715 S WEBSTER AVE 24Permit Types
BLD
ELE
MEC
PLM
CITY OF ANAHEIM
X
BUILDING DIVISION
Permit Number: BLD202446736 200 S. ANAHEIM BLVD.
Issued: 12/30/2024 1714)765. 5153
1W
www.anaheim.net/building
(714)765-4626
Quarter Section: 28
Site Address: 715 S WEBSTER AVE 24, ANAHEIM, CA 92804
Legal Description: N TR 11178 BLK LOT 1 UN 24 TR 11178 LOT 1 UNIT 24
APN: 93934024
Project Description: Residential Remodel: Install (120) sq of drywall
Living Area: Number of Stores: 1 Valuation:
2,000.00
Garage Area: Construction Types:
NIA
Carport Area: Occupancy Groups:
Balcony I Deck Area: Fire SprinklereB
Cool Roof: Total Fees paid for Permit:
238,56
People Associated with Project:
Contractor MARATHON ENTERPRISES INC 1050 W ALAMEDA AVE #306 BURBANK, CA
Permit Applicant Antonio Ramos
Owner OTT, JEFFREY R 715 S WEBSTER AVE 24
Type Electrical Fixtures Oty Type Plumbing Fixtures Qty Mechanical Fixtures Oty
The permit shall expire by limitation and become null and void if the building or work has not passed Final inspection 365 days from the
date of permit Issuance. A new permit is required to commence or continue work.
A
"Elm
i O/PaP cAd".
City of Anaheim
> a
Building Division � Z,
FINAL INSPECTIONS
DATE
INSPECTOR
All applicable Items below must be signed before utilities are released
Final Gas Test
Electrical Final
,u ID/
Plumbing Final
\
Mechanical Final
�DUNDED j8h^
Cross Connection Control (714) 765.4280
Engineering Final (714) 7655126
Do not occupy this building until the final inspections have been made.
INSPECTION DATE
INSPECTOR
Fire Sprinkler (ONLY) (714) 765-5041
Do not pour concrete until the following applicable items have been signed:
Fire Dept. Final (714) 765.5041
Plumbing (Ground/Underfloor Drain Waste)
Electrical Ground ElectrodelUfer
Water Engineering (714) 765.4591
Sub LisUBus. Lic. (714) 765-5194 (Allow 10 business days)
Setback/Formsrrrenches (Footings)
COA/Migation Measures
Do not install subfloor or pour floor slab until the follwing applicable
si
items
have been
Building Final (714 765-5153) IiD Ill
Last Inspection -Final Only After Above Completed
r Water)
Plumbing (GroundEGas
Underfloor RoughMechanical
INSPECTIONS
Building Inspections
(GrouPARTIAL
Electrical (Undergduit)
Pre -slab (Compacane Reinf.)
Floor (Joist/Girders)
Underfloor Insulation (Raised Foundation Only)
Floor Nailing (Raised Foundation Only)
2nd Floor (Floor Nailing)
Do not cover or conceal the work below until me following applicable items have
been n
list Floor Shear
Firesprinkler (Rough) (Fire Dept.)
Mechanical Inspections
2nd Floor Shear
Roof (Sheathing/Diaphragm/Frame)
Masonry (Reinf.lBond Beam/Pre-Grout)
Rough Plumbing (Top Out)
Rough Duct (Mechanical)
Rough Mechanical
Rough Electrical
Rough COA/Mitagation Measures
Plumbing Inspections
Framing (Only after Plbg., Ele., Mec8 Fire)
Insulation(Sound/Energy) l� 2
Do not tape or plaster until the following applicable items have been signed:
Drywall
Drywall Penetrations (Ele, Mec & Plbg)
Interior Lath
Exterior Lath
Electrical Inspections
Electrical Service Meter -(Meter will be set within 2.3
business days after approval) Excludes New
Construction
Exterior Plaster (Brown Coat)
T-Bar (Struct., Ele., or Mec.)
Grease Interceptor
(Do not backfill unless sioned off) -
Sewer
Water Engineering Backflow (Testable Only)
Water Service