4790 E WESLEY DRPermit Types
BLD ELE MEC PLM
X
Permit Number: BLD2010-04638
Issued: 12/09/2010
INSPECTION REQUEST LINE:
(714) 765 - 4626
Quarter Section: 165
Site Address: 4790 E W ESLEY DR
Legal Description: P BK 222 PG 31 PAR 9
CITY OF ANAHEIM
BUILDING DIVISION
200 S. ANAHEIM BLVD.
(714) 765 - 5153
Project Description: Electric to upgrade service panel from 400 to 800 amps service and relocate subpanel.
Valuation:
Construcion Types:
N/A, ,
Fire Sprinklered?
No
Cool Roof
No
Total Fees paid for Permit:
342.00
People Associated with Project:
Owner CONSTATIN/MARIA FALCUSAN 3120 MARYWOOD DR ORANGE CA 92867-2002
Permit Applicant CONSTATIN FALCUSAN
Type Electrical Fixtures Qty Type Plumbing Fixtures Qty Type Mechanical Fixtures Qty
Sub PanelfTemp Pwr - < 600 V, 0 < amps 1
<= 200
Meter/Disc Sw - < 600 V, 500 < amps <= 1
1000
The permit shall expire by limitation and become null and void if the building or work has not passed final inspection 365 days from the date of
permit issuance. A new permit is required to commence or continue work. tbidpe"it_cornbo
City of Anaheim
Building Division
Do not occupy this building until the final inspections have been made.
BUILDING PERMIT DOES NOT AUTHORIZE ELECTRICAL, PLUMBING, OR
MECHANICAL INSTALLATIONS - SEPARATE PERMITS ARE REQUIRED.
INSPECTION I DATE I INSPECTOR
Do not pour concrete until the following applicable items have been signed:
Plumbing (Ground/Underfloor Drain Waste)
Electrical Ground ElectrodelUfer
Setback/Forms/Trenches (Footings)
Do not install subfloor or pour Floor slab until the follwing applicable items have
been signed:
Plumbing (Ground/Underfloor Water)
Underfloor Rough Gas
Mechanical (Groundwork)
Electrical (Underground Conduit)
Pre -slab (Compaction/Membrane Reinf.)
Floor (Joist/Girdem)
Underfloor Insulation (Raised Foundation Only)
2nd Floor (Floor Nailing)
Do not cover or conceal the work below until the following applicable items have
been signed:
tat Floor Shear
Firesprinkler (Rough) (Fire Dept.)
2nd Floor Shear
Roof(Sheathing/Diaphragm/Frame)
Masonry (ReirddBond Beam/Pre-Grout)
Rough Plumbing (Top Out)
Rough Duct (Mechanical)
Rough Mechanical
Rough Electrical
Framing (Only after Plbg., Ele., Mec. 8 Fire)
Insulation(Sound/Energy)
Do not tape or plaster until the following applicable items have been signed:
Drywall
Drywall Penetrations (Ele., Mec. & Plbg.)
Interior Lath
Exterior Lath
GENERAL ITEMS
Electrical Service Meter
Exterior Plaster (Brown Coat)
T-Bar (Struct., Ele., or Mec.)
Sewer
Water Engineering Backflow (Testable Only)
Water Service
All applicable items below must be signed before utilities will be released
FINAL INSPECTIONS
DATE
INSPECTOR
Final Gas Test
Electrical Final
Plumbing Final
Mechanical Final
Cross Connection Control ptq res.aeu
Engineering/Grading Final p14775s5+¢5
Fire Dept. Final (714) 765.5041
Fire Sprinkler Final (714) 765.5041
Water Engineering (714) 765.4591
Sub List/Business License (714) 765-5194
Zoning (714) 765-5139
Building Final (Last Inspection -
Only After Above Complete)
FINAL INSPECTION must be approved by the Building Division.
PARTIAL INSPECTIONS
Building Inspections
Mechanical Inspections
Plumbing Inspections
Electrical Inspections