Loading...
114 W MIDWAY MANOR (2)Permit Types BLD ELE MEC I PLM X Permit Number: BLD2O12-02682 Issued'08/08/2012 EIM INSPECTION REQUEST LINE: But ll1N( DtVJSIAN (714) 765 - 4626 200 SSA` NAHEIMIeLVD. Quarter Section: 85 (714) 765 • 5153 Site Address r1141WJMIDWAYI1VlNR _ I JLegaloDeseriptioniNiTiR.1194�20T327 ?ye r r t "fin �.ANAR.13'f.�r�"�'�`-.Yn°Sw Project Description: Plumbing to replace gas line from meter to house with like for like. Valuation: Consbucion Types: WA, , Fire Spdnklered4 No Cool Roof No Total Fees paid for Permit: 136.73 People Associated with Project: Owner MARCIA J LA MANITIA 19171 STONECREST LN YORBA LINDA CA 92886-5424 Contractor ORTEGA PLUMBING 15246 LINDHALL WAY WHITTIER CA 90604 Permit Applicant ALBERT ORTEGA Type Electrical Fixtures Qty Type Plumbing Fixtures Qly Type Mechanical Fixtures Cry Gas System (1-5 outlets) 1 The permit shall expire by limitation and become null and void if the building or work has not passed final inspection 365 days from the date of permit issuance. Anew permit is required to commence or continue work. ibld_permit_combo P��H E IM Cq( City of Anaheim Ov io Building Division F i > O�Nptso `ay1 Do not occupy this building until the final inspections have been made. FINAL INSPECTIONS DATE NSPECTOR All applicable items below must be signed before utilities are released Final Gas Test Electrical Final Plumbing Final Mechanical Final Cross Connection Control (714) 765.4280 Engineering Final (714) 7655126 INSPECTION I DATE I INSPECTOR Fire Sprinkler (ONLY) (714) 765-5041 Do not pour concrete until the following applicable items have been signed: Fire Dept. Final (714) 765.5041 Plumbing (Ground/Underfloor Drain Waste) Water Engineering (714) 76SA591 Electrical Ground ElectrodelUfer Sub List/Bus. Lic. (714) 765-5194 (Allow 10 business days) Setback/Forms/Trenches (Footings) COA/Migation Measures Do not install subIll or pour floor slab until the follwing applicable items have been si ned: Building Final (714 765.5153) Last Inspection -Final Only After Above Completed Plumbing (Ground/Underfloor Water) Underfloor Rough Gas PARTIAL INSPECTIONS B011dirl Inspections Mechanical (Groundwork) Electrical (Underground Conduit) Pre -slab (Compaction/Membrane Reinf.) Floor (JoisUGirders) Undefloor Insulation (Raised Foundation Only) Floor Nailing (Raised Foundation Only) 2nd Floor (Floor Nailing) Do not cover or conceal the work below until the following applicable items have been signed tat Floor Shear Firesprinkler (Rough) (Fire Dept.) Mechanical Inspections 2nd Floor Shear Roof (Sheathing/Diaphragm/Frame) Masonry (Reinf./Bond Beam/Pre-Grout) Rough Plumbing (Top Out) Rough Duct (Mechanical) Rough Mechanical Rough Electrical Rough COA/Mitagation Measures Plumbinq Inspections " Framing (Only after Plbg., Ele., Mec. 5 Fire)^ Insulation (Sound/Energy) a Do not tape or plaster until the following applicable items have been signed: Drywall --y Drywall Penetrations (Ele, Mec & Plbg) Interior Lath Exterior Lath _Electrical Inspections Electrical Service Meter -(Meter will be set within 2-3 business days after approval) Excludes New Construction Exterior Plaster (Brown Coat) T-Bar (Struct., Ele., or Mec.) Grease Interceptor (Do not backfill unless sioned off) Sewer Water Engineering Backflow (Testable Only) Water Service