419 S SAN VICENTE LN (4)Permit Types
BLD EL_
MEC PLM
X
Permit Number: BLD202443220
Issued: 06/20/2024
www.anaheim.net/building
(714)765-4626
Quarter Section: 198
CITY OF ANAHEIM
BUILDING DIVISION
200 S. ANAHEIM BLVD.
(714)765. 5153
Site Address: 419 S SAN VICENTE LN, ANAHEIM, CA 92807
Legal Description: N TR 14353 BLK LOT 4 UN HOLD _
APN: 35618131 "
Project Description: Residential Remodel: To replace (2) retro-fit windows and (2) patio doors
Living Area: Number of Stones:
1 Valuation: 9,458.00
Garage Area:
Construction Types: N/A
Carport Area:
Occupancy Groups:
Balcony / Deck Area:
Fire Sprinklered:
Cool Roof.
Total Fees paid for Permit: 172.00
People Associated with Project:
Contractor HOME DEPOT U S A INC DBA THE HOME DEPO P O BOX 105451 ATTN LICENSE MANAGEMENT 200408130950507570 ATLANTA, GA 9280
Permit Applicant Ronald Stange
Owner HOLD PARCEL
Electrical Fixtures Qty Type Plumbing Fixtures Qty Mechanical Fixtures Qty
The permit shall expire by limitation and become null and void if the building or work has not passed final Inspection 365 days from the
date of permit issuance. A new permit is required to commence or continue work.
PNr,HE1M C,
rI
City of Anaheim of iO
Building Division F y
u >
�GUNoI:o ta"^
Do not occupy this building until the final inspections have been made.
FINAL INSPECTIONS
DATE
INSPECTOR
All applicable items below must be signed before utilities are released
Final Gas Test
Electrical Final
Plumbing Final
Mechanical Final
Cross Connection Control (714) 766-4280
Engineering Final (714) 765.5126
INSPECTION I
DATE I
INSPECTOR
Fire Sprinkler (ONLY) (714) 765.5041
Do not pour concrete until the following applicable items have been signed.
Fire Dept. Final (714) 765.5041
Plumbing (Ground/Underfloor Drain Waste)
Water Engineering (714) 765-4591
Electrical Ground ElectrodelUfer
Sub LisUBus. Lic. (714) 765.5194 (Allow 10 business days)
Setback/Forms/Trenches (Footings)
COAIMigation Measures
Do not install subfloor or pour floor slab until the follwing applicable items have beenscried
)
714766-5153
Building Final (714 766-5153
Last Inspection -Final Only After Above Completed
Plumbing (Ground/Underfloor Water)
Underfloor Rough Gas
PARTIAL INSPECTIONS
Building Inspections
Mechanical (Groundwork)
Electrical (Underground Conduit)
Pre -slab (Compaction/Membrane Reirri
Floor (Joist/Girders)
Underfloor Insulation (Raised Foundation Only)
Floor Nailing (Raised Foundation Only)
2nd Floor (Floor Nailing)
Do not cover or conceal the work below until the following applicable items have
been sr oned
1st Floor Shear
Firesprinkler (Rough) (Fire Dept.)
Mechanical Inspections
2nd Floor Shear
Roof (Sheathing/Diaphragm/Frame)
Masonry (Reinf.IBond Beam/Pre-Grout)
Rough Plumbing (Top Out)
Rough Duct (Mechanical)
Rough Mechanical
Rough Electrical
Rough COAIMitagation Measures
Plumbing Inspections
Framing (Only after Plbg.. Ell Mec. & Fire)
Insulation (Sound/Energy)
Do not tape or plaster until the following applicable items have been signed.
Drywall
Drywall Penetrations (Ele, Mec & Plbg)
Interior Lath
Exterior Lath
Electrical Inspections
Electrical Service Meter -(Meter will be set within 2-3
business days after approval) Excludes New
Construction
Exterior Plaster (Brown Coat)
T-Bar (Struct., Ele., or Mec.)
Grease Interceptor
(Do not backfill unless ginned offi
Sewer
Water Engineering Backflow, (Testable Only)
Water Service