Loading...
904 S CANYON HEIGHTS DR (3)Permit Types BLDTLE MEC PFILMi_ -. X Permit Number: BLD2025A0479 Issued: 01/30/2025 CITY OF ANAHEIM wwwStratheim.net/building (714)765-4626 Ou arter Section: 232 Site Address: 904 S CANYON HEIGHTS DR ANAHEIM, CA 92808 Legal Description: N TR 15123 BLK LOT 11 APN: 51408129 BUILDING DIVISION 200 S. ANAHEIM BLVD. (714) 765 - 5153 Project Description: Electrical for residential EV charger inside the garage Living Area: Garage Area: Carport Nea: Balcony / Deck Area: Cool Roof: Number of Stories: 1 Valuation: 0.00 Construction Types: N/A Occupancy Groups: Fire Spmnklere is Total Feu paid far Perot: 177.00 People Associated with Project: Contractor SON POWER INDUSTRIES INC 31290 OAK CREST DRIVE,SUITE 6201804191145597830 WESTLAKE VILLAGE, CA 91359 Permit Applicant Sara Gelfand Owner MAGUIRE, MARK JOSEPH TR 904 S CANYON HEIGHTS DR Type Electrical Fixtures Oty Type Plumbing Fixtures Oty Mechanical Fixtures Oty EV Charger 1 The permit shall expire by limitation and become null and void if the building or work has not passed final inspection 365 days from the dale of permit issuance. A new permit is required to commence or continue work. �PHEIM Cq Cityof Anaheim OFP 7�o Building Division y . / • .DVA`DED Do not occupy this building until the final inspections have been made. FINAL INSPECTIONS D/ 'E INSPECTOR All applicable items below must be signed before ubillgh are released Final Gas Test Electrical Final Plumbing Final Mechanical Final Cross Connection Control (714) 765-4280 Engineering Final (714) 765-5126 INSPECTION I DATE I INSPECTOR Fire Sprinkler (ONLY) (714) 765-5041 Do not pour concrete until the following applicable items have been signed Fire Dept. Final (714) 765-5041 Plumbing (Ground/Underfloor Drain Waste) Water Engineering (714) 765-4591 Electrical Ground Electrode/Ufer Sub LisUBus. Lic. (714) 765-5194 (Allow 10 business days) Setback/Forms/7renches (Footings) COA/Migation Measures Do not install subfloor or pow floor slab until the follwing applicable items have been siccedBuilding Final (714 765-5153) Last Inspection -Final Only After Above Completed Plumbing (Ground/Underfloor Water) Underfloor Rough Gas PARTIAL INSPECTIONS Building Inspections Mechanical (Groundwork) Electrical (Underground Conduit) Pre -slab (Compaction/Membrane Reinf.) Floor (Joist/Girders) Underfloor Insulation (Raised Foundation Only) Floor Nailing (Raised Foundation Only) 2nd Floor (Floor Nailing) Do, I cover or conceal the work below until the following applicable Items have been sianed. list Floor Shear Firesprinkler (Rough) (Fire Dept.) Mechanical Inspections 2nd Floor Shear Roof (SheathinglDiaphragm/Frame) Masonry (Reinf./Bond Beam/Pre-Grout) Rough Plumbing (Top Out) Rough Duct (Mechanical) Rough Mechanical Rough Electrical Rough COA/Mitagation Measures Plumbing Inspections Framing Only after Plbg Ere Mec & Fire) Insulation (Sound/Energy) Do not tape or plaster until the following applicable items have been signed. Drywall Drywall Penetrations (Ele, Mec & Plbg) Interior Lath Exterior Lath Electrical Inspections Electrical Service Meter -(Meter will be set within 2-3 business days after approval) Excludes New Exterior Plaster (Brown Coat) T-Bar (Struct., Ele., or Mec.) Grease Interceptor Sewer Water Engineering Backflow (Testable Only) Water Service