Loading...
839 N LENZ DR (6)Permit Types BLD ELE MEC PLM X X X X Permit Number: BLD2021-00955 Issued: 04/02/2021 www.anaheim.net/building (714)765-4626 Quarter Section: 61 Site Address: 839 N LENZ DR ANAHEIM, CA Legal Description: N TR 1404 LOT 8 APN: 25513308 CITY OF ANAHEIM BUILDING DIVISION 200 S. ANAHEIM BLVD. (714) 765 - 5153 Project Description: Residential Remodel: Removal load bearing wall between living room and kitchen with new electrical, gas line. Work done prior to obtaining permit. REF:INV2021-00021 Living Area: Number of Stories: 0 Valuation: 10,000.00 Garage Area: Consauclion Types: Not Applicable Carport Area: Occupancy Groups: Balcony I Deck Area: Fire Sprinklered: Cool Roof Total Fees paid for Permit: 1,224.30 People Associated with Project: Owner REBECCA SANCHEZ 839 N LENZ DR ANAHEIM, CA 92805 Type Electrical Fixtures Oty Type Plumbing Fixtures Qty Mechanical Fixtures Oty Receptacle, switches, lights 16 Gas System (1-5 outlets) 1 Ventilation Fan - <= 300 rim on single duct 1 The permit shall expire by limitation and become null and void If the building or work has not passed final inspection 365 days from the date of permit issuance. A new permit Is required to commence or continue work. nN E11MA Cityof Anaheim OF P� q,�O Building Division _~ i • O�NOEO � Do not occupy this building until the final inspections have been made. FINAL INSPECTIONS DATE INSPECTOR All applicable items below must be signed before utilities are released Final Gas Test Electrical Final S Plumbing Final Mechanical Final Cross Connection Control (714) 765-4280 Engineering Final (714) 765-5126 INSPECTION I DATE I INSPECTOR Fire Sprinkler (ONLY) (714) 765-5041 Do not pour concrete until the following applicable items have been signed: Fire Dept. Final (714) 765-5041 Plumbing (Ground/Underfloor Drain Waste) Water Engineering (714) 765.4591 Electrical Ground ElectrodelUfer Sub List/Bus. Lic. (714) 765.5194 (Allow 10 business days) SetbackfFormslTrenches (Footings) COAlMigation Measures Do not install subfloor or pour floor slab until the follwing applicable items have been sioned Building Final (714 765.5163) Last Inspection -Final Only After Above Completed Plumbing (GroundlUnderfloor Water) Underfloor Rough Gas PARTIAL INSPECTIONS Building Inspections Mechanical (Groundwork) Electrical (Underground Conduit) Pre -slab (Compaction/Membrane Reinf.) Floor (JoisVGirders) Underfloor Insulation (Raised Foundation Only) Floor Nailing (Raised Foundation Only) 2nd Floor (Floor Nailing) Do not cover or conceal the work below until the following applicable items have been tat Floor Shear Firesprinkler (Rough) (Fire Dept.) Mechanical Inspections 2nd Floor Shear Roof (Sheathing/Diaphragm/Frame) Masonry (ReinfJBond Beam/Pre-Grout) Rough Plumbing (Top Out) Rough Duct (Mechanical) Rough Mechanical Rough Electrical Rough COAIMitagation Measures Plumbing Inspections Framing (Only after Plbg., Ele., Mec. & Fire i Insulation (Sound/Energy) Do not tape or plaster until the following applicable items have been signed. Drywall Drywall Penetrations (Ele, Mec 3 Plbg) Interior Lath Exterior Lath Electrical Inspections Electrical Service Meter -(Meter will be set within 2-3 business days after approval) Excludes New Exterior Plaster (Brown Coat) T-Bar (Struct., Ele., or Mec.) Grease Interceptor Me b,ickfill,inless stoned off) not Sewer Water Engineering Backflow (Testable Only) Water Service