Loading...
1177 W LOCUST AVE (4)Permit Types BLD ELE MEC PLM X X Permit Number: BLD2025-01039 Issued: 04/14/2025 CITY OF ANAHEIM BUILDING DIVISION 200 S. ANAHEIM BLVD. (714) 765-5153 F ANAHEIM CALIF 50 www.anaheim.net/building (714)765-4626 Quarter Section: 64 Site Address: 1177 W LOCUST AVE ANAHEIM, CA 92802 Legal Description: N TR 1394 BLK LOT 26 APN: 03629112 Project Description: Residential Remodel: To install washer/ dryer & drywall throughout garage with electrical. Living Area: Garage Area: Carport Area: Balcony/ Deck Area: Cool Roof People Associated with Project: Number of Stories:2 Valuation: Construction Types: Occupancy Groups: Fire Sprinklered: Total Fees paid for Permit: OUNDEDD 1851 5,000.00 VB 992.65 Owner KUNG, HOWARD Type Electrical Fixtures Receptacle, switches, lights Qty 1177 W LOCUST AVE Plumbing Fixtures QtyType Gas System (outlets) Laundry Tray 1 Mechanical Fixtures Qty Heating Appliances, including vent The permit shall expire by limitation and become null and void if the building or work has not passed final inspection 365 days from the date of permit issuance. A new permit is required to commence or continue work. City of Anaheim Building Division OF ANAHEIM CALIFOВ FOUNDED 181851 Do not occupy this building until the final inspections have been made. INSPECTION DATE INSPECTOR Do not pour concrete until the following applicable items have been signed: Plumbing (Ground/Underfloor Drain Waste) Electrical Ground Electrode/Ufer Setback/Forms/Trenches (Footings) 6/9/25 FINAL INSPECTIONS DATE INGPECTOR All applicable items below must be signed before utilities are released Final Gas Test Electrical Final 6/1025 JAM Plumbing Final 6/10/20 JA Mechanical Final 이어 JAM Cross Connection Control (714) 765-4280 Engineering Final (714) 765-5126 Fire Sprinkler (ONLY) (714) 765-5041 Fire Dept. Final (714) 765-5041 JAM Water Engineering (714) 765-4591 Do not install subfloor or pour floor slab until the follwing applicable items have been signed: Plumbing (Ground/Underfloor Water) Underfloor Rough Gas Mechanical (Groundwork) Electrical (Underground Conduit) Sub List/Bus. Lic. (714) 765-5194 (Allow 10 business days) COA/Migation Measures Building Final (714 765-5153) Last Inspection-Final Only After Above Completed 25 JAM. PARTIAL INSPECTIONS Building Inspections Pre-slab (Compaction/Membrane Reinf.) Floor (Joist/Girders) Underfloor Insulation (Raised Foundation Only) Floor Nailing (Raised Foundation Only) 2nd Floor (Floor Nailing) Do not cover or conceal the work below until the following applicable items have been sianed: 1st Floor Shear Firesprinkler (Rough) (Fire Dept.) 2nd Floor Shear Roof (Sheathing/Diaphragm/Frame) Mechanical Inspections Masonry (Reinf./Bond Beam/Pre-Grout) Rough Plumbing (Top Out)6/9/25 JAM Rough Duct (Mechanical) Rough Mechanical 6/9/25 JAM Rough Electrical bja/25 JAM Rough COA/Mitagation Measures Plumbing Inspections Framing (Only after Plbg., Ele., Mec. & Fire) Insulation (Sound/Energy) Do not tape or plaster until the following applicable items have been signed: Drywall Drywall Penetrations (Ele, Mec & Plbg) Interior Lath Exterior Lath Electrical Inspections Electrical Service Meter-(Meter will be set within 2-3 business days after approval) Excludes New Construction Exterior Plaster (Brown Coat) T-Bar (Struct., Ele., or Mec.) Grease Interceptor (Do not backfill unless sianed off) Sewer Water Engineering Backflow (Testable Only) Water Service