Permit Number: BLD2024-00713
Issued: 01/03/2025
www.anaheim. nettbuilding
(714)765-0626
Quarter Section: 71
CITY OF ANAHEIM
BUILDING DIVISION
200 S. ANAHEIM BLVD.
(714)765. 5153
Site Address: 832 N HARBOR BLVD, ANAHEIM, CA 92805
Legal Description: N TR 601 BLK LOT 35 -
APN: 03424106
Project Description: Residential Remodel: Construct new bay window at living room and repipe and installation of new gas line. REF
INV2023-00308.
Living Area:
Number of stories:
1 Valuation
7,000.00
Garage Area:
construction Types:
VB
Carport Area:
Occupancy Groups:
Balcony / Deck Area:
Fire Sprinklered:
No
Cool Roof:
Total Fees paid for Permit:
1,760.91
People Associated with Project:
Owner
TRAN, MONG TIEN
828 N HARBOR BLVD
Contractor
CALI FIRST REMODEL INC
15315 MAGNOLIA BLVD SUITE 429 SHERMAN OAKS, CA 91403
Engineer - Civil
SAW MAALOUF
15445 VENTURA BLVD STE 367 SHERMAN OAKS, CA 91403
Type
Electrical Fixtures Qty Type
Plumbing Fixtures Qty Mechanical Fixtures
Qty
Water Distribution
1 Gas System (outlets)
1
The permit shall expire by limitation and become null and void if the building or work has not passed final Inspection 365 days from the
date of permit issuance. A new permit is required to commence or continue work.
roA
(; �PHEIM C7
City of Anaheim 4 P T
�O O
Building Division
I'
DUN DED �$y^
Do not occupy this building until the final inspections have been made.
FINAL INSPECTIONS DATE
INSPECTOR
All applicable items below must be signed before utilities are released
Final Gas Test
Electrical Final
Plumbing Final i
'-Zi
.-.0
Mechanical Final
Cross Connection Control (714) 765.4280
Engineering Final (714) 765-5126
INSPECTION
I DATE
I INSPECTOR
Fire Sprinkler (ONLY) (714) 765-6041
Do not pour concrete until the following applicable items have been signed:
Fire Dept. Final (714) 765-5041
Plumbing (Ground/Underfloor Drain Waste)
Water Engineering (714) 765-4591
Electrical Ground Electrode/Ufer
Sub List/Bus. Lic. (714) 765-5194 (Allow 10 business days)
Setback/Forms/Trenches (Footings)
COA/Migation Measures
Do not install subfloor or pour floor slab until the follwing applicable items have been
i n
Bung Final (714 765-5153)
Last Inspection -Final Only After Above Co mpletetl
-_
Plumbing (Ground/Underfloor Water)
Underfloor Rough Gas
PARTIAL INSPECTIONS
Building Inspections
Mechanical (Groundwork)
Electrical (Underground Conduit)
Pre -slab (Compaction/Membrane Reinf.)
Floor (Joist/Girders)
Underfloor Insulation (Raised Foundation Only)
Floor Nailing (Raised Foundation Only)
2nd Floor (Floor Nailing)
Do not cover or conceal the work below until the following applicable items have
been s
1 st Floor Shear
Firesprinkler (Rough) (Fire Dept.)
Mechanical Inspections
2nd Floor Shear
Roof (Sheathing/Diaphragm/Frame)
Masonry (Reinf./Bond Beam/Pre-Grout)
Rough Plumbing (Top Out)
Rough Duct (Mechanical)
Rough Mechanical
Rough Electrical
Rough COA/Mitagation Measures
Plumbing Inspections
Framing (Only after Plbg., Ele., Mec- & Fire)
_2 -
G
Insulation (Sound/Energy)
Do not tape or plaster until the following applicable items have been signed.
Drywall
Drywall Penetrations (Ele, Mec & Plbg)
Interior Lath
Exterior Lath
; . Zr
Electrical Inspections
Electrical Service Meter -(Meter will be set within 2-3
business days after approval) Excludes New
Construction
Exterior Plaster (Brown Coat)
_7-f
C%
T-Bar (Struct., Ele., or Mec.)
Grease Interceptor
(Do signed! off)
not backfill unles,
Sewer
Water Engineering Backflow (Testable Only)
Water Service