Loading...
213 S GAIN STPermit Types BLD ELE MEC PLM X Permit Number: BLD202540565 Issued: 02/04/2025 www.anaheinn.net/building (714)765-4626 Quarter Section. 27 Site Address: 213 S GAIN STANAHEIM, CA 92804 Legal Description: N TR 6691 BLK LOT 8 APN: 12702316 CITY OF ANAHEIM BUILDING DIVISION 200 S. ANAHEIM BLVD. (714)765-5153 Project Description: Reroof: To remove and install (16) squares of composition shingles over house and attached garage. Living Area: Number of Stories: 1 Valuaflon: Garage Area: Conseucoon Types: CarportArea: Occupancy Groups: Balcony / Deck Area: Fire Sprinklered: Cool Roof: Totat Fees paid for Permit: People Associated with Project: Permit Applicant Jose Davalos Owner DUARTE, JOSE DAVALOS 213 S GAIN ST 15,000.00 VB 360.95 Type Electrical Fixtures Oty Type Plumbing Fixtures Qly Mechanical Fixtures Oty The permit shall expire by limitation and become null and void if the building or work has not passed final Inspection 365 days from the date of permit issuance. A new permit is required to commence or continue work. "�1ty of Anaheim PHEIM� ,F P�—�d\Sn. Building Division P\ t - NEp Do not occupy this building until the final inspections have been made. FINAL INSPECTIONS DATE INSPECTOR All applicable items below must be signed before utilities are released Final Gas Test Electrical Final Plumbing Final Mechanical Final Cross Connection Control (714) 765-4280 Engineering Final (714) 765-5126 INSPECTION I DATE I INSPECTOR Fire Sprinkler (ONLY) (714) 765-5041 Do not pour concrete until the following applicable items have been signed. Fire Dept. Final (714) 765-5041 Plumbing (Ground/Underfloor Drain Waste) Water Engineering (714) 765-4591 Electrical Ground Electrode/Ufer Sub List/Bus. Lic. (714) 765-5194 (Allow 10 business days) SetbacklForms/Trenches (Footings) COAIMigation Measures Do not install subfloor or pour floor slab until the follwing applicable items have been signed Building Final (714 765-51153) Last Inspection -Final Only After Above Completed Plumbing (Ground/Underfloor Water) Underfloor Rough Gas PARTIAL INSPECTIONS Building Inspections Mechanical (Groundwork) Electrical (Underground Conduit) Pre -slab (Compaction/Membrane Reinf.) Floor (Joist/Girders) Underfloor Insulation (Raised Foundation Only) Floor Nailing (Raised Foundation Only) 2nd Floor (Floor Nailing) Do not cover or conceal the work below until the following applicable items have been signed 1st Floor Shear Firesprinkler (Rough) (Fire Dept.) Mechanical Inspections 2nd Floor Shear Roof(Sheathing/Diaphragm/Frame) 1'11�j,j Masonry (Reinf./Bond Beam/Pre-Grout) Rough Plumbing (Top Out) Rough Duct (Mechanical) Rough Mechanical Rough Electrical Rough COA/Mitagation Measures Plumbing Inspections Framing Onry after Flbg.. Ele - Alec & Fire) Insulation (Sound/Energy) Do not tape or plaster until the following applicable rtems have been sgned Drywall Drywall Penetrations (Ele, Mec & Plbg) Interior Lath Exterior Lath Electrical Inspections Electrical Service Meter -(Meter will be set within 2-3 busness days after approval) Excludes New Construct on Exterior Plaster (Brown Coat) T-Bar (Struct., Ele., or Mec.) Grease Interceptor Sewer Water Engineering Backflow (Testable Only) Water Service