Loading...
3170-3178 E LA PALMA AVE (2)Permit Types BLD ELE MEC PLM X Permit Number: BLD2024-04529 Issued: 08/29/2024 www.anatheim.net/bulding (714)765-4626 Quarter Section: 145 CITY OF ANAHEIM BUILDING DIVISION 200 S. ANAHEIM BLVD. (714) 765 - 5153 Site Address: 3170-3178 E LA PALMA AVE, ANAHEIM, CA 92806 Legal Description: P BK 55 PG 47 PAR 2 APN: 34511105� Project Description: Reroof: Remove and install (140) sq of flat roof over portion of the structure (Units 3170-3178) Living Area: Number of Stories: 1 Valuation: 54,000.00 Ganage Area: Construction Types: N/A Carport Area: Occupancy Groups: Balcony I Deck Area: Fire Sprinklered: Cool Roof: Total Fees paid for Permit: 629.12 People Associated with Project: Contractor PALACIO ROOFING 6773 ASTER COURTABCDE11156499 CHINO, CA 91710 Permit Applicant ROBERT D PALACIO 6773 ASTER CT CHINO, CA 91710 0000 Owner FOWLER, DALE E TR 3178 E LA PALMA AVE Type Electrical Fixtures Oty Type Plumbing Fixtures Oty Mechanical Fixtures The permit shall expire by limitation and become null and void if the building or work has not passed final Inspection 365 days from the date of permit issuance. A new permit Is required to commence or continue work. :-_ k PNpHEIM cq( Cityof Anaheim O� io Building Division F ? > �OVN DED k- Do not occupy this building until the final inspections have been made. FINAL INSPECTIONS DATE INSPECTOR All applicable items below must be signed before utilities are released Final Gas Test Electrical Final Plumbing Final Mechanical Final Cross Connection Control (714) 765-4280 Engineering Final (714) 765-5126 INSPECTION I DATE I INSPECTOR Fire Sprinkler (ONLY) (714) 7655041 Do not pour concrete until the following applicable items have been signed: Fire Dept. Final (714) 7655041 Plumbing (Ground/Underfloor Drain Waste) Water Engineering (714) 765-4591 Electrical Ground ElectrodelUfer Sub List/Bus. Lic. (714) 765-5194 (Allow 10 business days) Setback/Forms/Trenches (Footings) COA/Migation Measures Do not install subfloor or pour Floor slab until the follwing applicable items have been sioned: Building Final (714 765-5153) Last Inspection -Final Only After Above Completed a\ Plumbing(Ground/Underfloor Water) Underfloor Rough Gas PARTIAL INSPECTIONS Building Inspections Mechanical (Groundwork) Electrical (Underground Conduit) Pre -slab (Compaction/Membrane Reinf.) Floor (Joist/Girders) Underfloor Insulation (Raised Foundation Only) Floor Nailing (Raised Foundation Only) 2nd Floor (Floor Nailing) Do not cover or conceal the work below until the fallowing applicable items have been signed: list Floor Shear Firesprinkler (Rough) (Fire Dept.) Mechanical Inspections - 2nd Floor Shear Roof (Sheathing/Diaphragm/Frame) p Masonry (Reinf./Bond Beam/Pre-Grout) Rough Plumbing (Top Out) Rough Duct (Mechanical) Rough Mechanical Rough Electrical Rough COA/Mitagation Measures Plumbing Inspections Framing (Only after Plbg.. Ele., Mee. & Fire) Insulation (Sound/Energy) Do not tape or plaster until the following applicable items have been signed. Drywall Drywall Penetrations (Ele, Mec & Plbg) Interior Lath Exterior Lath Electrical Inspections Electrical Service Meter -(Meter will be set within 2-3 business days after approval) Excludes New Exterior Plaster (Brown Coat) T-Bar (Struct., Ele., or Mec.) Grease Interceptor (Do not backf 11 unless sinned off) Sewer Water Engineering Backflow, (Testable Only) Water Service