215 S GAIN STPermit Types
BLD ELE MEC PLM
X
Permit Number: BLD2025-00443
Issued: 01/29/2025
www.anaheim.net/building
(714)765-4626
Quarter Section: 27
Site Address: 215 S GAIN STANAHEIM, CA92804
Legal Description: N TR 6691 BLK LOT 7
APN: 12702317
CITY OF ANAHEIM
BUILDING DIVISION
200 S. ANAHEIM BLVD.
(714) 765 - 5153
Project Description: Reroof: Remove and install (10) sq of composition shingles and (8) sq of flat roof for the house and attached garage
Living Area: Number of Stories 1 Valuation:
Garage Area. Construction Types:
Carport Area: Occupancy Groups:
Balcony I Deck Area: Fire Sprinklered:
Cool Roof: Total Fees paid for Permit:
People Associated with Project:
Permit Applicant Mariano Raygoza
Owner RAVGOZA, MARIANO M TR M M 215 S GAIN ST
16,000.00
NIA
362.08
Type Electrical Fixtures Qty Type Plumbing Fixtures Qty Mechanical Fixtures Qty
The permit shall expire by limitation and become null and void if the building or work has not passed final inspection 365 days from the
date of permit issuance. A new permit Is required to commence or continue work.
PNt,HEIM C�<
Cityof Anaheim 0� iO
Building Division _� i
U >
�DVA'DET) tad^
Do not occupy this building until the final inspections have been made.
FINAL INSPECTIONS
DATE
INSPECTOR
All applicable items below must be signed before utilities are released
Final Gas Test
Electrical Final
Plumbing Final
Mechanical Final
Cross Connection Control (714) 765-4280
Engineering Final (714) 765-5126
INSPECTION I
DATE I INSPECTOR
Fire Sprinkler (ONLY) (714) 765-5041
Do not pour concre�e until the following applicable items have heen signed_
Fire Dept. Final (714) 765-5041
Plumbing (Ground/Underfloor Drain Waste)
Water Engineering (714) 765-4591
Electrical Ground Electrode/Ufer
Sub List/Bus. Lic. (714) 765-5194 (Allow 10 business days)
Setback/Forms/Trenches (Footings)
COA/Migation Measures
Do not install subfloor or pour floor slab until the follwing applicable items have been
signed.
Building Final (7147655153)
�.+sl Inspection -Final only Aker Above Completed
Zf11r2i
Plumbing (Ground/Underfloor Water)
Underfloor Rough Gas
PARTIAL INSPECTIONS
Building Inspections
Mechanical (Groundwork)
Electrical (Underground Conduit)
Pre -slab (Compaction/Membrane Reinf.)
Floor (Joist)Girders)
Underfloor Insulation (Raised Foundation Only)
Floor Nailing (Raised Foundation Only)
2nd Floor (Floor Nailing)
Do not cover or conceal the work below until the following applicable items have
been signed
1st Floor Shear
Firesprinkler (Rough) (Fire Dept.)
Mechanical Inspections
2nd Floor Shear
Roof (Sheathing/Diaphragm/Frame)
Masonry (Reinf./Bond Beam/Pre-Grout)
Rough Plumbing (Top Out)
Rough Duct (Mechanical)
Rough Mechanical
Rough Electrical
Rough COA/Mitagation Measures
Plumbing Inspections
Framing Ogle af!er Pltc Eie.. Mee. & Fire)
Insulation (Sound/Energy)
..rot tape or plaster until the following applicable items have been signed
Drywall
Drywall Penetrations (Ele, Mec & Plbg)
Interior Lath
Exterior Lath
Electrical Inspections
Electrical Service Meter -(Meter will be set wthin 2-3
business days after approval) Excludes New
Construction
Exterior Plaster (Brown Coat)
T-Bar (Struct., Ele., or Mec.)
Grease Interceptor
Sewer
Water Engineering Backflow (Testable Only)
Water Service