Loading...
950 S BUCKNELL CIR (8)F O -v K)r-- Permit Types BLD ELE MEC FILM X Permit Number: BLD2025.00561 Issued: 02/05/2025 wu%v.anaheim.net/building (714)765-4626 Quarter Section: 286 Site Address: 950 S BUCKNELL CIR ANAHEIM, CA 92807 Legal Description: N TR 8375 BLK LOT 28 APN: 36506102 CITY OF ANAHEIM Project Description: Residential EV Charger Level 2 Living Area: Number or Stories: Garage Area: Carport Area: Balcony / Deck Area: Cool Roof BUILDING DIVISION 200 S. ANAHEIM BLVD. (714) 765. 5153 Valuation: 0.00 Construction Types: Occupancy Groups: Fire Sprinklered: Total Fees paid for Fame: 177.00 People Associated with Project: Contractor ECO-TECH ELECTRICAL SERVICES INC 2634 E COOLIDGE AVENUE ORANGE, CA 92867 Permit Applicant Steven A Ortiz Type Electrical Fixtures Qty Type Plumbing Fixtures Qty Mechanical Fixtures Cry EV Charger 1 The permit shall expire by limitation and become null and void if the building or work has not passed final inspection 365 days from the date of permit issuance. A new permit is required to commence or continue work. PNpH E I M Oq` City of Anaheim D4 10 Building Division f i > 0UNDED 1 Do not occupy this building until the final inspections have been made. FINAL INSPECTIONS I DATE INSPECTOR All applicable items below must be signed before utilities are released Final Gas Test Electrical Final 7-7 Zf TgPrLt Plumbing Final Mechanical Final Cross Connection Control (714) 765-4280 Engineering Final (714) 765-5126 INSPECTION I DATE I INSPECTOR Fire Sprinkler (ONLY) (714) 765-5041 Do not pour concrete until the following applicable items have been signed: Fire Dept. Final (714) 765-5041 Plumbing (Ground/Underfloor Drain Waste) Water Engineering (714) 765-4591 Electrical Ground ElectrodelUfer Sub LisUBus. Lic. (714) 765-5194 (Allow 10 business days) Setback/FormslTrenches (Footings) COA/Migation Measures Do not install subfloor or pour floor slab until the follwing applicable items have been stonedBuilding Final (714 765.5153) Last Inspection -Final Only After Above Completed Plumbing (Ground/Underfloor Water) Underfloor Rough Gas PARTIAL INSPECTIONS Building Inspections Mechanical (Groundwork) Electrical (Underground Conduit) Pre -slab (Compaction/Membrane Reinf.) Floor (Joist/Girders) Underfloor Insulation (Raised Foundation Only) Floor Nailing (Raised Foundation Only) 2nd Floor (Floor Nailing) Do not cover or conceal the work below until the following applicable items have been sianed tat Floor Shear Firesprinkler (Rough) (Fire Dept.) Mechanical Inspections 2nd Floor Shear Roof (Sheathing/Diaphragm/Frame) Masonry (Reinf./Bond Beam/Pre-Grout) Rough Plumbing (Top Out) Rough Duct (Mechanical) Rough Mechanical Rough Electrical Rough COA/Mitagation Measures Plumbing Inspections Framing (Only after Plbg., Ele.. Mec. & Fire) Insulation (Sound/Energy) Do not tape or plaster until the following applicable items have been signed. Drywall Drywall Penetrations (Ele, Mec & Plbg) Interior Lath Exterior Lath Electrical Inspections Electrical Service Meter -(Meter will be set within 2.3 business days after approval) Excludes New Construction Exterior Plaster (Brown Coat) T-Bar (Struct., Ele., or Mec.) Grease Interceptor (Do not backfill unless girinpri off) Sewer Water Engineering Backflow (Testable Only) Water Service