2253 E VERMONT AVEPermit Types
BLD ELE MEC PLM
X
CITY OF ANAНЕІM
BUILDING DIVISION
200 S. ANAHEIM BLVD.
(714) 765-5153
Permit Number: BLD2024-06199
Issued: 01/14/2025
www.anaheim.net/building
(714)765-4626
Quarter Section: 114
Site Address: 2253 E VERMONT AVE Anaheim, CA 92806
Legal Description: N TR 6809 BLK LOT 115
APN: 25313221
Project Description: Seismic Retrofit: Voluntary seismic retrofit IM CALIFORTY OF ANAHEIMOUNDED 18
185
Living Area:
Garage Area:
Carport Area:
Balcony/ Deck Area:
Cool Roof:
People Associated with Project:
Contractor
Permit Applicant
Owner
Number of Stories:1
J&:C RETROFIT CONSTRUCTION INC
Iris Lopez
TING, BEBE S TR TING
Valuation:
Construction Types:
Occupancy Groups:
Fire Sprinklered:
Total Fees paid for Permit:
4,000.00
N/A
No
518.52
1477 W MARTIN LUTHER KING BLVD202101201316472406 LOS ANGELES. CA 90044
2253 E VERMONT AVE
Type Electrical Fixtures Qty Type Plumbing Fixtures Qty Mechanical Fixtures Qty
The permit shall expire by limitation and become null and void if the building or work has not passed final inspection 365 days from the
date of permit issuance. A new permit is required to commence or continue work.
City of Anaheim
Building Division
OF ANAHEIM CALIFOР
OUNDED 1851
Do not occupy this building until the final inspections have been made.
INSPECTION DATE INSPECTOR
Do not pour concrete until the following applicable items have been signed:
Plumbing (Ground/Underfloor Drain Waste)
Electrical Ground Electrode/Ufer
Setback/Forms/Trenches (Footings)
Do not install subfloor or pour floor slab until the follwing applicable items have been
signed:
Plumbing (Ground/Underfloor Water)
Underfloor Rough Gas
Mechanical (Groundwork)
Electrical (Underground Conduit)
Pre-slab (Compaction/Membrane Reinf.)
Floor (Joist/Girders)
Underfloor Insulation (Raised Foundation Only)
Floor Nailing (Raised Foundation Only)
2nd Floor (Floor Nailing)
Do not cover or conceal the work below until the following applicable items have
been signed:
1st Floor Shear
Firesprinkler (Rough) (Fire Dept.)
2nd Floor Shear
Roof (Sheathing/Diaphragm/Frame)
Masonry (Reinf./Bond Beam/Pre-Grout)
Rough Plumbing (Top Out)
Rough Duct (Mechanical)
Rough Mechanical
Rough Electrical
Rough COA/Mitagation Measures
Framing (Only after Plbg., Ele., Mec. & Fire)
Insulation (Sound/Energy)
Do not tape or plaster until the following applicable items have been signed:
Drywall
Drywall Penetrations (Ele, Mec & Plbg)
Interior Lath
Exterior Lath
Electrical Service Meter-(Meter will be set within 2-3
FINAL INSPECTIONS DATE INSPECTOR
All applicable items below must be signed before utilities are released
Final Gas Test
Electrical Final
Plumbing Final
Mechanical Final
Cross Connection Control (714) 765-4280
Engineering Final (714) 765-5126
Fire Sprinkler (ONLY) (714) 765-5041
Fire Dept. Final (714) 765-5041
Water Engineering (714) 765-4591
Sub List/Bus. Lic. (714) 765-5194 (Allow 10 business days)
COA/Migation Measures
Building Final (714 765-5153)
Last Inspection-Final Only After Above Completed 4/20/25 J5C
PARTIAL INSPECTIONS
Building Inspections
Mechanical Inspections
Plumbing Inspections
Electrical Inspections
business days after approval) Excludes New
Construction
Exterior Plaster (Brown Coat)
T-Bar (Struct., Ele., or Mec.)
Grease Interceptor
(Do not backfill unless sianed off)
Sewer
Water Engineering Backflow (Testable Only)
Water Service