1533 W KIMBERLY AVE (9)Permit Types
BLD ELE MEC PLM
X X
Permit Number: BLD2025-02065
Issued: 04/28/2025
CITY OF ANAHEIM
BUILDING DIVISION
200 S. ANAHEIM BLVD.
(714) 765-5153
www.anaheim.net/building
(714)765-4626
Quarter Section: 57
Site Address: 1533 W KIMBERLY AVE ANAHEIM, CA 92802
Legal Description: N TR 2903 BLK LOT 37
APN: 12941106
Project Description: Patio Cover: 286 sq. ft. to install aluminum patio cover with electrical at rear of house.
Living Area:
Garage Area:
Carport Area:
Balcony/ Deck Area:
Cool Roof:
Number of Stories:
M CALIFORANAHEIMOFA
QUNDED 185
1 Valuation:
Construction Types:
4,000.00
N/A
Occupancy Groups:
Fire Sprinklered:
Total Fees paid for Permit:
People Associated with Project:
Contractor
Permit Applicant
Owner
DI-LAR INDUSTRIAL SUPPLY INC DBA L J HAU
Juan Garcia
BUI CHRISTINE THANH-LIEM TR
1571 PARKWAY LOOP STE CABCDE11138981 TUSTIN, CA 92780
1533 W KIMBERLY AVE
No
702.26
Type
Receptacle, switches, lights
Electrical Fixtures Qty Typе Plumbing Fixtures Qty Mechanical Fixtures Qty
4
The permit shall expire by limitation and become null and void if the building or work has not passed final inspection 365 days from the
date of permit issuance. A new permit is required to commence or continue work.
City of Anaheim
Building Division
FINAL INSPECTIONS DATE INSPECTOR
All applicable items below must be signed before utilities are released
OF ANAHEIM CALIFO Final Gas Test
FOUNDED 18
Do not occupy this building until the final inspections have been made.
INSPECTION DATE INSPECTOR
Do not pour concrete until the following applicable items have been signed:
Plumbing (Ground/Underfloor Drain Waste)
Electrical Ground Electrode/Ufer
Setback/Forms/Trenches (Footings)
Do not install subfloor or pour floor slab until the follwing applicable items have been
sianed:
Plumbing (Ground/Underfloor Water)
Underfloor Rough Gas
Mechanical (Groundwork)
Electrical (Underground Conduit)
Pre-slab (Compaction/Membrane Reinf.)
Floor (Joist/Girders)
Underfloor Insulation (Raised Foundation Only)
Floor Nailing (Raised Foundation Only)
2nd Floor (Floor Nailing)
Do not cover or conceal the work below until the following applicable items have
been signed:
1st Floor Shear
Firesprinkler (Rough) (Fire Dept.)
2nd Floor Shear
Roof (Sheathing/Diaphragm/Frame)
Masonry (Reinf./Bond Beam/Pre-Grout)
Rough Plumbing (Top Out)
Rough Duct (Mechanical)
Rough Mechanical
Rough Electrical
Rough COA/Mitagation Measures
Framing (Only after Plbg., Ele., Mec. & Fire)
Insulation (Sound/Energy)
Do not tape or plaster until the following applicable items have been signed:
Drywall
Drywall Penetrations (Ele, Mec & Plbg)
Interior Lath
Electrical Final
Plumbing Final
Mechanical Final
Cross Connection Control (714) 765-4280
Engineering Final (714) 765-5126
Fire Sprinkler (ONLY) (714) 765-5041
Fire Dept. Final (714) 765-5041
Water Engineering (714) 765-4591
610288
Sub List/Bus. Lic. (714) 765-5194 (Allow 10 business days)
COA/Migation Measures
Building Final (714 765-5153)
Last Inspection-Final Only After Above Completed 19102516
PARTIAL INSPECTIONS
Building Inspectionsa LEDGTR
Mechanical Inspections
Plumbing Inspections
Exterior Lath
Electrical Service Meter-(Meter will be set within 2-3
business days after approval) Excludes New
Construction
Exterior Plaster (Brown Coat)
T-Bar (Struct., Ele., or Mec.)
Grease Interceptor
(Do not backfill unless sianed off)
Sewer
Water Engineering Backflow (Testable Only)
Water Service
Electrical Inspections