206 E WAKEFIELD AVE (2)Permit Types
BLD ELE MEC FILM
X
Permit Number: BLD2024-04267
Issued: 12/09/2024
www.anaheim.net/building
(714)765-4626
Quarter Section: 98
Site Address: 206 E WAKEFIELD AVE, Anaheim, CA 92802
Legal Description: N TR 3535 BLK LOT 13 -
APN: 13733501
CITY OF ANAHEIM
BUILDING DIVISION
200 S. ANAHEIM BLVD.
(7141765 - 5153
Project Description: Residential Remodel: Replace (E) guard rails at unit C & D. Replace (E) Exterior Stairwell between units.
Living Area: Number of Stones: 2 Valuation:
Garage Area: Construction Types:
Carport Area: Occupancy Groups:
Balcony / Deck Area: 'Fire Sprinklered:
Cool Roof: Total Fees paid for Permit:
People Associated with Project
1 0
18,000.00
VB
1,317.34
Permit Applicant Julie Ramos
Owner EVANS, JOHN V TR EVANS 2305 HILL LN
Contractor PRECISION IRONWORKS 4815 SLAUSON AVE201712271534353629 MAYWOOD. CA 90604
Engineer- Civil AYMAN SHMEIT 9744 MAPLE ST STE #101 BELLFLOWER, CA 90706
Type Electrical Fixtures Oty Type Plumbing Fixtures Qty Mechanical Fixtures Qty
The permit shall expire by limitation and become null and void if the building or work has not passed final inspection 365 days from the
date of permit issuance. A new permit Is required to commence or continue work.
P�r,NEIM C�`
City of Anaheim OF iO
Building Division - z
7,1'
• ��6NUEp ta`'1
Do not occupy this building until the final inspections have been made.
FINAL INSPECTIONS
DATE
INSPECTOR
All applicable items below must be signed before utilities are released
Final Gas Test
Electrical Final
Plumbing Final
Mechanical Final
Cross Connection Control (714) 765-4280
Engineering Final (714) 765-5126
INSPECTION I DATE
INSPECTOR
Fire Sprinkler (ONLY) (714) 765-6041
Do not pour concrete until the following applicable items have been signed
Fire Dept. Final (714) 765-5041
Plumbing (Ground/Underfloor Drain Waste)
Water Engineering (714) 765-4591
Electrical Ground Electrode/Ufer
Sub List/Bus. Lic. (714) 765-5194 (Allow 10 business days)
Setback/Forms[Trenches (Footings)
COA/Migation Measures
Do not install subfloor or pour floor slab until the follwing asioned pplica le items have been
Building Final (714 765-5153)
Last Inspection -Final Only After Above Completed
Plumbing(Ground/Underfloor Water)
Underfloor Rough Gas
PARTIAL INSPECTIONS
Building Inspections
Mechanical (Groundwork)
Electrical (Underground Conduit)
Pre -slab (Compaction/Membrane Reinf.)
Floor (Joist/Girdere)
Underfloor Insulation (Raised Foundation Only)
Floor Nailing (Raised Foundation Only)
2nd Floor (Floor Nailing)
Do not cover or conceal the work below until the following applicable items have
1st Floor Shear
Firesprinkler (Rough) (Fire Dept.)
Mechanical Inspections
2nd Floor Shear
Roof (Sheathing/Diaphragm/Frame)
Masonry (Reinf./Bond Beam/Pre-Grout)
Rough Plumbing (Top Out)
Rough Duct (Mechanical)
Rough Mechanical
Rough Electrical
Rough COA/Mitagation Measures
Plumbing Inspections
Framing (Only after Plbg.. Eli Mec. 8 Fire)
//- Zr
flcr/c L
Insulation (Sound/Energy)
Do not tape or plaster until the following applicable items have been signet
Drywall
Drywall Penetrations (Ele, Mec & Plbg)
Interior Lath
Exterior Lath
Electrical Inspections
Electrical Service Meter -(Meter will be set within 2-3
business days after approval) Excludes New
Construct on
Exterior Plaster (Brown Coat)
T-Bar (Struct., Ele., or Mec.)
Grease Interceptor
(Do not backfill unless s oned off)
Sewer
Water Engineering Backflow (Testable Only)
Water Service