Loading...
301 N BLUEROCK STPermit Types BLD ELE MEC PLM X Permit Number: BLD2025-01182 Issued: 03111/2025 www.anaheim.net/building (714)765-4626 Quarter Section: 161 Site Address: 301 N BLUEROCK STANAHEIM, Legal Description: N TR 6375 BLK LOT 25 APN: 35905705 CITY OF ANAHEIM BUILDING DIVISION 200 S. ANAHEIM BLVD. (7141 765. 5153 Project Description: Reroof. Tear off existing and reroof with Composition shingles 5i t- U �� 1. a C UNrl LI Living Area: Numberof Stones: 1 Valuation: 0.00 Garage Area: Construction Types: VB CarportAres: Occupancy Groups: Balcony / Deck Area: fire Sprinklared: No Cool Rocf: Total Fee. paid for Permit: 357.00 People Associated with Project: Contractor J ECHAVES INC DBAJH ROOFING 2415 SANTIAGO ST201909060858586290 SANTA ANA, CA 92706 Owner UTTER, WILLIAM C TR 301 N BLUEROCK ST Type Electrical Fixtures Cry Type Plumbing Fixtures Oty Mechanical Fixtures Oty The permit shall expire by limitation and become null and void if the building or work has not passed final Inspection 365 days from the date of permit issuance. A new permit is required to commence or continue work. df'N EIM cq City of Anaheim OF P C�0 Building Division i FINAL INSPECTIONS DATE INSPECTOR All applicable items below must be signed before utilities are released Final Gas Test Electrical Final Plumbing Final • Mechanical Final �OVNDED 1th' Cross Connection Control (714) 765.4280 Engineering Final (714) 765-5126 Do not occupy this building until the final inspections have been made. INSPECTION DATE INSPECTOR Fire Sprinkler (ONLY) (714) 7655041 Do not pour concrete until the following applicable items have been signed. Fire Dept. Final (714) 766.5041 Plumbing (Ground/Underfloor Drain Waste) Electrical Ground Electrode/Ufer Water Engineering (714) 7654591 Sub List/Bus. Lic. (714) 765-5194 (Allow 10 business days) Setback/Formsrrrenches (Footings) COAIMigation Measures ,stall subfloor or pour floor slab until the follmng applicable items have been Building Final (714 765-5153) S I �'Z �- Last Inspection -Final Only After Above Completed Plumbing (Ground/Underfloor Water) Underfloor Rough Gas PARTIAL INSPECTIONS Building Inspections Mechanical (Groundwork) Electrical (Underground Conduit) Pre -slab (Compaction/Membrane Reinf.) Floor (Joist/Girders) Underfloor Insulation (R=FoundationOnly)Floor Nailing (Raised Fo2nd Floor (Floor NailingDo not cover or conceal the following appiicabl2 items havebeen sioned 1st Floor Shear Firesprinkler (Rough) (FMechanical Inspections 2nd Floor Shear Roof(Sheathing/Diaphragm/Frame) 31o1S ,' Masonry (Reint/Bond Beam/Pre-Grout) Rough Plumbing (Top Out) Rough Duct (Mechanical) Rough Mechanical Rough Electrical Rough COAIMitagation Measures Plumbing Inspections Framing (Only after Plbg., Ele., Mec. & Fire) Insulation (Sound/Energy) Do not tape or plaster until the following applicable items have been signed. Drywall Drywall Penetrations (Ele, Moo 8 Plbg) Interior Lath Exterior Lath Electrical Inspections Electrical Service Meter -(Meter will be set within 2-3 business days after approval) Excludes New Exterior Plaster (BFBackfiow T-Bar (Struct., Ele. Grease Interceptor Sewer Water Engineeringble Only) Water Service ;'far CITY OF ANAHEIM BUILDING DEPARTMENT 200 S. Anaheim Blvd., Suite 145 Anaheim, CA 92805 714 765-5153 wwwanaheim.net/building SMOKE DETECTORS AND CARBON BUILDING DIVISION 2013 CALIFORNIA CODES cooecret¢ 01/01/2014 8FF@ ADATE MONOXIDE SELF CERTIFICATION Meted form to be on site along with the sob card. Permit Number: Ed) ZOZ5 —'D� k S-Z Date: Project address: pSO Property Owner: The undersigned does hereby certify that I am the property owner of the above referenced property. I further certify that smoke alarms and carbon monoxide alarms are present and functional in all the following locations. All boxes must be checked below pq Smoke Alarms and Carbon Monoxide Alarm: On the ceiling or wall outside of each separate / sleeping area in the immediate vicinity of bedroom/s or in each hallway outside of the rooms. Smoke Alarms: In each room used for sleeping purposes. Smoke Alarm and Carbon Monoxide Alarm: In each story, including any habitable basement; (Note: in dwellings or dwelling units with split levels and without an intervening door between the adjacent levels, a smoke alarm and a carbon monoxide detector installed on the upper level shall suffice for the adjacent lower level provided that the lower level is less than one full story below the upper level.) All dwelling units with attached garages require carbon monoxide detecto//s. Signature: Date: 3/ 2 �7 California Residential Code (CRC) Section R314.6.2,CRC R315.2 States in part that existing dwellings be "retrofitted with smoke detectors and carbon monoxide detectors when a building permit is issued for work on or in a building that is valued at $1,000 or more." CRC Section R314.3, CRC R315.2 defines required locations as indicted above. NOTE: This certification is only used when normal access to the interior of the dwelling by the City of Anaheim Inspector is not achieved during the course of project construction. It is normally used for exterior projects such as re -roofing, re -siding, patio covers, solar photovoltaic installations, and similar exterior construction work. 7200 S. Anaheim Blvd., Suite 145 Anaheim, California 92805 (714)765-5153 Phone (714)7654607 Fax SEPT 2015 www.anaheim.net/bullding B842