Loading...
1251 E BASSETT WAYPermit Types BLD ELE MEC PLM X Permit Number. BLD2023-02701 Issued: 06/01/2023 CITY OF ANAHEIM www.anaheim.net/building (714)765.4626 Quarter Section: 105 Slits Address:1251 E BASSETT WAY, ANAHEIM, CA 92805 Legal DDescriptlow N TR 6812 BLK LOT 40 APN:23469140 BUILDING DMSION 200 S. ANAHEIM BLVD. (714) 765 -5153 Project Description: Re -roof, tear -off existing and install ( 25) sq. of composition shingles on entire house and attached garage. Uving Area: Number of Stories: t Valuation: 13,000.00 Garage Area: Construction Types: NIA Carport Area: Occupancy Groups: Balcony I Deck Area: Fire Sprinidered: Cool Roof: Total Fees paid for Kermit: 339.69 People Associated with Project: Contractor MILAYVA ROOF CO 405 N POWDER HORN DR ANAHEIM, CA 92807 Permit Applicant MANUEL JCARRILLO 1118 N ADAIR PL ANAHEIM, CA 92806 Owner ESCAMILLA FANI MAYRA ALARRAZABAL 1251 E BASSETT WAY Type Electrical Fixtures Qty Type Plumbing Fixtures Qty Mechanical Fixtures City The permit shall expire by limitation and become null and void If the building or work has not passed final Inspection 365 days from the date of permit Issuance. A new permit is required to commence or continue work. City of Anaheim Building Division Do not occupy this building until the final inspections have been made. INSPECTION I DATE I INSPECTOR Do not pour concrete until the following applicable items have been signed: Plumbing (Ground/Underfloor Drain Waste) Electrical Ground Electrode/Ufer Setback/Forms/Trenches (Footings) Do not install subfloor or pour floor slab until the follwing applicable items have been sinned: Plumbing (Ground/Underfloor Water) Underfloor Rough Gas Mechanical (Groundwork) Electrical (Underground Conduit) Pre -slab (Compaction/Membrane Reinf.) Floor (JoisUGirders) Underfloor Insulation (Raised Foundation Only) Floor Nailing (Raised Foundation Only) 2nd Floor (Floor Nailing) Do not cover or conceal the work below until the following applicable items have been s' e 1st Floor Shear Firesprinkler (Rough) (Fire Dept.) 2nd Flo r Roo ( eathin phragm/Frame) Masonry (Reinf./Bond Beam/Pre-Grout) Rough Plumbing (Top Out) Rough Duct (Mechanical) Rough Mechanical Rough Electrical Rough COA/Mitagation Measures Framing (Only after Plbg., Ele., Mac. & Fire) Insulation (Sound/Energy) Do not tape or plaster until the following applicable items have been signed: Drywall Drywall Penetrations (Ele, Mec & Plbg) Interior Lath Exterior Lath Electrical Service Meter -(Meter will be set within 2-3 business days after approval) Excludes New Construction Exterior Plaster (Brown Coat) T -Bar (Struct., Ele., or Mec.) Grease Interceptor Sewer Faate: Engineering Backflow (Testable Only)r Service FINAL INSPECTIONS DATE I INSPECTOR All applicable items below must be signed before utilities are released Final Gas Test Electrical Final Plumbing Final Mechanical Final Cross Connection Control (714) 765-4280 Engineering Final (714) 765-5126 Fire Sprinkler (ONLY) (714) 765-5041 Fire Dept. Final (714) 765-5041 Water Engineering (714) 765-4591 Sub List/Bus. Lic. (714) 765-5194 (Allow 10 business days) COA/Migation Measures Building Final Final my Aft 53) KI—AV Last Inspection -Final Only After Above Completed PARTIAL INSPECTIONS Building Inspections Mechanical Inspections Plumbina Inspections Electrical Inspections