904 S CANYON HEIGHTS DR (3)Permit Types
BLDTLE MEC PFILMi_ -. X
Permit Number: BLD2025A0479
Issued: 01/30/2025
CITY OF ANAHEIM
wwwStratheim.net/building
(714)765-4626
Ou arter Section: 232
Site Address: 904 S CANYON HEIGHTS DR ANAHEIM, CA 92808
Legal Description: N TR 15123 BLK LOT 11
APN: 51408129
BUILDING DIVISION
200 S. ANAHEIM BLVD.
(714) 765 - 5153
Project Description: Electrical for residential EV charger inside the garage
Living Area:
Garage Area:
Carport Nea:
Balcony / Deck Area:
Cool Roof:
Number of Stories:
1 Valuation: 0.00
Construction Types: N/A
Occupancy Groups:
Fire Spmnklere is
Total Feu paid far Perot: 177.00
People Associated with Project:
Contractor SON POWER INDUSTRIES INC 31290 OAK CREST DRIVE,SUITE 6201804191145597830 WESTLAKE VILLAGE, CA 91359
Permit Applicant Sara Gelfand
Owner MAGUIRE, MARK JOSEPH TR 904 S CANYON HEIGHTS DR
Type Electrical Fixtures Oty Type Plumbing Fixtures Oty Mechanical Fixtures Oty
EV Charger 1
The permit shall expire by limitation and become null and void if the building or work has not passed final inspection 365 days from the
dale of permit issuance. A new permit is required to commence or continue work.
�PHEIM Cq
Cityof Anaheim OFP 7�o
Building Division y
. / •
.DVA`DED
Do not occupy this building until the final inspections have been made.
FINAL INSPECTIONS
D/ 'E INSPECTOR
All applicable items below must be signed before ubillgh are released
Final Gas Test
Electrical Final
Plumbing Final
Mechanical Final
Cross Connection Control (714) 765-4280
Engineering Final (714) 765-5126
INSPECTION I
DATE I
INSPECTOR
Fire Sprinkler (ONLY) (714) 765-5041
Do not pour concrete until the following applicable items have been signed
Fire Dept. Final (714) 765-5041
Plumbing (Ground/Underfloor Drain Waste)
Water Engineering (714) 765-4591
Electrical Ground Electrode/Ufer
Sub LisUBus. Lic. (714) 765-5194 (Allow 10 business days)
Setback/Forms/7renches (Footings)
COA/Migation Measures
Do not install subfloor or pow floor slab until the follwing applicable items have been
siccedBuilding
Final (714 765-5153)
Last Inspection -Final Only After Above Completed
Plumbing (Ground/Underfloor Water)
Underfloor Rough Gas
PARTIAL INSPECTIONS
Building Inspections
Mechanical (Groundwork)
Electrical (Underground Conduit)
Pre -slab (Compaction/Membrane Reinf.)
Floor (Joist/Girders)
Underfloor Insulation (Raised Foundation Only)
Floor Nailing (Raised Foundation Only)
2nd Floor (Floor Nailing)
Do, I cover or conceal the work below until the following applicable Items have
been sianed.
list Floor Shear
Firesprinkler (Rough) (Fire Dept.)
Mechanical Inspections
2nd Floor Shear
Roof (SheathinglDiaphragm/Frame)
Masonry (Reinf./Bond Beam/Pre-Grout)
Rough Plumbing (Top Out)
Rough Duct (Mechanical)
Rough Mechanical
Rough Electrical
Rough COA/Mitagation Measures
Plumbing Inspections
Framing Only after Plbg Ere Mec & Fire)
Insulation (Sound/Energy)
Do not tape or plaster until the following applicable items have been signed.
Drywall
Drywall Penetrations (Ele, Mec & Plbg)
Interior Lath
Exterior Lath
Electrical Inspections
Electrical Service Meter -(Meter will be set within 2-3
business days after approval) Excludes New
Exterior Plaster (Brown Coat)
T-Bar (Struct., Ele., or Mec.)
Grease Interceptor
Sewer
Water Engineering Backflow (Testable Only)
Water Service