Loading...
239 S LARKWOOD ST (3)J Permit Types ,. BLD ELE MEC PLM X Permit Number: BLD2024.06358 Issued: 12/05/2024 www.anaheim.net/building (714)765-4626 Quarter Section: 219 She Address: 239 S LARKWOOD ST, ANAHEIM, CA 92808 Legal Description: N TR 10984 BLK LOT 28 APN: 35403111 CITY OF ANAHEIM BUILDING DIVISION 200 S. ANAHEIM BLVD. (714) 765. 5153 Project Description: Electrical: Residential EV Charger and 200amp main panel upgrade Living Area: Garage Area: Carport Area: Balcony I Deck Area: Cool Roof: Number of Stories: NP EIM t +7w die ♦.. �4k -i 1 Valuation: 0.00 ConsVuction Types: N/A Occupancy Groups: Fire Spnnklered: Total Fee. paid for Perma: 271.00 People Associated with Project: Contractor SUSTAINABLE ELECTRIC SOLUTIONS INC P O BOX 1997 POMONA, CA Owner DE WYN, EVERT III TR E 8 239 S LARKWOOD ST Type Electrical Fixtures City Type Plumbing Fixtures Oty Mechanical Fixtures Oty EV Charger 1 Meter/Disc Sw - Under 600 V, up to 200 1 amps The permit shall expire by limitation and become null and Void if the building or work has not passed final Inspection 365 days from the date of permit issuance. A new permit is required to commence or continue work. City of Anaheim ""Lim CSC O� io Building Division '- i > \ �oVA'oev ta`'h Do not occupy this building until the final inspections have been made. FINAL INSPECTIONS DATE INSPECTOR All applicable items below must be signed before utilities are released Final Gas Test Electrical Final Plumbing Final Mechanical Final Cross Connection Control (714) 765-4280 Engineering Final (714) 765-5126 INSPECTION I DATE I INSPECTOR Fire Sprinkler (ONLY) (714) 765.5041 Do not pour concrete until the following applicable itee. - ;: e been signed. Fire Dept. Final (714) 765.5041 Plumbing (GroundlUnderfloor Drain Waste) Water Engineering (714) 765.4591 Electrical Ground ElectrodelUfer Sub LisUBus. Lic. (714) 765-5194 (Allow 10 business days) Setback/Forms/Trenches (Footings) COAIMigation Measures Do not install subfloor or pour floor slab until the follwing applicable items have been sioned Building Final (714 765.6153) Last Inspection -Final Only After Above Completed Plumbing (Ground/Underfloor Water) Underfloor Rough Gas PARTIAL INSPECTIONS Building Inspections Mechanical (Groundwork) Electrical (Underground Conduit) Pre -slab (Compaction/Membrane Reinf.) Floor (JoisUGirdere) Underfloor Insulation (Raised Foundation Only) Floor Nailing (Raised Foundation Only) 2nd Floor (Floor Nailing) Do not cover or conceal the work below until the following applicable items have been saned 1st Floor Shear Firesprinkler (Rough) (Fire Dept.) Mechanical Inspections 2nd Floor Shear Roof (Sheathing/Diaphragm/Frame) Masonry (Reinf.lBond Beam/Pre-Grout) Rough Plumbing (Top Out) Rough Duct (Mechanical) Rough Mechanical Rough Electrical Rough COAIMitagation Measures Plumbing Inspections Framing (Only after Plbg., Ele., Mec. 8 Fire) Insulation (Sound/Energy) Do not tape or plaster until the following applicable items have been signed. Drywall Drywall Penetrations (Ele, Mec & Plbg) Interior Lath Exterior Lath Electrical Inspections Electrical Service Meter -(Meter will be set within 2-3 business days after approval) Excludes New ��3hC Tf�d(=, Exterior Plaster (Brown Coat) T-Bar (Struct., Ele., or Mec.) Grease Interceptor (Do not backfill unless sioned off) Sewer Water Engineering Backflow (Testable Only) Water Service