1251 E BASSETT WAYPermit Types
BLD ELE MEC PLM
X
Permit Number. BLD2023-02701
Issued: 06/01/2023
CITY OF ANAHEIM
www.anaheim.net/building
(714)765.4626
Quarter Section: 105
Slits Address:1251 E BASSETT WAY, ANAHEIM, CA 92805
Legal DDescriptlow N TR 6812 BLK LOT 40
APN:23469140
BUILDING DMSION
200 S. ANAHEIM BLVD.
(714) 765 -5153
Project Description: Re -roof, tear -off existing and install ( 25) sq. of composition shingles on entire house and attached garage.
Uving Area: Number of Stories: t Valuation: 13,000.00
Garage Area: Construction Types: NIA
Carport Area: Occupancy Groups:
Balcony I Deck Area: Fire Sprinidered:
Cool Roof: Total Fees paid for Kermit: 339.69
People Associated with Project:
Contractor MILAYVA ROOF CO 405 N POWDER HORN DR ANAHEIM, CA 92807
Permit Applicant MANUEL JCARRILLO 1118 N ADAIR PL ANAHEIM, CA 92806
Owner ESCAMILLA FANI MAYRA ALARRAZABAL 1251 E BASSETT WAY
Type Electrical Fixtures Qty Type Plumbing Fixtures Qty Mechanical Fixtures City
The permit shall expire by limitation and become null and void If the building or work has not passed final Inspection 365 days from the
date of permit Issuance. A new permit is required to commence or continue work.
City of Anaheim
Building Division
Do not occupy this building until the final inspections have been made.
INSPECTION I DATE I INSPECTOR
Do not pour concrete until the following applicable items have been signed:
Plumbing (Ground/Underfloor Drain Waste)
Electrical Ground Electrode/Ufer
Setback/Forms/Trenches (Footings)
Do not install subfloor or pour floor slab until the follwing applicable items have been
sinned:
Plumbing (Ground/Underfloor Water)
Underfloor Rough Gas
Mechanical (Groundwork)
Electrical (Underground Conduit)
Pre -slab (Compaction/Membrane Reinf.)
Floor (JoisUGirders)
Underfloor Insulation (Raised Foundation Only)
Floor Nailing (Raised Foundation Only)
2nd Floor (Floor Nailing)
Do not cover or conceal the work below until the following applicable items have
been s' e
1st Floor Shear
Firesprinkler (Rough) (Fire Dept.)
2nd Flo r
Roo ( eathin phragm/Frame)
Masonry (Reinf./Bond Beam/Pre-Grout)
Rough Plumbing (Top Out)
Rough Duct (Mechanical)
Rough Mechanical
Rough Electrical
Rough COA/Mitagation Measures
Framing (Only after Plbg., Ele., Mac. & Fire)
Insulation (Sound/Energy)
Do not tape or plaster until the following applicable items have been signed:
Drywall
Drywall Penetrations (Ele, Mec & Plbg)
Interior Lath
Exterior Lath
Electrical Service Meter -(Meter will be set within 2-3
business days after approval) Excludes New
Construction
Exterior Plaster (Brown Coat)
T -Bar (Struct., Ele., or Mec.)
Grease Interceptor
Sewer
Faate:
Engineering Backflow (Testable Only)r Service
FINAL INSPECTIONS DATE I INSPECTOR
All applicable items below must be signed before utilities are released
Final Gas Test
Electrical Final
Plumbing Final
Mechanical Final
Cross Connection Control (714) 765-4280
Engineering Final (714) 765-5126
Fire Sprinkler (ONLY) (714) 765-5041
Fire Dept. Final (714) 765-5041
Water Engineering (714) 765-4591
Sub List/Bus. Lic. (714) 765-5194 (Allow 10 business days)
COA/Migation Measures
Building Final Final my Aft 53) KI—AV Last Inspection -Final Only After Above Completed
PARTIAL INSPECTIONS
Building Inspections
Mechanical Inspections
Plumbina Inspections
Electrical Inspections