Loading...
715 S WEBSTER AVE 24Permit Types BLD ELE MEC PLM CITY OF ANAHEIM X BUILDING DIVISION Permit Number: BLD202446736 200 S. ANAHEIM BLVD. Issued: 12/30/2024 1714)765. 5153 1W www.anaheim.net/building (714)765-4626 Quarter Section: 28 Site Address: 715 S WEBSTER AVE 24, ANAHEIM, CA 92804 Legal Description: N TR 11178 BLK LOT 1 UN 24 TR 11178 LOT 1 UNIT 24 APN: 93934024 Project Description: Residential Remodel: Install (120) sq of drywall Living Area: Number of Stores: 1 Valuation: 2,000.00 Garage Area: Construction Types: NIA Carport Area: Occupancy Groups: Balcony I Deck Area: Fire SprinklereB Cool Roof: Total Fees paid for Permit: 238,56 People Associated with Project: Contractor MARATHON ENTERPRISES INC 1050 W ALAMEDA AVE #306 BURBANK, CA Permit Applicant Antonio Ramos Owner OTT, JEFFREY R 715 S WEBSTER AVE 24 Type Electrical Fixtures Oty Type Plumbing Fixtures Qty Mechanical Fixtures Oty The permit shall expire by limitation and become null and void if the building or work has not passed Final inspection 365 days from the date of permit Issuance. A new permit is required to commence or continue work. A "Elm i O/PaP cAd". City of Anaheim > a Building Division � Z, FINAL INSPECTIONS DATE INSPECTOR All applicable Items below must be signed before utilities are released Final Gas Test Electrical Final ,u ID/ Plumbing Final \ Mechanical Final �DUNDED j8h^ Cross Connection Control (714) 765.4280 Engineering Final (714) 7655126 Do not occupy this building until the final inspections have been made. INSPECTION DATE INSPECTOR Fire Sprinkler (ONLY) (714) 765-5041 Do not pour concrete until the following applicable items have been signed: Fire Dept. Final (714) 765.5041 Plumbing (Ground/Underfloor Drain Waste) Electrical Ground ElectrodelUfer Water Engineering (714) 765.4591 Sub LisUBus. Lic. (714) 765-5194 (Allow 10 business days) Setback/Formsrrrenches (Footings) COA/Migation Measures Do not install subfloor or pour floor slab until the follwing applicable si items have been Building Final (714 765-5153) IiD Ill Last Inspection -Final Only After Above Completed r Water) Plumbing (GroundEGas Underfloor RoughMechanical INSPECTIONS Building Inspections (GrouPARTIAL Electrical (Undergduit) Pre -slab (Compacane Reinf.) Floor (Joist/Girders) Underfloor Insulation (Raised Foundation Only) Floor Nailing (Raised Foundation Only) 2nd Floor (Floor Nailing) Do not cover or conceal the work below until me following applicable items have been n list Floor Shear Firesprinkler (Rough) (Fire Dept.) Mechanical Inspections 2nd Floor Shear Roof (Sheathing/Diaphragm/Frame) Masonry (Reinf.lBond Beam/Pre-Grout) Rough Plumbing (Top Out) Rough Duct (Mechanical) Rough Mechanical Rough Electrical Rough COA/Mitagation Measures Plumbing Inspections Framing (Only after Plbg., Ele., Mec8 Fire) Insulation(Sound/Energy) l� 2 Do not tape or plaster until the following applicable items have been signed: Drywall Drywall Penetrations (Ele, Mec & Plbg) Interior Lath Exterior Lath Electrical Inspections Electrical Service Meter -(Meter will be set within 2.3 business days after approval) Excludes New Construction Exterior Plaster (Brown Coat) T-Bar (Struct., Ele., or Mec.) Grease Interceptor (Do not backfill unless sioned off) - Sewer Water Engineering Backflow (Testable Only) Water Service