until the following applicable items have been signed. Fire Dept. Final (714) 7655041 Plumbing (Ground/Underfloor Drain Waste) Water Engineering (714) 765-4591 Electrical Ground ElectrodelUfer Sub List/Bus. Lie. (714) 7655194 (Allow 10 business days) Setback/Forms/Trenches (Footings) COAIMigation Measures Do not install subiloor or pour floor slab until the follwing applicable items have been sioned Building Final (714 765-5153) Last inspection -Final Only AfterAbove Completed a — Plumbing(GroundlUnderfloor Water) Underfloor Rough Gas PARTIAL INSPECTIONS Building Inspections Mechanical (Groundwork) Electrical (Underground Conduit) Pre -slab (Compaction/Membrane Reinf.) Floor (Joist/Girders) Underfloor Insulation (Raised Foundation Only) Floor Nailing (Raised Foundation Only) 2nd Floor (Floor Nailing) Do not cover or conceal the work below until the following applicable items have been sianed 1st Floor Shear Firesprinkler (Rough) (Fire Dept.) Mechanical Inspections 2nd Floor Shear Roof (SheathinglDiaphragmlFrame) Masonry (Reinf./Bond BeamlPre-Grout) Rough Plumbing (Top Out) Rough Duct (Mechanical) Rough Mechanical Rough Electrical Rough COAIMitagation Measures Plumbing Inspections Framing (Only after Plbg.. Ele.. Mec. & Fire) Insulation (Sound/Energy) Do not tape or piaster until the following applicable items have been signed. Drywall Drywall Penetrations (Ele, Mae & Plbg) Interior Lath Exterior Lath Electrical Inspections Electrical Service Meter -(Meter will be set within 2-3 business days after approval) Excludes New Construct on Exterior Plaster (Brown Coat) T-Bar (Struct., Ele., or Mec.) Grease Interceptor Sewer Water Engineering Backflow (Testable Only) Water Service