Loading...
832 N HARBOR BLVDPermit Types BLD ELE ME C PLM X X X Permit Number: BLD2024-00713 Issued: 01/03/2025 www.anaheim. nettbuilding (714)765-0626 Quarter Section: 71 CITY OF ANAHEIM BUILDING DIVISION 200 S. ANAHEIM BLVD. (714)765. 5153 Site Address: 832 N HARBOR BLVD, ANAHEIM, CA 92805 Legal Description: N TR 601 BLK LOT 35 - APN: 03424106 Project Description: Residential Remodel: Construct new bay window at living room and repipe and installation of new gas line. REF INV2023-00308. Living Area: Number of stories: 1 Valuation 7,000.00 Garage Area: construction Types: VB Carport Area: Occupancy Groups: Balcony / Deck Area: Fire Sprinklered: No Cool Roof: Total Fees paid for Permit: 1,760.91 People Associated with Project: Owner TRAN, MONG TIEN 828 N HARBOR BLVD Contractor CALI FIRST REMODEL INC 15315 MAGNOLIA BLVD SUITE 429 SHERMAN OAKS, CA 91403 Engineer - Civil SAW MAALOUF 15445 VENTURA BLVD STE 367 SHERMAN OAKS, CA 91403 Type Electrical Fixtures Qty Type Plumbing Fixtures Qty Mechanical Fixtures Qty Water Distribution 1 Gas System (outlets) 1 The permit shall expire by limitation and become null and void if the building or work has not passed final Inspection 365 days from the date of permit issuance. A new permit is required to commence or continue work. roA (; �PHEIM C7 City of Anaheim 4 P T �O O Building Division I' DUN DED �$y^ Do not occupy this building until the final inspections have been made. FINAL INSPECTIONS DATE INSPECTOR All applicable items below must be signed before utilities are released Final Gas Test Electrical Final Plumbing Final i '-Zi .-.0 Mechanical Final Cross Connection Control (714) 765.4280 Engineering Final (714) 765-5126 INSPECTION I DATE I INSPECTOR Fire Sprinkler (ONLY) (714) 765-6041 Do not pour concrete until the following applicable items have been signed: Fire Dept. Final (714) 765-5041 Plumbing (Ground/Underfloor Drain Waste) Water Engineering (714) 765-4591 Electrical Ground Electrode/Ufer Sub List/Bus. Lic. (714) 765-5194 (Allow 10 business days) Setback/Forms/Trenches (Footings) COA/Migation Measures Do not install subfloor or pour floor slab until the follwing applicable items have been i n Bung Final (714 765-5153) Last Inspection -Final Only After Above Co mpletetl -_ Plumbing (Ground/Underfloor Water) Underfloor Rough Gas PARTIAL INSPECTIONS Building Inspections Mechanical (Groundwork) Electrical (Underground Conduit) Pre -slab (Compaction/Membrane Reinf.) Floor (Joist/Girders) Underfloor Insulation (Raised Foundation Only) Floor Nailing (Raised Foundation Only) 2nd Floor (Floor Nailing) Do not cover or conceal the work below until the following applicable items have been s 1 st Floor Shear Firesprinkler (Rough) (Fire Dept.) Mechanical Inspections 2nd Floor Shear Roof (Sheathing/Diaphragm/Frame) Masonry (Reinf./Bond Beam/Pre-Grout) Rough Plumbing (Top Out) Rough Duct (Mechanical) Rough Mechanical Rough Electrical Rough COA/Mitagation Measures Plumbing Inspections Framing (Only after Plbg., Ele., Mec- & Fire) _2 - G Insulation (Sound/Energy) Do not tape or plaster until the following applicable items have been signed. Drywall Drywall Penetrations (Ele, Mec & Plbg) Interior Lath Exterior Lath ; . Zr Electrical Inspections Electrical Service Meter -(Meter will be set within 2-3 business days after approval) Excludes New Construction Exterior Plaster (Brown Coat) _7-f C% T-Bar (Struct., Ele., or Mec.) Grease Interceptor (Do signed! off) not backfill unles, Sewer Water Engineering Backflow (Testable Only) Water Service