Loading...
969 N NATALIE LNPermit Types LLD ELE MEC PLM X Permit Number: BLD2025-00172 Issued: 01/13/2025 www.anaheim. net/building (714)765-4626 Quarter Section: 215 Site Address: 969 S NATALIE LN ANAHEIM, CA 92808 Legal Description: N TR 12685 BLK LOT 12 APN: 35655212 CITY OF ANAHEIM BUILDING DIVISION 200 S. ANAHEIM BLVD. (714)765. 5153 Project Description: Residential Remodel: To replace (3) retro fit windows and (1) patio door Living Area: Garage Area: Carport Area: Balcony / Deck Area: Cool Root Number of Stories. 1 Valuation: Construction Types: Occupancy Groups: Fire Sprinklered: Total Fees paid for Permit: 7,809.95 VB 177.00 People Associated with Project: Contractor THE HOME DEPOT P 0 BOX 105451 ATTN LICENSE MANAGEMENT 200408130950507570 ATLANTA, GA 9280: Permit Applicant Ronald Stange Owner KOBE EBRAHIMI ALDEN 969 S NATALIE LN Type Electrical Fixtures Cry Type Plumbing Fixtures Qty Mechanical Fixtures Qty The permit shall expire by limitation and become null and void if the building or work has not passed final inspection 365 days from the date of permit Issuance. A new permit is required to commence or continue work. PNPNEIM cq< Cityof Anaheim D4 io Building DIVISION F i > DVNDED �$h^ Do not occupy this building until the final inspections have been made. FINAL INSPECTIONS DATE INSPECTOR All applicable items below must be signed before utilities are released Final Gas Test Electrical Final Plumbing Final Mechanical Final Cross Connection Control (714) 765-4280 Engineering Final (714) 765-6126 INSPECTION I DATE I INSPECTOR Fire Sprinkler (ONLY) (714) 765-5041 Do not pour concrete until the following applicable items have been signed: Fire Dept. Final (714) 765-5041 Plumbing (Ground/Underfloor Drain Waste) Water Engineering (714) 765.4591 Electrical Ground ElectrodelUfer Sub List/Bus. Lic. (714) 765-6194 (Allow 10 business days) SetbacklFormslTrenches (Footings) COAIMigation Measures Do not install subfloor or pour floor slab until the follwing applicable items have been sinned Building Final (714765-5153) Last InspectionTinal Only After Above Completed 'LJI�Il� M Plumbing (Ground/Underfloor Water) Underfloor Rough Gas PARTIAL INSPECTIONS Building Inspections Mechanical (Groundwork) Electrical (Underground Conduit) Pre -slab (Compaction/Membrane Reinf.) Floor (JoisUGirders) Underfloor Insulation (Raised Foundation Only) Floor Nailing (Raised Foundation Only) 2nd Floor (Floor Nailing) Do not cover or conceal the work below until the following applicable items have 1st Floor Shear Firesprinkler (Rough) (Fire Dept.) Mechanical Inspections 2nd Floor Shear Roof (SheathinglDiaphragmlFrame) Masonry (Reinf.IBond Beam/Pre-Grout) Rough Plumbing (Top Out) Rough Duct (Mechanical) Rough Mechanical Rough Electrical Rough COAIMitagation Measures Plumbing Inspections Framing (Only after Plbg., Ele., Mec. 8 Fire) Insulation (Sound/Energy) Do not tape or plaster until the following applicable items have been signed' Drywall Drywall Penetrations (Ele, Mec B Plbg) Interior Lath Exterior Lath Electrical Inspections Electrical Service Meter -(Meter will be set within 2-3 business days after approval) Excludes New Construction Exterior Plaster (Brown Coat) T-Bar (Struct., Ele., or Mec.) Grease Interceptor Sewer Water Engineering Backflow (Testable Only) Water Service