519 N CHERRY TREE LNPermit Types
SLID ELE MECLM
X P
Permit Number: BLD2025-00874
Issued: 02/21/2025
www.a naheim.netfbuilding
(714)765-4626
Quarter Section: 122
CITY OF ANAHEIM
BUILDING DIVISION
200 S. ANAHEIM BLVD.
(714) 765. 5153
Site Address: 519 N CHERRY TREE LN ANAHEIM, CA 92806
Legal Description: S TWP 4 RGE 10 SEC 12 SEC 12 T 4 R 10 N 165 FT S 3
APN: 08302022 -
Project Description: Re roof: To remove and Install (5) squares of flat roof torch down over patio cover only
Living Area Numberof Stories: 1 Valuation:
1,500.00
Garage Area Construction Types:
VB
CarportArea: Occupancy Groups:
Balcony I Deck Area: Fire Sprinklered:
No
Cool Roof: Total Fees paid for Permit:
359.20
People Associated with Project:
Contractor ADVANCED ROOFING SYSTEMS INC 2801 JUNIPERO AVE,SUITE 200 SIGNAL HILL, CA 90755
Pernit Applicant Estefani Aguilar
Owner DAVIS, CARSON N TR 519 N CHERRY TREE LN ANAHEIM
Type Electrical Fixtures Oly Type Plumbing Fixtures City Mechanical Fixtures Oty
The permit shall expire by limitation and become null and void if the building or work has not passed final inspection 365 days from the
dale of permit issuance. A new permit is required to commence or continue work.
ra rl{EIM oq<
Cityof Anaheim 04 io
Building Division F Z
>
�OVNDEO t�F^
Do not occupy this building until the final inspections have been made.
FINAL INSPECTIONS
DATE INSPECTOR
All applicable items below must be signed before utilities are released
Final Gas Test
Electrical Final
Plumbing Final
Mechanical Final
Cross Connection Control (714) 7654280
Engineering Final (714) 765-5126
INSPECTION
I DATE
I INSPECTOR
Fire Sprinkler (ONLY) (714) 765-5041
Do not pour ccncrele until the following applicable items have been signed:
Fire Dept. Final (714) 765-5041
Plumbing (Ground/Underfloor Drain Waste)
Water Engineering (714) 7654591
Electrical Ground Electrode/Ufer
Sub List/Bus. Lic. (714) 765-5194 (Allow 10 business days)
Setback/Forms/Trenches (Footings)
COA/Migation Measures
Do not install subfloor or pour floor slab until the follwing applicable items have been
sianed-
Building Final (714 765.5153)
Last Inspection -Final Only After Above Completed
�r
h
Plumbing (Ground/underfloor Water)
Underfloor Rough Gas
PARTIAL INSPECTIONS
Building Inspections
Mechanical (Groundwork)
Electrical (Underground Conduit)
Pre -slab (Compaction/Membrane Reinf.)
Floor (Joist/Girders)
Underfloor Insulation (Raised Foundation Only)
Floor Nailing (Raised Foundation Only)
2nd Floor (Floor Nailing)
Do not cover or conceal the work below until the following applicable items have
been all
1st Floor Shear
Firesprinkler (Rough) (Fire Dept.)
Mechanical Inspections
2nd Floor Shear
Roof (Sheathing/Diaphragm/Frame)
Masonry (Reinf./Bond Beam/Pre-Grout)
Rough Plumbing (Top Out)
Rough Duct (Mechanical)
Rough Mechanical
Rough Electrical
Rough COA/Mitagation Measures
Plumbing Inspections
Framing (Only after Plbg.. Ele.. Mee. 8 Fire)
Insulation (Sound/Energy)
Do not tape or plaster until the followng applicable items have been signed.
Drywall
Drywall Penetrations (Ele, Mee & Plbg)
Interior Lath
Exterior Lath
Electrical Inspections
Electrical Service Meter -(Meter will be set within 2-3
business days after approval) Excludes New
Exterior Plaster (Brown Coat)
T-Bar (Struct., Ele., or Mec.)
Grease Interceptor
Sewer
Water Engineering Backflow (Testable Only)
Water Service