Loading...
4790 E WESLEY DRPermit Types BLD ELE MEC PLM X Permit Number: BLD2010-04638 Issued: 12/09/2010 INSPECTION REQUEST LINE: (714) 765 - 4626 Quarter Section: 165 Site Address: 4790 E W ESLEY DR Legal Description: P BK 222 PG 31 PAR 9 CITY OF ANAHEIM BUILDING DIVISION 200 S. ANAHEIM BLVD. (714) 765 - 5153 Project Description: Electric to upgrade service panel from 400 to 800 amps service and relocate subpanel. Valuation: Construcion Types: N/A, , Fire Sprinklered? No Cool Roof No Total Fees paid for Permit: 342.00 People Associated with Project: Owner CONSTATIN/MARIA FALCUSAN 3120 MARYWOOD DR ORANGE CA 92867-2002 Permit Applicant CONSTATIN FALCUSAN Type Electrical Fixtures Qty Type Plumbing Fixtures Qty Type Mechanical Fixtures Qty Sub PanelfTemp Pwr - < 600 V, 0 < amps 1 <= 200 Meter/Disc Sw - < 600 V, 500 < amps <= 1 1000 The permit shall expire by limitation and become null and void if the building or work has not passed final inspection 365 days from the date of permit issuance. A new permit is required to commence or continue work. tbidpe"it_cornbo City of Anaheim Building Division Do not occupy this building until the final inspections have been made. BUILDING PERMIT DOES NOT AUTHORIZE ELECTRICAL, PLUMBING, OR MECHANICAL INSTALLATIONS - SEPARATE PERMITS ARE REQUIRED. INSPECTION I DATE I INSPECTOR Do not pour concrete until the following applicable items have been signed: Plumbing (Ground/Underfloor Drain Waste) Electrical Ground ElectrodelUfer Setback/Forms/Trenches (Footings) Do not install subfloor or pour Floor slab until the follwing applicable items have been signed: Plumbing (Ground/Underfloor Water) Underfloor Rough Gas Mechanical (Groundwork) Electrical (Underground Conduit) Pre -slab (Compaction/Membrane Reinf.) Floor (Joist/Girdem) Underfloor Insulation (Raised Foundation Only) 2nd Floor (Floor Nailing) Do not cover or conceal the work below until the following applicable items have been signed: tat Floor Shear Firesprinkler (Rough) (Fire Dept.) 2nd Floor Shear Roof(Sheathing/Diaphragm/Frame) Masonry (ReirddBond Beam/Pre-Grout) Rough Plumbing (Top Out) Rough Duct (Mechanical) Rough Mechanical Rough Electrical Framing (Only after Plbg., Ele., Mec. 8 Fire) Insulation(Sound/Energy) Do not tape or plaster until the following applicable items have been signed: Drywall Drywall Penetrations (Ele., Mec. & Plbg.) Interior Lath Exterior Lath GENERAL ITEMS Electrical Service Meter Exterior Plaster (Brown Coat) T-Bar (Struct., Ele., or Mec.) Sewer Water Engineering Backflow (Testable Only) Water Service All applicable items below must be signed before utilities will be released FINAL INSPECTIONS DATE INSPECTOR Final Gas Test Electrical Final Plumbing Final Mechanical Final Cross Connection Control ptq res.aeu Engineering/Grading Final p14775s5+¢5 Fire Dept. Final (714) 765.5041 Fire Sprinkler Final (714) 765.5041 Water Engineering (714) 765.4591 Sub List/Business License (714) 765-5194 Zoning (714) 765-5139 Building Final (Last Inspection - Only After Above Complete) FINAL INSPECTION must be approved by the Building Division. PARTIAL INSPECTIONS Building Inspections Mechanical Inspections Plumbing Inspections Electrical Inspections T Permit Backs Master-2008.xis