299 N PASEO RIO BLANCO (3)Permit Types
BLD 1 ELE MEC PLM
X
Permit Number: BLD2026-01437
Issued: 03/25/2025
www.anaheim.net/buildlng
(714)765-4626
Quarter Section: 190
CITY OF ANAHEIM
BUILDING DIVISION
200 S. ANAHEIM BLVD.
(714) 765 - 5153
Site Address: 299 N PASEO RIO BLANCO ANAHEIM, CA 92807
Legal Description: N TR 8080 BLK LOT 31
APN: 35814342
Project Description: Electrical: 200amp main panel upgrade
Living Area: Number of Stones:
1 Valuation:
0.00
Garage Area:
Construction Types:
N/A
CarportArea:
Occupancy Groups:
Balcony / Deck Area:
Fire Sprinklered:
Cool Roof:
Total Fees paid for Permit:
177.00
People Associated with Project:
Contractor EPIC ELECTRIC
41775 ELM STREET SUITE 201 MURRIETA, CA
Permit Applicant Danny Ciminski
41775 Elm St 201 Murrieta, CA 92562
Owner PALAMARA, JOSEPH P 8 LINDA M
229 N PASEO RIO BLANCO
Type Electrical Fixtures Qty Type
Plumbing Fixtures Qty Mechanical Fixtures
Qty
Meter/Disc Sw- Under 600 V, up to 200 1
amps
The permit shall expire by limitation and become null and void if the building or work has not passed final inspection 365 days from the
date of permit issuance. A new permit is required to commence or continue work.
City of Anaheim P�p.REIM ,
DF io
Building Division f y
u a
DEC) tad^
Do not occupy this building until the final inspections have been made.
FINAL INSPECTIONS
DATE
INSPECTOR
All applicable items below must be signed before utilities are released
Final Gas Test
Electrical Final
Plumbing Final
Mechanical Final
Cross Connection Control (714) 765.4280
Engineering Final (714) 765-5126
INSPECTION
I DATE
I INSPECTOR
Fire Sprinkler (ONLY) (714) 765-5041
Do not pour concrete until the following applicable items have been signed:
Fire Dept. Final (714) 765-5041
Plumbing (Ground/Underfloor Drain Waste)
Water Engineering (714) 765d591
Electrical Ground Electrode/Ufer
Sub LIsVBus. Lic. (714) 765-5194 (Allow 10 business days)
Setback/FormsfTrenches (Footings)
COAIMigation Measures
Do not install subfloor or pour floor slab until the follwing applicable items have been
sianed
Building Final (714 765-6153)
Last Inspection -Final Only After Above Completed
Plumbing (Ground/Underfloor Water)
Underfloor Rough Gas
PARTIAL INSPECTIONS
Building Inspections
Mechanical (Groundwork)
Electrical (Underground Conduit)
Pre -slab (Compaction/Membrane Reinf.)
Floor (JoisUGirdem)
Underfloor Insulation (Raised Foundation Only)
Floor Nailing (Raised Foundation Only)
2nd Floor (Floor Nailing)
Do not cover or conceal the work below until the follow mg applicable items have
been sinned
tat Floor Shear
Firesprinkler (Rough) (Fire Dept.)
Mechanical Inspections
2nd Floor Shear
Roof (Sheathing/Diaphragm/Frame)
Masonry (Reinf./Bond Beam/Pre-Grout)
Rough Plumbing (Top Out)
Rough Duct (Mechanical)
Rough Mechanical
Rough Electrical
Rough COAIMitagation Measures
Plumbing Inspections
Framing (Only after Plbg., Ele., Mec. & Fire)
Insulation (Sound/Energy)
Do not tape or plaster until the following applicable items have been signed:
Drywall
Drywall Penetrations (Ele, Mec & Plbg)
Interior Lath
Exterior Lath
Electrical Inspections
Electrical Service Meter -(Meter will be set within 2-3
business days after approval) Excludes New
Conqtriirtinn
f1 /
Exterior Plaster (Brown Coat)
T-Bar (Struct., Ele., or Mec.)
Grease Interceptor
(Do not hackfill unless toned off)
Sewer
Water Engineering Backflow (Testable Only)
Water Service