239 S LARKWOOD ST (3)J Permit Types
,. BLD ELE MEC PLM
X
Permit Number: BLD2024.06358
Issued: 12/05/2024
www.anaheim.net/building
(714)765-4626
Quarter Section: 219
She Address: 239 S LARKWOOD ST, ANAHEIM, CA 92808
Legal Description: N TR 10984 BLK LOT 28
APN: 35403111
CITY OF ANAHEIM
BUILDING DIVISION
200 S. ANAHEIM BLVD.
(714) 765. 5153
Project Description: Electrical: Residential EV Charger and 200amp main panel upgrade
Living Area:
Garage Area:
Carport Area:
Balcony I Deck Area:
Cool Roof:
Number of Stories:
NP EIM
t
+7w die ♦..
�4k -i
1 Valuation: 0.00
ConsVuction Types: N/A
Occupancy Groups:
Fire Spnnklered:
Total Fee. paid for Perma: 271.00
People Associated with Project:
Contractor SUSTAINABLE ELECTRIC SOLUTIONS INC P O BOX 1997 POMONA, CA
Owner DE WYN, EVERT III TR E 8 239 S LARKWOOD ST
Type Electrical Fixtures City Type Plumbing Fixtures Oty Mechanical Fixtures Oty
EV Charger 1
Meter/Disc Sw - Under 600 V, up to 200 1
amps
The permit shall expire by limitation and become null and Void if the building or work has not passed final Inspection 365 days from the
date of permit issuance. A new permit is required to commence or continue work.
City of Anaheim ""Lim CSC
O� io
Building Division '- i
>
\ �oVA'oev ta`'h
Do not occupy this building until the final inspections have been made.
FINAL INSPECTIONS
DATE
INSPECTOR
All applicable items below must be signed before utilities are released
Final Gas Test
Electrical Final
Plumbing Final
Mechanical Final
Cross Connection Control (714) 765-4280
Engineering Final (714) 765-5126
INSPECTION I
DATE I
INSPECTOR
Fire Sprinkler (ONLY) (714) 765.5041
Do not pour concrete until the following applicable itee. - ;: e been signed.
Fire Dept. Final (714) 765.5041
Plumbing (GroundlUnderfloor Drain Waste)
Water Engineering (714) 765.4591
Electrical Ground ElectrodelUfer
Sub LisUBus. Lic. (714) 765-5194 (Allow 10 business days)
Setback/Forms/Trenches (Footings)
COAIMigation Measures
Do not install subfloor or pour floor slab until the follwing applicable items have been
sioned
Building Final (714 765.6153)
Last Inspection -Final Only After Above Completed
Plumbing (Ground/Underfloor Water)
Underfloor Rough Gas
PARTIAL INSPECTIONS
Building Inspections
Mechanical (Groundwork)
Electrical (Underground Conduit)
Pre -slab (Compaction/Membrane Reinf.)
Floor (JoisUGirdere)
Underfloor Insulation (Raised Foundation Only)
Floor Nailing (Raised Foundation Only)
2nd Floor (Floor Nailing)
Do not cover or conceal the work below until the following applicable items have
been saned
1st Floor Shear
Firesprinkler (Rough) (Fire Dept.)
Mechanical Inspections
2nd Floor Shear
Roof (Sheathing/Diaphragm/Frame)
Masonry (Reinf.lBond Beam/Pre-Grout)
Rough Plumbing (Top Out)
Rough Duct (Mechanical)
Rough Mechanical
Rough Electrical
Rough COAIMitagation Measures
Plumbing Inspections
Framing (Only after Plbg., Ele., Mec. 8 Fire)
Insulation (Sound/Energy)
Do not tape or plaster until the following applicable items have been signed.
Drywall
Drywall Penetrations (Ele, Mec & Plbg)
Interior Lath
Exterior Lath
Electrical Inspections
Electrical Service Meter -(Meter will be set within 2-3
business days after approval) Excludes New
��3hC
Tf�d(=,
Exterior Plaster (Brown Coat)
T-Bar (Struct., Ele., or Mec.)
Grease Interceptor
(Do not backfill unless sioned off)
Sewer
Water Engineering Backflow (Testable Only)
Water Service