Loading...
299 N PASEO RIO BLANCO (3)Permit Types BLD 1 ELE MEC PLM X Permit Number: BLD2026-01437 Issued: 03/25/2025 www.anaheim.net/buildlng (714)765-4626 Quarter Section: 190 CITY OF ANAHEIM BUILDING DIVISION 200 S. ANAHEIM BLVD. (714) 765 - 5153 Site Address: 299 N PASEO RIO BLANCO ANAHEIM, CA 92807 Legal Description: N TR 8080 BLK LOT 31 APN: 35814342 Project Description: Electrical: 200amp main panel upgrade Living Area: Number of Stones: 1 Valuation: 0.00 Garage Area: Construction Types: N/A CarportArea: Occupancy Groups: Balcony / Deck Area: Fire Sprinklered: Cool Roof: Total Fees paid for Permit: 177.00 People Associated with Project: Contractor EPIC ELECTRIC 41775 ELM STREET SUITE 201 MURRIETA, CA Permit Applicant Danny Ciminski 41775 Elm St 201 Murrieta, CA 92562 Owner PALAMARA, JOSEPH P 8 LINDA M 229 N PASEO RIO BLANCO Type Electrical Fixtures Qty Type Plumbing Fixtures Qty Mechanical Fixtures Qty Meter/Disc Sw- Under 600 V, up to 200 1 amps The permit shall expire by limitation and become null and void if the building or work has not passed final inspection 365 days from the date of permit issuance. A new permit is required to commence or continue work. City of Anaheim P�p.REIM , DF io Building Division f y u a DEC) tad^ Do not occupy this building until the final inspections have been made. FINAL INSPECTIONS DATE INSPECTOR All applicable items below must be signed before utilities are released Final Gas Test Electrical Final Plumbing Final Mechanical Final Cross Connection Control (714) 765.4280 Engineering Final (714) 765-5126 INSPECTION I DATE I INSPECTOR Fire Sprinkler (ONLY) (714) 765-5041 Do not pour concrete until the following applicable items have been signed: Fire Dept. Final (714) 765-5041 Plumbing (Ground/Underfloor Drain Waste) Water Engineering (714) 765d591 Electrical Ground Electrode/Ufer Sub LIsVBus. Lic. (714) 765-5194 (Allow 10 business days) Setback/FormsfTrenches (Footings) COAIMigation Measures Do not install subfloor or pour floor slab until the follwing applicable items have been sianed Building Final (714 765-6153) Last Inspection -Final Only After Above Completed Plumbing (Ground/Underfloor Water) Underfloor Rough Gas PARTIAL INSPECTIONS Building Inspections Mechanical (Groundwork) Electrical (Underground Conduit) Pre -slab (Compaction/Membrane Reinf.) Floor (JoisUGirdem) Underfloor Insulation (Raised Foundation Only) Floor Nailing (Raised Foundation Only) 2nd Floor (Floor Nailing) Do not cover or conceal the work below until the follow mg applicable items have been sinned tat Floor Shear Firesprinkler (Rough) (Fire Dept.) Mechanical Inspections 2nd Floor Shear Roof (Sheathing/Diaphragm/Frame) Masonry (Reinf./Bond Beam/Pre-Grout) Rough Plumbing (Top Out) Rough Duct (Mechanical) Rough Mechanical Rough Electrical Rough COAIMitagation Measures Plumbing Inspections Framing (Only after Plbg., Ele., Mec. & Fire) Insulation (Sound/Energy) Do not tape or plaster until the following applicable items have been signed: Drywall Drywall Penetrations (Ele, Mec & Plbg) Interior Lath Exterior Lath Electrical Inspections Electrical Service Meter -(Meter will be set within 2-3 business days after approval) Excludes New Conqtriirtinn f1 / Exterior Plaster (Brown Coat) T-Bar (Struct., Ele., or Mec.) Grease Interceptor (Do not hackfill unless toned off) Sewer Water Engineering Backflow (Testable Only) Water Service