Loading...
2253 E VERMONT AVEPermit Types BLD ELE MEC PLM X CITY OF ANAНЕІM BUILDING DIVISION 200 S. ANAHEIM BLVD. (714) 765-5153 Permit Number: BLD2024-06199 Issued: 01/14/2025 www.anaheim.net/building (714)765-4626 Quarter Section: 114 Site Address: 2253 E VERMONT AVE Anaheim, CA 92806 Legal Description: N TR 6809 BLK LOT 115 APN: 25313221 Project Description: Seismic Retrofit: Voluntary seismic retrofit IM CALIFORTY OF ANAHEIMOUNDED 18 185 Living Area: Garage Area: Carport Area: Balcony/ Deck Area: Cool Roof: People Associated with Project: Contractor Permit Applicant Owner Number of Stories:1 J&AMP:C RETROFIT CONSTRUCTION INC Iris Lopez TING, BEBE S TR TING Valuation: Construction Types: Occupancy Groups: Fire Sprinklered: Total Fees paid for Permit: 4,000.00 N/A No 518.52 1477 W MARTIN LUTHER KING BLVD202101201316472406 LOS ANGELES. CA 90044 2253 E VERMONT AVE Type Electrical Fixtures Qty Type Plumbing Fixtures Qty Mechanical Fixtures Qty The permit shall expire by limitation and become null and void if the building or work has not passed final inspection 365 days from the date of permit issuance. A new permit is required to commence or continue work. City of Anaheim Building Division OF ANAHEIM CALIFOР OUNDED 1851 Do not occupy this building until the final inspections have been made. INSPECTION DATE INSPECTOR Do not pour concrete until the following applicable items have been signed: Plumbing (Ground/Underfloor Drain Waste) Electrical Ground Electrode/Ufer Setback/Forms/Trenches (Footings) Do not install subfloor or pour floor slab until the follwing applicable items have been signed: Plumbing (Ground/Underfloor Water) Underfloor Rough Gas Mechanical (Groundwork) Electrical (Underground Conduit) Pre-slab (Compaction/Membrane Reinf.) Floor (Joist/Girders) Underfloor Insulation (Raised Foundation Only) Floor Nailing (Raised Foundation Only) 2nd Floor (Floor Nailing) Do not cover or conceal the work below until the following applicable items have been signed: 1st Floor Shear Firesprinkler (Rough) (Fire Dept.) 2nd Floor Shear Roof (Sheathing/Diaphragm/Frame) Masonry (Reinf./Bond Beam/Pre-Grout) Rough Plumbing (Top Out) Rough Duct (Mechanical) Rough Mechanical Rough Electrical Rough COA/Mitagation Measures Framing (Only after Plbg., Ele., Mec. & Fire) Insulation (Sound/Energy) Do not tape or plaster until the following applicable items have been signed: Drywall Drywall Penetrations (Ele, Mec & Plbg) Interior Lath Exterior Lath Electrical Service Meter-(Meter will be set within 2-3 FINAL INSPECTIONS DATE INSPECTOR All applicable items below must be signed before utilities are released Final Gas Test Electrical Final Plumbing Final Mechanical Final Cross Connection Control (714) 765-4280 Engineering Final (714) 765-5126 Fire Sprinkler (ONLY) (714) 765-5041 Fire Dept. Final (714) 765-5041 Water Engineering (714) 765-4591 Sub List/Bus. Lic. (714) 765-5194 (Allow 10 business days) COA/Migation Measures Building Final (714 765-5153) Last Inspection-Final Only After Above Completed 4/20/25 J5C PARTIAL INSPECTIONS Building Inspections Mechanical Inspections Plumbing Inspections Electrical Inspections business days after approval) Excludes New Construction Exterior Plaster (Brown Coat) T-Bar (Struct., Ele., or Mec.) Grease Interceptor (Do not backfill unless sianed off) Sewer Water Engineering Backflow (Testable Only) Water Service