Loading...
318 E WAKEFIELD AVE (5)Permit Types BLD ELE MEC PLM X Permit Number: BLD2024-06640 Issued: 02/11/2025 www.anaheim.neUbuild i ng (714)765-4626 Quarter Section: 98 Site Address: 318 E WAKEFIELD AVE ANAHEIM, CA 92802 Legal Description: N TR 3535 BLK LOT 10 APN: 13733803 CITY OF ANAHEIM BUILDING DIVISION 200 S. ANAHEIM BLVD. (714) 765 -5153 pHElA1 t 14 LC-Lo" O- E j ' - it, Project Description: Residential Remodel: 110 sq. ft. to extend roof overhang for apartment building. Work done prior to permit, REF:INV2024-00500. Living AreaNumber or Stones: 2 Valuation: 2,000.00 Garage Area: Construction Types: VB CarportArea: Occupancy Groups: Balcony / Deck Area: Fire Sprinklered: No Cool Roof: Total Fees paid for Permit: 1,000.01 People Associated with Project: Permit Applicant David Chang Owner XU, SHAOLI TR S 8 D C XU 13337 SOUTH ST 256 Type Electrical Fixtures City Type Plumbing Fixtures Oty Mechanical Fixtures City The permit shall expire by limitation and become null and Vold If the building or work has not passed Final inspection 365 days from the date of permit issuance. A new permit is required to commence or continue work. Pat,NEIM �q< FINAL INSPECTIONS DATE INSPECTOR City of Anaheim OF io All applicable items below must be signed before utilities are released Building Division i Final Gas Test Electrical Final Plumbing Final • �DVNDEV t8`�^ Mechanical Final Cross Connection Control (714) 765-4280 Do not occupy this building until the final inspections have been made. Engineering Final (714) 765-5126 INSPECTION I DATE I INSPECTOR Fire Sprinkler (ONLY) (714) 7655041 Do not pour concrete until the following applicable items have been signed: Fire Dept. Final (714) 765-5041 Plumbing (Ground/Underfloor Drain Waste) Water Engineering (714) 765-4591 Electrical Ground Electrode/Ufer Sub LIstlBus. Lie. (714) 765-5194 (Allow 10 business days) Setback/Forms/Trenches (Footings) COA/Migation Measures Do not install subfloor or pour floor slab until the follwing applicable items have been Building Final (714 7654153) Last Inspection -Final Only After Above Completed Pill v , Plumbing (Ground/Underfloor Water) Underfloor Rough Gas PARTIAL INSPECTIONS Building Inspections Mechanical (Groundwork) Electrical (Underground Conduit) Pre -slab (Compaction/Membrane Reinf.) Floor (JoisUGirders) Underfloor Insulation (Raised Foundation Only) Floor Nailing (Raised Foundation Only) 2nd Floor (Floor Nailing) Do not cover or conceal the work below until the following applicable items have been sioned 1st Floor Shear Firesprinkler (Rough) (Fire Dept.) Mechanical Inspections 2nd Floor Shear Roof (Sheathing/Diaphragm/Frame) ��nn As. Masonry (Reinf./Bond BeamlPre-Grout) Rough Plumbing (Top Out) Rough Duct (Mechanical) Rough Mechanical Rough Electrical Rough COAIMitagation Measures Plumbing Inspections Framing (Only after Plbg.. Ele- Mec. B Fire Insulation (Sound/Energy) Do not tape or plaster until the following applicable items have been signed. Drywall Drywall Penetrations (Ele, Mae & Plbg) Interior Lath Exterior Lath Electrical Inspections Electrical Service Meter -(Meter will be set within 2-3 business days after approval) Excludes New Construction Exterior Plaster (Brown Coat) T-Bar (Struct., Ele., or Mae.) Grease Interceptor Sewer Water Engineering Backflow (Testable Only) Water Service